Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹80.7 L
Closing Date
24 Feb 2026, 3:00 pmClosed
Rajender Kumar
WTP Nangloi
Operation and Comprehensive Maintenance of 50 MGD Dwarka WTP Phase-I for 05 years, effective from 01.05.2026 to 30.04.2031.
2026_DJB_286233_1
NIT No. 16 (2025-26)/ EE(EM)WTP-Nangloi
Open Tender
Miscellaneous Works
Works
WTP Nangloi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
As per tender documents.
₹80.7 L
CE(WW)II office on 11.02.2026
24 Mar 2026
4 Feb 2026
24 Feb 2026
4 Feb 2026
24 Feb 2026
4 Feb 2026
11 Feb 2026
(A) Providing manpower comprising of plant manager, engineers, skilled, semi-skilled, unskilled, security and MTS, etc. for smooth operations & maintenance of WTP & Allied Works, etc. Plant Manager (Civil/E&M-Graduate Engineer)
Plant Supervisor (Graduate in Chemical Engg.)
Mechanical Engineer (Graduate in Mech. Engg.)
Electrical Engineer (Graduate in Elec. Engg.)
Safety Engineer (Diploma in industrial safety)
Chemist (B.Sc Chemistry or equivalent)
Operators (Diploma in Civil/E&M Engineering)
Electrician (Diploma/ITI qualified)
Store Keeper & Horticulturist (Mali)
Vehicle Driver (For Tractor & JCB operations)
Fitter (Mechanical);(Diploma/ITI qualified)
Beldar/Multi-Tasking Staff (MTS)
Security Guard (Un-armed) for watch & ward across the plant premises
Manpower Cost for 1st year
Manpower Cost for 2nd year @ 3% increment
Manpower Cost for 3rd year @ 3% progressive Increment
Manpower Cost for 4th year @ 3% progressive Increment
Manpower Cost for 5th year @ 3% progressive Increment
(B) Supply of different type of chemicals for the trouble-free operations & water treatment process, etc. 1) Alum
PAC (Solid)
PAC (Liquid)
Chlorine
DWPE for Centrifuge
Total Cost of Chemicals for 01 years
Total Cost of Chemicals for 02 years
Total Cost of Chemicals for 03 years
Total Cost of Chemicals for 04 years
Total Cost of Chemicals for 05 years
(C) Provision of required materials/services, etc for proper O&M of WTP and allied assets exists within the WTP premises. 1) All types of Lubrication such as Grease, Mobi Oil, Tarpin Oil, etc
Consumables such as Gland Dori, Dhoti, Soap, Cleanser, Phenyl, other required materials, etc
Electrical Works such as cable, wire, earthing, lighting, MCB, MCCB, DB, switch sockets, panel, etc
Instrumentation Works such as sensor, communication cable, probes, display units, etc
Mechanical Works such as Bearings of motor and pumps, brush, impeller, other required items, etc
Rewinding of equipments such as fan motors, different types of pumps & motors, other required items, etc
Civil Maintenance such as overall cleaning, housekeeping, painting, repairing of structures or roads, etc
Piping / Valve Spares such as spindles, joints, Nut- bolts, etc
AMC for lift as installed at the site from the authorized/specialized agency
Painting & White washing of civil structures/Admin. Block/filter house, pump house, etc
Total Cost for 01 year:
Total Cost for 02 year:
Total Cost for 03 year:
Total Cost for 04 year:
Total Cost for 05 years:
(D) Other Miscellaneous equipments, gadgets, gears & instruments, etc as may be required for O&M of WTP and related assets within the premises of WTP. 1) Sludge Disposal Cost+ Inspection Vehicle + Safety Emergency Vehicle + Safety Drills i/c Driver and Fuel, etc.
Conference Hall Maintenance Expenditure, Pantry, Cook, Training, Visitors Hospitality, Other Miscellaneous
Stationery/Log books/Xerox/Maps, etc.
Telephone/Mobile/Courier
Safety, PPE, Signages, Caution Boards, etc.
Uniforms for 63 Staff
Laboratory chemicals/glassware/ lab equipment maintenance
Third Party Lab Sample analysis
Tools & Tackles, Vibration analyser
Horticulture Work Expenditure (plant & greeneries, landscaping, etc)
Computer/Printer/Internet, etc
OEM/Inspection Travel Expenditure
Financing Cost
Risk mitigation/Contingency Aspects
Site local minor purchase-expenditure
Energy Audit & Calibration of Instruments
Training/Manual Preparation/Data Handling/ Record Keeping, Preparation of DM-Plan, etc.
Cost w.r.to staff welfare for 63 Nos. Manpower
Total cost for 01 year:
Total cost for 02 year:
Total cost for 03 year:
Total cost for 04 year:
Total cost for 05 years :
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.06 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_378877.xls
BOQ • 0.34 MB
corrigendum240326.pdf
PDF • 0.37 MB
corrigendumdateextension.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .