Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.1 LAccepted-AOC VPO DUMERKHA KALAN TEH NARWANA 126116 | DUMERKHA KALAN | JIND | HARYANA | 126116 | 1 | Accepted-AOC AOC | |
| 2 | 2₹28.6 L+₹50,251 (1.79%)Rejected-Finance PLOT 411 GALI NO 9 GANDHI NAGAR GANDHI NAGAR 122001 | GANDHI NAGAR | GURUGRAM | HARYANA | 122001 | 2 | Rejected-Finance 2 | |
| 3 | 3₹28.7 L+₹62,339 (2.22%)Rejected-Finance C 46 OPP SECTOR 4 SURYA VIHAR GURUGRAM HARYANA | 2025 | 3 | Rejected-Finance 3 | |
| 4 | 4₹29.5 L+₹1.4 L (4.87%)Rejected-Finance N A | 4 | Rejected-Finance 4 |
| Sl No | Description | Qty | Unit | THE ROHINI COOP L&C SOCIETY LTD. L4 | The V.K. Co-Operative Labour & Construction Society Limited L1 | THE JIYA CO-OPERATIVE LABOUR & CONSTRUCTION SOCIETY LIMITED L2 | THE DAT GREENS COOPERATIVE L AND C SOCIETY LIMITED L3 |
|---|---|---|---|---|---|---|---|
| 2.00Upgradation of park lights at Tau devi lal park botanical Garden sector 52 Municipal Corporation Gurugram. | |||||||
| 3.00 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. | 60 | Metre | 91 ₹5,460 | 60 ₹3,600 Lowest | 65 ₹3,900 | 110 ₹6,600 |
| 4.00 | Restoring the road cut, in level with the existing road surface, including preparation of subgrade laying and relaying of soiling and laying and consolidation of wearing coats to water bound macadam specification and laying 20mm thick premix carpet, on top including cost of tack and sealcoat complete in all respects... | 100 | Sqm | 274 ₹27,400 | 30 ₹3,000 Lowest | 35 ₹3,500 | 310 ₹31,000 |
| 5.00 | Supply, Erection, testing and commissioning of 3 phase automatic timer AMSON`s / L and T make on/off the street lights on different fixed timing maintainable on street lights pedestal, pillar, wall M.S pedestal where on\off point is available, cabinet is fabricated from 22 gauge, painting, wiring, connection on/off from bottom of the cabinet, 3 contractor 63 Amp, 24 volts D.C each transformer, rectifier system switching system, bakelite contractor 63 Amp, MCB 63 Amp LandT digital timer Auto/Manual system, time setter, fibber sheet, rubber and plastic component, wiring and component fitting, chemical (Epoxy) including the cost of labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In -Charge of the work. | 5 | Each | 14,760 ₹73,800 | 12,000 ₹60,000 Lowest | 12,500 ₹62,500 | 17,000 ₹85,000 |
| 6.00 | Casting and laying of making of foundation of 1:1.5:3 for foundation of size 0.4m x 0.4m x1.0m minimum 4 nos 12mm dia longitudinal MS reinforcement roads with rings of 40 nos 8mm dia. | 66 | Each | 1,740 ₹1,14,840 Lowest | 1,900 ₹1,25,400 | 2,000 ₹1,32,000 | 2,000 ₹1,32,000 |
| 7.00 | Supply and installation of a 3-meter decorative mild steel galvanized tubular pole with varying profiles. The bottom profile is 1000X114mm, and the top profile is 2000X60mm, with cast aluminum embellishment E3. The pole includes a window and fixed plate at the bottom. It is primer coated and painted.
Fixture: Supply and installation of a 45 Watt Ornamental LED Post Top luminaire with an aluminium housing, powder coated/PU painted, and equipped with a clear/frosted PC/PM diffuser. The luminaire features a sturdy triple arm mount and high lumen LEDs on aluminum heat sinks. Complete in all respect as per approved design specifications. | 66 | Each | 12,597 ₹8,31,402 Lowest | 13,500 ₹8,91,000 | 13,800 ₹9,10,800 | 14,500 ₹9,57,000 |
| 8.00 | Defect liablity period for Replacement of burnt/faulty cables of various sizes 25 X 4 core and 50x4 core cable, HDPE pipe, felxible wire, MCB, MCCB, Earthing, etc., SPMCB, EPMCB, contractor, wiring and other item required for CCMS panel and Installation of material supplied by the M/s Surya Co. as per rate contract term and Condition i.e SPMCB, EPMCB, contractor, wiring etc and other item required for CCMS panel and maintaining the connectivity of CCMS panel with the GMDA/other portal through sim and removing of fault in ccms panel for 1st and 2nd year free of cost complete in all respect of 3rd year @6% of capital cost | 1 | Each | 1,56,388 ₹1,56,388 | 1,000 ₹1,000 Lowest | 1,200 ₹1,200 | - |
| 9.00 | Defect liablity period for Replacement of burnt/faulty cables of various sizes 25 X 4 core and 50x4 core cable, HDPE pipe, felxible wire, MCB, MCCB, Earthing, etc., SPMCB, EPMCB, contractor, wiring and other item required for CCMS panel and Installation of material supplied by the M/s Surya Co. as per rate contract term and Condition i.e SPMCB, EPMCB, contractor, wiring etc and other item required for CCMS panel and maintaining the connectivity of CCMS panel with the GMDA/other portal through sim and removing of fault in ccms panel for 1st and 2nd year free of cost complete in all respect of 4th year @7% of capital cost | 1 | Each | 1,82,453 ₹1,82,453 | 1,500 ₹1,500 Lowest | 1,800 ₹1,800 | - |
| 10.00 | Defect liablity period for Replacement of burnt/faulty cables of various sizes 10x3core,e and 25X 4 core cable SPMCB, EPMCB,contractor, wiring and other item required for CCMS panel and Installation of material supplied by the M/s Surya Co. as per rate contract term and Condition i.e SPMCB, EPMCB, contractor, wiring etc and other item required for CCMS panel and maintaining the connectivity of CCMS panel with the GMDA/other portal through sim and removing of fault in ccms
panel for 1st and 2nd year free of cost | 1 | Each | 1 ₹1 Lowest | 1 ₹1 Lowest | 1 ₹1 Lowest | 1 ₹1 Lowest |
| 11.00 | Supply, Installation testing and commissioning of a 45 Watt Ornamental LED Post Top luminaire made of aluminium housing duly powder coated/PU painted, with PC/PMMA clear/ frosted diffuser with sturdy triple arm .MCPCB having high lumen LED’s are mounted on aluminium heat sinks Complete in all respect (as per approved design specifications). | 45 | Each | 6,182 ₹2,78,190 | 5,800 ₹2,61,000 Lowest | 5,900 ₹2,65,500 | 5,800 ₹2,61,000 Lowest |
Tender Value
₹35.9 L
EMD Value
₹71,837
Closing Date
9 Jun 2026, 12:00 pmClosed
SACHIN YADAV
Municipal Corporation Gurugram
Upgradation of park lights at Tau devi lal park botanical Garden sector 52 Municipal Corporation Gurugram.
2026_HRY_525867_1
202618AAD761 9F7D 4B93 B253 AEEAC3DEBC58285ULB
Open Tender
Civil Works
Works
120 days
Gurugram
Upgradation of park lights at Tau devi lal park botanical Garden sector 52 Municipal Corporation Gurugram.
2 documents required · 2 mandatory
₹1,180
Yes
₹71,837
Yes
18 Jun 2026
1 Jun 2026
9 Jun 2026
1 Jun 2026
9 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Upgradation of park lights at Tau devi lal park botanical Garden sector 52 Municipal Corporation Gurugram. | - | - | - | - |
| 3 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. | 60 | Metre | - | - |
| 4 | Restoring the road cut, in level with the existing road surface, including preparation of subgrade laying and relaying of soiling and laying and consolidation of wearing coats to water bound macadam specification and laying 20mm thick premix carpet, on top including cost of tack and sealcoat complete in all respects... | 100 | Sqm | - | - |
| 5 | Supply, Erection, testing and commissioning of 3 phase automatic timer AMSON`s / L and T make on/off the street lights on different fixed timing maintainable on street lights pedestal, pillar, wall M.S pedestal where on\off point is available, cabinet is fabricated from 22 gauge, painting, wiring, connection on/off from bottom of the cabinet, 3 contractor 63 Amp, 24 volts D.C each transformer, rectifier system switching system, bakelite contractor 63 Amp, MCB 63 Amp LandT digital timer Auto/Manual system, time setter, fibber sheet, rubber and plastic component, wiring and component fitting, chemical (Epoxy) including the cost of labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In -Charge of the work. | 5 | Each | - | - |
| 6 | Casting and laying of making of foundation of 1:1.5:3 for foundation of size 0.4m x 0.4m x1.0m minimum 4 nos 12mm dia longitudinal MS reinforcement roads with rings of 40 nos 8mm dia. | 66 | Each | - | - |
| 7 | Supply and installation of a 3-meter decorative mild steel galvanized tubular pole with varying profiles. The bottom profile is 1000X114mm, and the top profile is 2000X60mm, with cast aluminum embellishment E3. The pole includes a window and fixed plate at the bottom. It is primer coated and painted.
Fixture: Supply and installation of a 45 Watt Ornamental LED Post Top luminaire with an aluminium housing, powder coated/PU painted, and equipped with a clear/frosted PC/PM diffuser. The luminaire features a sturdy triple arm mount and high lumen LEDs on aluminum heat sinks. Complete in all respect as per approved design specifications. | 66 | Each | - | - |
| 8 | Defect liablity period for Replacement of burnt/faulty cables of various sizes 25 X 4 core and 50x4 core cable, HDPE pipe, felxible wire, MCB, MCCB, Earthing, etc., SPMCB, EPMCB, contractor, wiring and other item required for CCMS panel and Installation of material supplied by the M/s Surya Co. as per rate contract term and Condition i.e SPMCB, EPMCB, contractor, wiring etc and other item required for CCMS panel and maintaining the connectivity of CCMS panel with the GMDA/other portal through sim and removing of fault in ccms panel for 1st and 2nd year free of cost complete in all respect of 3rd year @6% of capital cost | 1 | Each | - | - |
| 9 | Defect liablity period for Replacement of burnt/faulty cables of various sizes 25 X 4 core and 50x4 core cable, HDPE pipe, felxible wire, MCB, MCCB, Earthing, etc., SPMCB, EPMCB, contractor, wiring and other item required for CCMS panel and Installation of material supplied by the M/s Surya Co. as per rate contract term and Condition i.e SPMCB, EPMCB, contractor, wiring etc and other item required for CCMS panel and maintaining the connectivity of CCMS panel with the GMDA/other portal through sim and removing of fault in ccms panel for 1st and 2nd year free of cost complete in all respect of 4th year @7% of capital cost | 1 | Each | - | - |
| 10 | Defect liablity period for Replacement of burnt/faulty cables of various sizes 10x3core,e and 25X 4 core cable SPMCB, EPMCB,contractor, wiring and other item required for CCMS panel and Installation of material supplied by the M/s Surya Co. as per rate contract term and Condition i.e SPMCB, EPMCB, contractor, wiring etc and other item required for CCMS panel and maintaining the connectivity of CCMS panel with the GMDA/other portal through sim and removing of fault in ccms
panel for 1st and 2nd year free of cost | 1 | Each | - | - |
| 11 | Supply, Installation testing and commissioning of a 45 Watt Ornamental LED Post Top luminaire made of aluminium housing duly powder coated/PU painted, with PC/PMMA clear/ frosted diffuser with sturdy triple arm .MCPCB having high lumen LED’s are mounted on aluminium heat sinks Complete in all respect (as per approved design specifications). | 45 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_604835.xls
BOQ • 0.28 MB
AD0166731.pdf
Additional Documents • 0.97 MB
OT0166731.pdf
Other Document • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .