| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹320.8 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹379.5 Cr+₹58.7 Cr (18.3%)Admitted-Finance 5TH FLOOR KANKARIA CENTRE 2 1 RUSSEL STREET RUSSEL STREET KOLKATA WEST BENGAL 700071 | KOLKATA | WEST BENGAL | 700071 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Bridge and Roof Co India Ltd L2 | Offshore Infrastructures Ltd L1 |
|---|---|---|---|---|---|
| 1.00SRUCTURAL STEEL | |||||
| 2.00 | Receipt of Structural Materials from OWNER's Store / Storage yard , loading, local transportation up to either Contractor's storage yard / erection site,unloading, assembly, erection, alignment, bolting / welding of Fabricated Structural Steel Elements / Structural Modules in position along with fixing of all type of Connection Bolts (Erection, Hot Dip Galvanised/Non-Galvanised Permanent bolts), shim plates, as per Specifications, Layouts and Fabrication Drawings released for IFC. Scope includes erection of all types of steel structures, pipe racks, pipe bridges, shelters, platforms, structural supports, steel supports inside buildings, etc., Scope shall include all activities like Bolting, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes and / or during fabrication, mechanical / Electrical / Pneumatic Torque Tightening of Bolts, cleaning, giving final touch up paint (specification TP-1ZZZA-PI-SPE-0003) where ever required as per specification to the welded/fabricated parts or damage during transportation and erection, etc as required complete in all respect. All Electrodes shall be in Vacuum packed with a demarcation "H4R". Making necessary arrangement of required labour, equipment, tools & tackles, Cranes, Manlift, steel scaffolding, consumables, transport, etc to execute the works at all heights as per drawings and specifications along with all related works in order that the Structure is handed over to the complete satisfaction of the Engineer-in-charge. (Exclusions: Erection of steel flooring, ladders, stairways, and handrails).
Permanent connection Bolts shall be supplied as Free Issued Material to the Erection Contractor. However, Contractor to supply Temporary erection Bolts and shim plates within the quoted Price for erection. Measurement shall be done as per AFC Fabrication drawing Net weight. Weight of Tempoary erection bolts shall not be considered for payment. | 19,600 | MT | 41,010 ₹80,37,96,000 | 30,000 ₹58,80,00,000 Lowest |
| 3.00 | Supply and Fabrication as per TP-1ZZZA-CV-SPE-0021 and as per AFC drawings provided, surface preparation and Painting as per Painting Specification TP-1ZZZA-PI-SPE-0003 Table-11 and installation of Structural Steel including plates etc. for Miscellaneous activities wherever required.
Measurement shall be As per AFC Fabrication Drawings net weight reports. No wastages considered | 400 | MT | 1,52,730 ₹6,10,92,000 | 1,31,500 ₹5,26,00,000 Lowest |
| 4.00 | Receipt and Unloading of pre fabricated structure at owner's storage yard /Laydown Area from vendor's truck/trailor. | 19,200 | MT | 2,820 ₹5,41,44,000 | 1,050 ₹2,01,60,000 Lowest |
| 5.00HANDRAIL | |||||
| 6.00Receipt of Fabricated Materials from OWNER's Store / Storage yard, loading, local transportation up to Contractor's store / erection site, unloading, assembly, Erection of already fabricated and painted Handrails as per requirements indicated in Standard Drawings, IFC Layouts and Fabrication Drawings. Scope shall include all activities like fixing of all type of Connection Bolts (Erection, Hot Dip Galvanized/Non-Galvanized Permanent bolts) as per Specifications, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes, Torque Tightening of Bolts, cleaning, giving final touch up paint as per specifications to the welded / fabricated parts, etc as required complete with all tools and tackles , equipment and labour, for all and heights along with all related works in order that the Structure handrails is handed over to the complete satisfaction of the Engineer-in-charge. Permanent connection Bolts shall be supplied as Free Issued Material to the Erection Contractor. However, Contractor to supply Temporary erection Bolts and shim plates within the quoted Price for erection. Supply of erection nuts and bolts / fasteners are included in this item. Measurement shall be As per AFC Fabrication Drawings Net weight. | |||||
| 7.00 | For straight handrail | 250 | MT | 50,710 ₹1,26,77,500 | 25,000 ₹62,50,000 Lowest |
| 8.00 | For stair case/inclined handrail | 26 | MT | 63,390 ₹16,48,140 | 30,000 ₹7,80,000 Lowest |
| 9.00 | For circular handrail | 7 | MT | 76,065 ₹5,32,455 | 32,500 ₹2,27,500 Lowest |
| 10.00 | For Davit | 12 | MT | 50,710 ₹6,08,520 | 30,000 ₹3,60,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.5 Cr
Closing Date
11 Oct 2023, 3:00 pmClosed
SANKHA PANDA
A4, TECHNIP ENERGIES INDIA LIMITED, NOIDA
STRUCTURAL ERECTION ABOVE GROUND PIPING FABRICATION AND ERECTION EQUIPMENT ERECTION PIPING AND EQUIPMENT INSULATION AND OTHER ASSOCIATED MISCELLANEOUS WORKS FOR INTERCONNECTING PIPERACK MPMC EPCM UNITS FOR NREP PROJECT AT NUMALIGARH REFINERY
2023_NRL_766398_1
TPIL/CONS/NRL/082176C/050
Open Tender
Construction Works
Works
720 days
NUMALIGARH REFINERY ASSAM
AS PER NIT
6 documents required · 6 mandatory
₹0
₹1.5 Cr
Yes
ONLINE MS TEAMS
2 Feb 2024
16 Aug 2023
12 Oct 2023
16 Aug 2023
11 Oct 2023
15 Sept 2023
16 Aug 2023 - 23 Aug 2023
25 Aug 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SRUCTURAL STEEL | - | - | - | - |
| 2 | Receipt of Structural Materials from OWNER's Store / Storage yard , loading, local transportation up to either Contractor's storage yard / erection site,unloading, assembly, erection, alignment, bolting / welding of Fabricated Structural Steel Elements / Structural Modules in position along with fixing of all type of Connection Bolts (Erection, Hot Dip Galvanised/Non-Galvanised Permanent bolts), shim plates, as per Specifications, Layouts and Fabrication Drawings released for IFC. Scope includes erection of all types of steel structures, pipe racks, pipe bridges, shelters, platforms, structural supports, steel supports inside buildings, etc., Scope shall include all activities like Bolting, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes and / or during fabrication, mechanical / Electrical / Pneumatic Torque Tightening of Bolts, cleaning, giving final touch up paint (specification TP-1ZZZA-PI-SPE-0003) where ever required as per specification to the welded/fabricated parts or damage during transportation and erection, etc as required complete in all respect. All Electrodes shall be in Vacuum packed with a demarcation "H4R". Making necessary arrangement of required labour, equipment, tools & tackles, Cranes, Manlift, steel scaffolding, consumables, transport, etc to execute the works at all heights as per drawings and specifications along with all related works in order that the Structure is handed over to the complete satisfaction of the Engineer-in-charge. (Exclusions: Erection of steel flooring, ladders, stairways, and handrails).
Permanent connection Bolts shall be supplied as Free Issued Material to the Erection Contractor. However, Contractor to supply Temporary erection Bolts and shim plates within the quoted Price for erection. Measurement shall be done as per AFC Fabrication drawing Net weight. Weight of Tempoary erection bolts shall not be considered for payment. | 19,600 | MT | - | - |
| 3 | Supply and Fabrication as per TP-1ZZZA-CV-SPE-0021 and as per AFC drawings provided, surface preparation and Painting as per Painting Specification TP-1ZZZA-PI-SPE-0003 Table-11 and installation of Structural Steel including plates etc. for Miscellaneous activities wherever required.
Measurement shall be As per AFC Fabrication Drawings net weight reports. No wastages considered | 400 | MT | - | - |
| 4 | Receipt and Unloading of pre fabricated structure at owner's storage yard /Laydown Area from vendor's truck/trailor. | 19,200 | MT | - | - |
| 5 | HANDRAIL | - | - | - | - |
| 6 | Receipt of Fabricated Materials from OWNER's Store / Storage yard, loading, local transportation up to Contractor's store / erection site, unloading, assembly, Erection of already fabricated and painted Handrails as per requirements indicated in Standard Drawings, IFC Layouts and Fabrication Drawings. Scope shall include all activities like fixing of all type of Connection Bolts (Erection, Hot Dip Galvanized/Non-Galvanized Permanent bolts) as per Specifications, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes, Torque Tightening of Bolts, cleaning, giving final touch up paint as per specifications to the welded / fabricated parts, etc as required complete with all tools and tackles , equipment and labour, for all and heights along with all related works in order that the Structure handrails is handed over to the complete satisfaction of the Engineer-in-charge. Permanent connection Bolts shall be supplied as Free Issued Material to the Erection Contractor. However, Contractor to supply Temporary erection Bolts and shim plates within the quoted Price for erection.
Supply of erection nuts and bolts / fasteners are included in this item.
Measurement shall be As per AFC Fabrication Drawings Net weight. | - | - | - | - |
| 7 | For straight handrail | 250 | MT | - | - |
| 8 | For stair case/inclined handrail | 26 | MT | - | - |
| 9 | For circular handrail | 7 | MT | - | - |
| 10 | For Davit | 12 | MT | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.08 MB
BOQ_805619.xls
BOQ Document • 0.61 MB
127308943.pdf
Tender Document • 0.90 MB
MASTERINDEX.pdf
Tender Document • 0.18 MB
Technical_Civil_VOL_1.pdf
Tender Document • 13.90 MB
Technical_Civil_VOL_2.pdf
Tender Document • 18.35 MB
Technical_Civil_VOL_3.pdf
Tender Document • 24.32 MB
Technical_Civil_VOL_4.pdf
Tender Document • 19.36 MB
Technical_Civil_VOL_5.pdf
Tender Document • 8.87 MB
TP-1ZZZA-PI-GAS-0004_N1.pdf
Tender Document • 8.59 MB
Technical_HSED_PKGA_FF.pdf
Tender Document • 14.67 MB
Technical_HSED_PKGA_SS.pdf
Tender Document • 13.75 MB
Technical_HSED_PKGB_FF_VOL1.pdf
Tender Document • 14.30 MB
Technical_HSED_PKGB_FF_VOL2.pdf
Tender Document • 19.49 MB
Technical_HSED_PKGB_SS_VOL1.pdf
Tender Document • 11.37 MB
Technical_HSED_PKGB_SS_VOL2.pdf
Tender Document • 15.26 MB
Technical_Package_A_Vol_1.pdf
Tender Document • 0.70 MB
Technical_Package_B_Vol_1.pdf
Tender Document • 2.02 MB
Vol1.pdf
Tender Document • 12.54 MB
Vol2.pdf
Tender Document • 30.55 MB
vol3.pdf
Tender Document • 27.35 MB
Vol4.pdf
Tender Document • 3.09 MB
Vol5.pdf
Tender Document • 29.62 MB
Vol6.pdf
Tender Document • 32.76 MB
Vol_A.pdf
Tender Document • 25.96 MB
VOl_B.pdf
Tender Document • 12.46 MB
Vol_SA.pdf
Tender Document • 10.74 MB
Vol_SB.pdf
Tender Document • 6.24 MB
PARTIUNPRICEDCOMMERCIALPKGAB.pdf
Tender Document • 26.87 MB
PARTIIPRICEDSECTIONPKGAB.pdf
Tender Document • 0.81 MB
127308948.html
Tender Document • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .