Loading…
Loading…
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
25 Aug 2026, 10:00 amDue today
EXECUTIVE OFFICER,KETUGRAM-I PANCHAYAT SAMITY
KANDRA, PURBA BARDHAMAN, PIN-713129
CONSTRUCTION OF BOUNDARY WALL OF MOURI MAJHINA F.P SCHOOL AT MOURI VILLAGE, JL NO- 03, PLOT NO- 367, MOUZA- MOURI, UNDER ANKHONA G.P, WITHIN KETUGRAM-I PANCHAYAT SAMITY. FUND- BEUP, 2024-2025.
2026_ZPHD_1038032_1
01_P.S_2026-27
Open Tender
CIVIL WORKS
Percentage
MOUZA- MOURI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,750
₹7,000
14 Aug 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
25 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed ……….bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | 17 | Cum | 119.27 | ₹2,027.59 |
| 2 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 8.5 | Cum | 640.86 | ₹5,447.31 |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 27.07 | Sqm | 324 | ₹8,770.68 |
| 4 | Ordinary Cement concrete with well graded stone chips (20 mm graded nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS 45............ In ground floor and foundation.
[using concrete mixture] 1:1.5:3 proportation ] i) In ground floor and foundation. | - | Cum | 5,536.41 | - |
| 5 | Reinforcement for reinforced conc. work in sorts of work in all sorts of structures including distribution bars, strirrups, binders etc initial straightening and removalof loose rust(if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge balck annealed wire at every intersection, complete as per drawing and direction. I. SAIL/TATA/RINL | 0.4 | MT | 60,003 | ₹24,000.6 |
| 6 | Hire & labour charges for shuttering with centering and necessary stagging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works(upto roof of ground floor) a)25mm to 30mm wooden shuttering without props. | 81.27 | Sqm | 205 | ₹16,660.35 |
| 7 | Hire & labour charges for shuttering with centering and necessary stagging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works(upto roof of ground floor) f)25mm to 30mm wooden shuttering with props | - | Sqm | 328 | - |
| 8 | Net cement punning(ground Floor) | 1 | Sqm | 34 | ₹33.97 |
| 9 | Redoxide wash of approved shade including cleaning and smoothing surface thoroughly. | 6.48 | Sqm | 33.11 | ₹214.55 |
| 10 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved qualityincluding smoothing surfaces by sand. | 6.48 | Sqm | 29 | ₹187.92 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.01 MB
BOQ_2550030.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].