| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.0 LAccepted-Finance 00 SANJAY KUMAR SINGH DHEMOMAIN COLLIERY 5 NO ASANSOL BARDHAMAN WEST BENGAL 713367 | PASCHIM BARDHAMAN | WEST BENGAL | 713367 | L1 | Accepted-Finance L1 | |
| 2 | L2₹87.0 L+₹1,740.68 (0.02%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹87.0 L+₹2,611.01 (0.03%)Rejected-Finance GRAM PATNA POST MEHRAUNA JANPAD DEVARIA | L3 | Rejected-Finance L3 |
Tender Value
₹87.0 L
EMD Value
₹8.7 L
Closing Date
4 Jun 2026, 3:00 pmClosed
EO NPP DEORIA
NPP DEORIA
WARD NO 08 ME KHARJARWA CHAURAHA SE UK ACADEMY TAK RCC NALA NIRMAN KARYA.
2026_DOLBU_1148226_24
Ref.515/Ni.Vi.-26-27/Deoria Dated 13-05-2026
Open Tender
Civil Works
Percentage
180 days
NPP DEORIA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,770
₹8.7 L
18 Jun 2026
14 May 2026
5 Jun 2026
14 May 2026
4 Jun 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clearance including labour and materials and including grass cutting and carriage of materials by Head load . | 1 | Job | 13,800 | ₹13,800 |
| 2 | Dewatering works during construction at site for day and night as required during the execution of the entire work till its completion The rate including of the pump,fuel,labourT&P etc. | 3,000 | Hour | 240 | ₹7,20,000 |
| 3 | E/W in Excavation in ordenery soil in foudation including labour and materials and T/P with all com. Work SI No. 251 | 1,875 | Cum | 120 | ₹2,25,000 |
| 4 | Disposal of Excavated waste mterial from site upto 3.00Km Distance etc all comp. work. | 1,312.5 | Cum | 146.2 | ₹1,91,887.5 |
| 5 | C.C. Work in 1:4:8 in cement, Coarse sand and 40 mm Gauge Stone Ballast including labour and materials , T/P with all com. Work SI No. 281 | 112.5 | Cum | 5,435 | ₹6,11,437.5 |
| 6 | R.C.C. Work in Raft Foundation 1:1.5:3 in cement coarse sand and 20mm gauge including labour and materials , T/P with all com. Work SI No.287 | 225 | Cum | 7,190 | ₹16,17,750 |
| 7 | R.C.C. Work in Wall of Nali 1:1.5:3 in cement coarse sand and 20mm gauge including labour and materials , T/P with all com. Work SI No.289 | 271.88 | Cum | 9,560 | ₹25,99,172.8 |
| 8 | R.C.C. Work in 1:2:4 in cement coarse sand and 20mm gauge including labour and matrials , T/P with all com. Work SI No.284 | 20.25 | Cum | 8,335 | ₹1,68,783.75 |
| 9 | MS work in R.C.C. work including labour and materials,T/P with all com. Work SI No.504 | 405.95 | Qtl | 6,000 | ₹24,35,700 |
| 10 | Baricating of Nala including labour and materials T/P with all com. Work . | 1 | Each | 25,000 | ₹25,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_2149184.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .