| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 CrAccepted-AOC | L1 | Accepted-AOC Accept L1 | |
| 2 | L2₹25.8 Cr+₹78.8 L (3.15%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | Rejected-Technical 03 GROUND FLOOR LAXMI APARTMENT NEAR SINDHI COLONY JALGAON | JALGAON | MAHARASHTRA | - | Rejected-Technical Reject |
Tender Value
₹23.8 Cr
EMD Value
₹11.9 L
Closing Date
1 Apr 2025, 6:00 pmClosed
E.E, PW Division, Chh.Sambhajinagar
Padampura, Chh Sambhajinagar
CONSTRUCTION OF SUB DISTRICT HOSPITAL BUILDING IN RURAL HOSPITAL, AJANTA DIST. CHHATRAPATI SAMBHAJINAGAR (UPGRADATION FROM 30 BEDS TO 50 BEDS)
2025_PWR_1164063_1
E Tender Notice No 409 OF 2024-2025
Open Tender
Civil Works
Item Rate
730 days
Chh.Sambhajinagar
As per Tender
2 documents required · 2 mandatory
₹3,540
₹11.9 L
Office of C.E, PW Region, Chh.Sambhajinagar
26 Jun 2025
24 Mar 2025
3 Apr 2025
24 Mar 2025
1 Apr 2025
24 Mar 2025
24 Mar 2025 - 26 Mar 2025
26 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | - | - | - | - |
| 2 | Basement Floor | - | Per Cubic Metre | - | - |
| 3 | Ground Floor | 1 | Per Cubic Metre | - | - |
| 4 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | - | - | - | - |
| 5 | Basement Floor | 1 | Per Cubic Metre | - | - |
| 6 | Ground Floor | 1 | Per Cubic Metre | - | - |
| 7 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5m.) By Mechanical Means | - | - | - | - |
| 8 | Basement Floor | 1 | Per Cubic Metre | - | - |
| 9 | Ground Floor | 1 | Per Cubic Metre | - | - |
| 10 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 m to 3.0 m.) By Mechanical Means | - | - | - | - |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
166628579.xls
BOQ Document • 0.82 MB
166628581.pdf
Tender Document • 0.07 MB
AJINTHAHOSPB2TENDER.pdf
Tender Document • 5.26 MB
166628585.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .