Loading…
Loading…
Tender Value
₹12.1 L
EMD Value
₹1.2 L
Closing Date
16 Jun 2026, 6:00 pm
Executive Officer
NPP MAU
WARD NO 39 MALIKTAHIRPURA ME AZHAR KE MAKAN SE SHAKEEL KE MAKAN HOTE HUE PARVEZ RULEX, MANZAR CHAMPION KE MAKAN TK V SHAHID KE MAKAN SE MAHBOOB KHAN KE MAKAN HOTE HUE MOLVI ENAM KE MAKAN TK C.C ROAD V NALI NIRMAN KARYA.
2026_DOLBU_1152924_1
71-51
Open Tender
Civil Works
120 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,560
Executive Officer
₹1.2 L
26 May 2026
26 May 2026
17 Jun 2026
26 May 2026
16 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clerance including labour and matrials and including grass cutting and carrage of matrials by Head load | 1 | job | 3,000 | ₹3,000 |
| 2 | Dismantiling of Brick work including St.acking of materials as directed by the Engineer-in-Charge with the dist.ance of
60.00m. Work SI No. 692 | 21.16 | Cum | 435 | ₹9,204.6 |
| 3 | E/W in Excavation in ordenery soil in foudation including labour and matrials and T /P with all com. Work SI No. 251 | 68 | Cum | 115 | ₹7,820 |
| 4 | C.C. Work in 1:6:12 in cement, fine sand and 40 mm Gauge Brick Ballast including labour and matrials , T /P with all com.
Work SI No. 273 | 10.88 | Cum | 3,250 | ₹35,360 |
| 5 | M-150 B/W in 1:4 in cement and coar sand mortar including labour and matrials , T /P with all com. Work SI No.305
(Deduction of old Bricks Rs.26862.00 ) | 24.65 | Cum | 4,980 | ₹1,22,732.1 |
| 6 | 12mm thick Plaster work in 1:3 in cement and fine sand mortar including labour and matrials, T /P with all com. Work SI No.583
(Deduction of old Brick Bats Rs. 10575.00) | 61.05 | Sqm | 189 | ₹11,537.88 |
| 7 | RC.C. Work in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials , T /P with all com. Work SI No.285 | 13.38 | Cum | 9,430 | ₹1,26,173.4 |
| 8 | MS work in RC.C. work including labour and matrials , T /P with all com. Work SI No.504 | 10.5 | Qtl | 5,650 | ₹59,325 |
| 9 | Construction of Granular sub base (GSB) by providing coarse graded . material spreading in uniform layers with . motor grader on prepared surface, m1xmg by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Clause 401. | 35.42 | Cum | 3,492.6 | ₹1,23,707.89 |
| 10 | Layiing C.C Road slab Consisting of 1:2:4 in cement, coarse sand and 20 mm gauge stone grit over prepared subgrade including labour and matrials, T/P with all com. | 53.13 | Cum | 8,050 | ₹4,27,696.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.75 MB
tech71.pdf
Tender Documents • 3.22 MB
BOQ_2159720.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid