Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹15,600
Closing Date
9 Dec 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM I Breakdown Maintenance work in Main Turbine its Auxiliaries in Unit I to IV for a period of One year during 2026 27 as and when required basis
2026_EB_731168_1
CE / MTPS-I / SE / M-I / TM /OT. 269 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
365 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹15,600
Yes
25 Nov 2026
25 Nov 2026
10 Dec 2026
25 Nov 2026
9 Dec 2026
25 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, overhauling and assembling of HP & IP control valve columns. Dismantling the control valve columns after loosening the bolts, dismantling its liners, spring assembly liner sliding pin, dismantling the roller bearings, cleaning the above items, inspection of liner key way and measuring the dimension, welding and grinding to the dimension required, greasing the bearing, assembling the dismantled parts and setting the roller clearance as per the direction of engineer in charge. | 3 | Nos | - | - |
| 2 | Dismantling, inspection, and changing of HP & IP control valves: Cutting the spindle leak off lines, heating the cap nut of steam chest by gas, dismantling the control valve assembly from steam chest, cleaning of all parts removal of steam strainer and cleaning spare valve and valve seat lapping and checking blue matching, steam chest flange lapping and blue matching, checking valve stem and liner clearance, valve stem DYE penetrant checking etc., a). Dismantling the control valve assembly from steam chest, cleaning of all parts, removal of steam strainer and cleaning spare valve and valve seat lapping and checking blue matching, Assembling the spare valve with steam chest and tightening the cap nut etc., checking Idle lift connecting the spindle leak off lines and welding as per the direction of the Engineer-in- charge. | 2 | Nos | - | - |
| 3 | b). Drilling the hole in the stem for providing spilt pin, providing the split pin, checking the washer clearance, checking valve lift etc. | 2 | Nos | - | - |
| 4 | Dismantling front pedestal cover, overhauling of main oil pump, intermediate pilot valve, Speed load control assembly, Differentiator, EGPV, turbine trip switch, CVSM feed pack pilot Control pilot & over speed striker. Dismantling of front bearing pedestal top cover, disconnecting the oil pipe lines, dismantling the gear coupling inspection & rectification dismantling of main oil pump, rotor float checking, side and top oil clearance checking. Inspection of impeller, wear ring clearance checking inspection of bearings and doing correction works, replacement of bearings, gear coupling if required. MOP & HP rotor alignment checking and correcting the same and assembling the gear coupling and MOP cover. Dismantling the MOP NRV, lapping and blue matching and assembling, Dismantling, cleaning, inspection and assembling of follow pilot, summation pilot, load/speed control pilot, speeder gear assembly, EGPV, intermediate pilot, differentiator, CVSM feedback pilot etc., Speed governor sleeve to nozzle, EGPV lever to over speed striker to rubber. | 2 | Nos | - | - |
| 5 | Dismantling the bearing cover, checking the bearing interference and assembling after C & I work: Dismantling the bearing cover by loosening the cap nuts, checking the bearing to cover Interference attending correction if any and assembling after cleaning the parting plane and after completion of C & I works. | 4 | Nos | - | - |
| 6 | Checking the hot governing characteristics and adjusting the valve openings as per the instruction of Engineer in-charge including tools and tackles. | 8 | Nos | - | - |
| 7 | Dismantling of oil inlet and outlet pipe lines to centrifuge, dismantling of motor, break drum, bowl assembly and pump assembly. Cleaning, inspection, Renewal of damaged spares, bearings, oil seals and assembling, successful commissioning of the Alfa Laval centrifuge. | 8 | Nos | - | - |
| 8 | Cleaning of Oil line, renewal of oil line gaskets and painting etc, in Alfa Laval centrifuge. | 2 | Nos | - | - |
| 9 | Charges for Dismantling of inlet and outlet oil lines connected to oil pumps and heater tank & cleaning etc., in Pennwalt centrifuge. | 2 | Nos | - | - |
| 10 | Charges for dismantling of Suction pump assembly, cleaning all internals, renewal of Bearings, oil seals, oil gaskets and assembling etc., in Pennwalt centrifuge. | 4 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_877422.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .