Loading…
Loading…
Tender Value
₹82.2 L
EMD Value
₹2.1 L
Closing Date
14 Sept 2026, 1:00 pm
Secretary Nagar Panchyat
Bhotanj
Sub Head C/O Parking, Community Hall, Shops, etc.
2026_UDDHP_142004_1
No.NPB /Tender/V-1(A)-2026-27-186to 91 Dated- 21/08/2026
Open Tender
Civil Works
Item Rate
547 days
NP BHORANJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Secretary Nagar Panchyat Bhoranj
₹2.1 L
26 Aug 2026
26 Aug 2026
15 Sept 2026
26 Aug 2026
14 Sept 2026
26 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting work/Excavation work by mechanical means (hydraulic excavation )/ manual means in foundation trences or drain (not exeeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lifts upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed, within all lead & lift in all kind of soil | 943.89 | P-Cum | - | - |
| 2 | Removal of Excavated material by mechanical means upto 5 km from the site towards M/D site | 0.2 | P-Cum | - | - |
| 3 | Excavation in foundation, trenches etc. in earth work in all kinds of soil including blasting work/chiseling work in dry or saturated conditions up to any depth including stacking the serviceable and unserviceable materials separately and then returning the stacked soil in 15 cm (fifteen centimetres) Layers, when required in to plinths, sides of foundation etcetra and stacking the serviceable materials and disposing of surplus excavated earth.i.e carriage of material in all lead &lift | - | P-Cum | - | - |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.i.e carriage of material in all lead &lift | 1 | P-Cum | - | - |
| 5 | Providing and laying cement concrete 1:3:6 (1) cement:3sand :6 graded crushed stone aggregate 40mm (Forty millimeters) nominal size) mixed mechanically and curing complete.exluding cost for shuttring and centring i.e carriage of material in all lead &lift | - | P-Cum | - | - |
| 6 | Centering and shuttering including strutting, propping removal and etc. of form Suspendedfloors, roofs, landings, balconies and access platform | 1 | P-Sqm | - | - |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) i.e carriage of material in all lead &lift | 1 | P-Cum | - | - |
| 8 | Steel reinforcement forR.C.C.work ready touse "cut and bend" rebars of approved make from i.e carriage of material in all lead &lift | - | P-kg | - | - |
| 9 | Brick work with common burnt day machine moulded perforated bricks of class designation 12.5 conforming to IS:2222 in superstructure above plinth level upto floor five level in cementmortar 1:6 (1cement: 6coarse sand)With F.P.S.(non modular) bricks i.e carriage of material in all lead &lift | 1 | P-Cum | - | - |
| 10 | 15 mm cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall i.e carriage of material in all lead &lift | - | P-Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_210811.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].