Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹3.2 L+₹2,025 (0.65%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹3.6 L+₹42,825 (13.6%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | L4₹3.6 L+₹48,625 (15.5%)Accepted-Finance | L4 | Accepted-Finance L4 | |
| 5 | L5₹3.7 L+₹59,925 (19.1%)Accepted-Finance | L5 | Accepted-Finance L5 |
Tender Value
Refer Docs
Closing Date
11 May 2020, 4:00 pmClosed
Executive Engineer
Office of Executive Engineer Electric Division II JPDCL GandhiNagar
Rate contract for Creation of 63 KVA three Phase Distribution Transformer Sub Stations on turnkey basis within the jurisdiction of Electric Division II JPDCL
2020_PDD_96207_1
enit21of2020dated27042020
Open Tender
Electrical Works
Turn-key
30 days
with in jurisdiction of ED II
Please refer Tender documents.
8 documents required · 8 mandatory
₹200
Executive Engineer
Office of Executive Engineer
25 Sept 2020
29 Apr 2020
12 May 2020
30 Apr 2020
11 May 2020
30 Apr 2020
30 Apr 2020 - 11 May 2020
6 May 2020
Amount
Supply, Installation & commissioning of 11/0.433 KV, 63 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Aluminium Wound) alongwith LV Cable Box having detachable Alumnium Gland plate including Transportation
Supply, Transportation, Erection of 9 Mtr Long PCC Pole (WL-300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Fabrication & Fixing of MS Channel Iron, Cross arms, Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminium paint coated including all necessary Nut & Bolts & Washers etc.
Supply, Installation, Testing & Commissioning of 11 KV GO AB Switch, 3-phase, 3-pole, 400 Amp/11 KV Link Set (450 x 50 x 6mm)
Supply, Installation, Testing & Commissioning of 11 KV Horn Gap Set
Supply & Fixing of 11 KV LA Set 9 KV, 10 KA with Polymer/Porcelain housing, Stn Type
Providing & Fixing of PVC Cable 120 mm² alongwith 12 Nos Al. Thimble of 120 mm²
Providing & Fixing of LT Distribution Box with100 Amp MCCB for incomer & switch fuse unit for Out Going Ckt.
Providing of Earthing of Sub-Station - Excavation of Earth Pit, Installation of Earth Pipe of 40 mm of nominal bore & length 2.5 Mtr, GI Strip for neutral Earthing of Size 75 mm x 10 mm & 50 mm x 6 mm for connection of Transformer Body, GO Set, LA Set (Complete Job)
Providing of Cement Bottomining (1:2:4)
Providing & Fixing of 11 KV Pin Insulator with Pins (Polymer/Porcelain) 10 KN
Providing & Fixing of 11 KV Disc Insulator with Fittings (Polymer/Porcelain) 45 KN
Providing & Fixing of Anti Climbing device with Clamps
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Stay Set with 50 x 8 mm Stay Clamp, Guy Insulator (2 Nos), Anchoring Plate (200 x 200 x 6 mm), Nut & Bolts, 2 No Turn Buckle, 1.8m long, 16 mm diameter solid Stay Rod & 7/3.15 mm dia stranded wire complete
The Trikuta Engineer
M/S NEW TRIKUTA TECHNOCRATES
M/S APR CONSTRUCTIONS
GCS ASSOCIATES
M/S R. V ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .