Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹20.4 L
EMD Value
₹21,000
Closing Date
26 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA, Sivagangai
O/o The Project Director, DRDA, Sivagangai
AGAMT II 2021-22 Rejuvenation of water bodies works at Devakottai Block in Sivagangai District - Package No. 102
2022_RDTN_247629_1
102_Pack_AGAMT II 21-22/DVK
Open Tender
Civil Works
Item Rate
30 days
SIVAGANGAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹21,000
5 Sept 2022
20 Aug 2022
26 Aug 2022
20 Aug 2022
26 Aug 2022
20 Aug 2022
Amount
DEPENING & DESILTING CONSTRUCTION OF BATHINGGHAT @ PERUNJAIYUR PERIYA OORANI (SFNO:416) IN KURUNTHANAKOTTAI PANCHAYAT
Desilting & Deepening of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
DEEPENING & DESILTING CONSTRUCTION OF BATHINGGHAT @ PUDUKUDI OORANI (SF NO:383) IN KURUNTHANAKOTTAI PANCHAYAT
Desilting & Deepening of Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathig ghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
DEEPENING & DESILTING CONSTRUCTION OF BATHINGGHAT @ THALAIYUR OORANI (SF NO:177/5) IN KANDADEVI PANCHAYAT
Desilting & Deepening of Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
DESILTING & DEEPENING ,CONSTRUCTION OF BATHING GHAT & RETAINING WALL @ VEERAI KALIAMMAN KOVIL OORANI (SF NO:17) IN VEERAI PANCHAYAT
Desilting & Deepening of Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc.
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Construction of Bathigghat
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Construction of Inlet
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Construction of Retaining Wall
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as per SS 20B etc
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation.
Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. SIDE
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.Rajasekaran
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .