Loading…
Loading…
Tender Value
₹8.4 L
EMD Value
₹84,490
Closing Date
23 Jun 2026, 12:00 pm3d left
Similar tender results from the same govt authority in the past 3 years.
Chief Engineer
NAGAR NIGAM AGRA
Zone-1, Room No. 96, Dhankot Construction work (using CC) for the damaged section of the drain near Kucheshwar Mahadev Temple.
2026_DOLBU_1161601_1
02-06-2026/NAGAR NIGAM AGRA/23-06-2026/290
Open Tender
Construction Works
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Nagar Nigam
₹84,490
18 Jun 2026
18 Jun 2026
23 Jun 2026
18 Jun 2026
23 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)(DSR 2023 SH 15.2.1) | 7.03 | Cum | 1,146.34 | ₹8,058.77 | BI01010001010000000000000515BI0100001112 |
| 2 | Providing of bandha for diversion of nala etc. all complete. (NS) | 500 | Bag | 28.7 | ₹14,350 | BI01010001010000000000000515BI0100001113 |
| 3 | Removal of sludge, kankar, brick bats, organic or inorganic material in faul position or in liquid mud including lead 30m and 3.00 meter lift with specials T&P labour etc. all complete. | 39.38 | Sqm | 239 | ₹9,411.82 | BI01010001010000000000000515BI0100001114 |
| 4 | Providing and fixing of barricading of 100mm average ballies with in a distance of 1.50 meter for 3 rows of 3Q. 3 Nosof cross ballies, two supporting ballies of 3 meter ballies and 2 Nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including labour component (material will be property of contractor after dismantling). | 30 | Rmt | 225 | ₹6,750 | BI01010001010000000000000515BI0100001115 |
| 5 | Earth work in surface exvation not exceeding 30 cm In depth but Exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excevated earth upto 50 m and lift upto 1.5, as directed by Engineer in charge (DSR 2023 SH 2.1.1) | 46.58 | Sqm | 99.87 | ₹4,651.94 | BI01010001010000000000000515BI0100001116 |
| 6 | 1:5:10 (1 cement : 5 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 10 graded stone aggregate 40 mm nominal size including Recycled Aggregate (RA) (DSR 2023 SH 4.1.10A) | 13.33 | Cum | 4,969.78 | ₹66,247.17 | BI01010001010000000000000515BI0100001117 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) (DSR 2023 SH-6.1.2 ) | 6.21 | Cum | 5,437.63 | ₹33,767.68 | BI01010001010000000000000515BI0100001118 |
| 8 | 12 mm cement plaster of mix : 1:4(1 cement: 4 fine sand)(DSR 2023 SH-13.1.1 ) | 175 | Sqm | 264.59 | ₹46,303.25 | BI01010001010000000000000515BI0100001119 |
| 9 | 1:2:4 (1 cement : 2 coarse sand (zone-iii) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). (DSR 2023 S H 4.1.3 ) | 1.29 | Cum | 6,006.57 | ₹7,748.48 | BI01010001010000000000000515BI0100001120 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-iii) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 75.21 | Cum | 8,274.29 | ₹6,22,309.35 | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.36 MB
BOQ_2177388.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid