| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical GST cancelled |
| 4 | Rejected-Technical | Rejected-Technical GST cancelled |
Tender Value
₹24 L
EMD Value
₹24,000
Closing Date
15 Jun 2020, 2:30 pmClosed
SE/GEDC/GOBI
SE/GEDC, 132 D, CUTCHERRY STREET, GOBI
WCT FOR EREC, DISM,TRANS OF POLES,DT,HT/LT LINES AND OTHER EXTENSION WORKS IN NAMBIYUR SUB DIVISION
2020_EB_165538_1
ET.NO.01 DT.27.05.2020
Open Tender
Electrical Works
Works
365 days
SE/GEDC
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,000
Yes
17 Jul 2020
29 May 2020
16 Jun 2020
29 May 2020
15 Jun 2020
29 May 2020
Amount
Excavation of pole pit upto 27" (8.0 m) Pole by using JCB or manual
Excavation of stay pit 4.5' to 5' depth by using JCB or manual
Excavation of pole pit upto 9.14 mtr Pole by using JCB or manual
Excavation of RSJ pole pit above 36' by using JCB or manual
Excavation of pole/stay pit hard rock requires blasting
Excavation of poles /stay pit hard rock without blasting (where houses are located)
Excavatiion of medium rock and dense medium rock requires blasting
Erection of RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Erection of RCC poles/Metal poles upto 9.14m.(30') by using JCB or maual
Erection of RSJ joists, fabricated poles above 30'-0" (9.14 m) by using JCB or manual.
Erection of RSJ joists, fabricated poles above 36'-0' by using JCB or maual
Erection of stay set complete
Fixing of HT "V" cross arms(all types) / channel cross arms/guarding Cross arms
Fixing of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Fixing of HT pin Insulators 11 KV
Fixing of HT pin Insulators 22 KV
Fixing of HT 11 KV strain disc
Fixing of HT 22 KV strain disc.
Fixing of LT pin Insulator
Fixing of LT shackle
Fixing of Aluminium Knob
Fixing of double channel X arm
Fixing of Guarding Cross arm
Fixing of Tapping Channel Cross arm
Fixing of HT LAS (3 nos)
Fixing of LT LAS (3nos)
Earthing of pole with pin including burying looping and binding.
Paving of conductor,stringing etc.. Complete with 7/4.09 mm ACSR conductor.
Paving of conductor,stringing etc. complete with 7/3.35 mm ACSR 7/3.0 mm AAAC.
Paving of conductor ,stringing etc.complete with 7/2.59 mm ACSR 7/2.11 mm ACSR
Painting of metal poles including cross arms (Single coating)
Painting of numbering of pole with paint and with base painting
Painting of RCC poles including of poles with colour cement
Mass concreting including materials (Cement 1/2 bag + river sand and Blue metals and watering).
Sleeve concreting including materials (Cement 1/2 bag + river sand and Blue metals and watering).
Erection of Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (Except erection of Transformer)
LT Split neutral guarding
Flat guarding including fixing of 2 Nos. cross arms
HT Guarding
Transporting of poles/Materials/Conductors and other materials (excluding loading and unloading charges) below 8 kms
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)above 8 KM for additional KM.
Loading of poles upto 27'-0"
Loading of poles upto 30'-0"/RSJ Pole
Un loading of poles upto 27'-0"
Un loading of poles upto 30'-0"/RSJ Pole
Loading of cement bag of 50kg
Unloading of cement bag of 50kg
Loading of transformer oil drum with oil 200 Lit.capacity
Unloading of transformer oil drum with oil 200 Lit.capacity
Transporting of poles from road site to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road site to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Loading or unloading of Transformer upto 200 KVA for each
Loading /Unloading of Distribution Transformer above 200 KVA for each
Erection of New Transformer upto 200 KVA
Erection of new transformer above 200 KVA
Replacement of failed transformer upto 200 KVA
Replacement of failed transformer above 200 KVA
Erection of 16 KVA DT with single pole structure
Erection of 25 KVA DT with single pole structure
Erection of 40 KVA DT with double pole structure
Loading & Erection of HT metering set
Manufacturing of special type clamps for rail poles RS joists,tobolar pole special clamps for distribution transformer structure
Fixing of top channel
Fixing of cross bracing
Earthing of DP complete
Conversion of pin point to cut point-LT: Dismantling of LT Pin
Conversion of pin point to cut point-LT: Fixing of LT Shackle
Conversion of pin point to cut point-LT: Dismantling of Aluminium Knob
Conversion of pin point to cut point-LT: Removing the pins
Conversion of pin point to cut point-HT: Fixing the strain disc
Conversion of pin point to cut point Re-Sagging (HT) 7/4.09mm
Conversion of pin point to cut point Re-Sagging (HT) 7/3.35mm
Conversion of pin point to cut point Re-Sagging (HT) 7/2.59mm
Erection of street light including fixure fitting
Erection of street light service
Fixing of new SV/MV lamp fittings
Releasing of grills from RCC Poles
Painting of transformer (only one coat)
Erection of D.P. structure with AB switch top channel, cross brancing, HG fuse set, earthing painting earthing painting, providing stay and pole concreting
Labour charges for alteration of back clamps
Labour charges for alteration of stay clamps
Erection of new earth pipe by replacing the corroded earth pipe
Providing LT bus bar arrangement in distn. Trs. Structure location
Fixing of meter on LV side of DT with CT
Fixing of meter on LV side of DT without CT
Cutting of flat
Cutting of channel
Cutting of Angle
Cutting of pipe
T.I.Fitting welding with clamps
RS joists pole one cut and one welding
Dismantling of RCC poles/metal poles upto 8.00m (27') by using JCB or manual
Dismantling of RCC poles/metal poles upto 9.14m (30') by using JCB or manual
Dismantling of RSJ joists,fabricated poles above 30' 0" (9.14m) by using JCB or manual
Dismantling of RSJ Joists,Fabricated poles above 36'-0' by using JCB or manual
Dismantling HT "V" Cross arms (all types) / channel cross arms /guarding corss arms
Dismantling LT3 Phase cross arms
Dismantling LT Single phase cross arm
Dismantling of HT/LT TI Fittings
Dismantling of HT Pin Insulators 11 KV
Dismantling of HT Pin Insulators 22 KV
Dismantling of 33 KV Pin insulator
Dismantling of HT 11KV Strain disc
Erection of new 10' Earth pipe replacing the carroded earth pipe and renewal of earthing including burying looping and binding
Releasing of ACSR/AAAC conductors from conductor drum and coiling ACSR 7/3.35,7/2.59,AAAC 7/2.50,7/3.15MM (Per/Km)
Releasing of ACSR/AAAC conductors from existing line and coiling ACSR 7/3.35,7/2.59,AAAC 7/2.50,7/3.15MM (Per/Km)
Cutting of coconut leaves
Drilling of holes in channel only 3/4" & 1" per pole
Set right the leaning pole in HT/LT at Pin Point location
Set right the leaning pole in HT/LT at cut point
Resagging of lines for all sizes at cut point location per wire/span and dismantling of existing HT/LT line
SRI DEVI AMMAN AND CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .