| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.8 LAccepted-Finance | L1 | Accepted-Finance Lowest Belo | |
| 2 | L2₹39.9 L+₹2,793.23 (0.07%)Rejected-Finance | L2 | Rejected-Finance Not Lowest Belo | |
| 3 | L3₹39.9 L+₹5,187.42 (0.13%)Rejected-Finance | L3 | Rejected-Finance Not Lowest Belo | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹39.9 L
EMD Value
₹4.0 L
Closing Date
28 May 2026, 12:00 pmClosed
Executive Officer
Nagar palika Parishad Chitrakootdham
Construction of Barha Hanuman Mandir ke Pass Shed work
2026_DOLBU_1142484_1
265/2026-27/ETender Date 24-04-2026
Open Tender
Civil Works
Fixed-rate
60 days
Nagar palika Parishad Chitrakootdham
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,708
Yes
Executive Officer
₹4.0 L
Yes
15 Jun 2026
27 Apr 2026
28 May 2026
27 Apr 2026
28 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. | 1 | cum | 120 | ₹119.88 |
| 2 | Supply and laying of local sand/stone dust | - | cum | 1,000 | - |
| 3 | Cement concrete with 4cm (1/2") gauge approved stone ballast, approved coarse sand, cement in the proportion 1:4:8 including supply of all materials, labour and tools and plants etc. required for proper completion of the work. SI No. 281 | - | cum | 4,200 | - |
| 4 | Class-150 Brick work in 1:4cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools ans plants etc required for proper completion of the work .SI No.305 | - | cum | 5,400 | - |
| 5 | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1:1.5:3 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. SI No 279 | 1 | cum | 6,000 | ₹5,994 |
| 6 | Kota Stone work (machine cut edges Veneer work) for wall lining upto 10 m height,backing filled with a grout of 12 mm thick cement mortar 1:3 (1 Cement : 3 coarse sand) and jointed with cement mortar 1:2 (1 cement : 2 stone dust), including rubbing and polishing complete. (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately). SI No. 7.37.1.1 | - | sqm | 900 | - |
| 7 | R.C.C. works cement appoved coatsesand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4in Foundation excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc. and also including supply of all materials, labour and tools and plants etc. requred for proper completion of the work binding wire to be supplied by the contractor free of cost. | 1 | cum | 7,220 | ₹7,212.78 |
| 8 | R.C.C. works cement appoved coatsesand and 2cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 in Colums excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc. and also including supply of all materials, labour and tools and plants etc. requred for proper completion of the work binding wire to be supplied by the contractor free of cost. | 1 | cum | 7,921 | ₹7,913.08 |
| 9 | R.C.C. works cement appoved coatsesand and 2cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 in Plinth Beam excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc. and also including supply of all materials, labour and tools and plants etc. requred for proper completion of the work binding wire to be supplied by the contractor free of cost. | - | cum | 7,420 | - |
| 10 | R.C.C. works cement appoved coatsesand and 2cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 in Slab/ T-Beam excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc. and also including supply of all materials, labour and tools and plants etc. requred for proper completion of the work binding wire to be supplied by the contractor free of cost. | - | cum | 7,620 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_2133706.xls
BOQ • 0.29 MB
265NITVandanYojnaBarhaHanuman.pdf
Tender Documents • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .