Loading…
Loading…
Tender ID
Tender Value
₹12.1 L
EMD Value
₹1.2 L
Closing Date
10 Jul 2026, 1:00 pmClosed
Executive Officer
NPP MAU
WARD NO 39 MALIKTAHIRPURA ME AZHAR KE MAKAN SE SHAKEEL KE MAKAN HOTE HUE PARVEZ RULEX, MANZAR CHAMPION KE MAKAN TK V SHAHID KE MAKAN SE MAHBOOB KHAN KE MAKAN HOTE HUE MOLVI ENAM KE MAKAN TK C.C ROAD V NALI NIRMAN KARYA.
2026_DOLBU_1152924_1
71-51
Open Tender
Civil Works
Percentage
120 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,560
Executive Officer
₹1.2 L
26 May 2026
26 May 2026
10 Jul 2026
26 May 2026
10 Jul 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clerance including labour and matrials and including grass cutting and carrage of matrials by Head load | 1 | job | 3,000 | ₹3,000 |
| 2 | Dismantiling of Brick work including St.acking of materials as directed by the Engineer-in-Charge with the dist.ance of
60.00m. Work SI No. 692 | 21.16 | Cum | 435 | ₹9,204.6 |
| 3 | E/W in Excavation in ordenery soil in foudation including labour and matrials and T /P with all com. Work SI No. 251 | 68 | Cum | 115 | ₹7,820 |
| 4 | C.C. Work in 1:6:12 in cement, fine sand and 40 mm Gauge Brick Ballast including labour and matrials , T /P with all com.
Work SI No. 273 | 10.88 | Cum | 3,250 | ₹35,360 |
| 5 | M-150 B/W in 1:4 in cement and coar sand mortar including labour and matrials , T /P with all com. Work SI No.305
(Deduction of old Bricks Rs.26862.00 ) | 24.65 | Cum | 4,980 | ₹1,22,732.1 |
| 6 | 12mm thick Plaster work in 1:3 in cement and fine sand mortar including labour and matrials, T /P with all com. Work SI No.583
(Deduction of old Brick Bats Rs. 10575.00) | 61.05 | Sqm | 189 | ₹11,537.88 |
| 7 | RC.C. Work in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials , T /P with all com. Work SI No.285 | 13.38 | Cum | 9,430 | ₹1,26,173.4 |
| 8 | MS work in RC.C. work including labour and matrials , T /P with all com. Work SI No.504 | 10.5 | Qtl | 5,650 | ₹59,325 |
| 9 | Construction of Granular sub base (GSB) by providing coarse graded . material spreading in uniform layers with . motor grader on prepared surface, m1xmg by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Clause 401. | 35.42 | Cum | 3,492.6 | ₹1,23,707.89 |
| 10 | Layiing C.C Road slab Consisting of 1:2:4 in cement, coarse sand and 20 mm gauge stone grit over prepared subgrade including labour and matrials, T/P with all com. | 53.13 | Cum | 8,050 | ₹4,27,696.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.75 MB
tech71.pdf
Tender Documents • 3.22 MB
BOQ_2159720.xls
BOQ • 0.23 MB
corridate7102.pdf
PDF • 0.19 MB
corridate71.pdf
PDF • 0.14 MB
corridate.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .