Tender Value
₹9.5 L
EMD Value
₹19,500
Closing Date
5 Aug 2026, 5:00 pm
E.E. ECD (D) BHIKHARIPUR, B.L.W.,VRANASI.
E.E. ECD (D) BHIKHARIPUR, B.L.W.,VRANASI.
CIVIL RECTIFICATION AND STRENGTHENING WORK OF CONTROL ROOM BUILDING AT 33/11 K.V. S/S HIRANPUR AND CONSTRUCTION OF BOUNDARYWALL AT 33/11 K.V. S/S ARDAUNA, DISTT- MAU.
2026_PVVNV_1169537_1
108/ECDD(V)/2026-27
Open Tender
Civil Works
Percentage
75 days
HEERANPUR, ARDAUNA, DISTT- MAU.
Scan Copy of Prequalification Condition is enclosed in Tender Specification.
2 documents required · 2 mandatory
₹1,180
EXECUTIVE ENGINEER ECD(D) VARANASI
₹19,500
15 Jul 2026
15 Jul 2026
6 Aug 2026
15 Jul 2026
5 Aug 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | |||||
| 2CEMENT PLASTER (IN COARSE SAND) 1:4 (1 cement: 4 coarse sand) | |||||
| 3CEMENT PLASTER (IN COARSE SAND) 1:6 (1 cement: 6 coarse sand) | |||||
| 4CEMENT PLASTER (IN COARSE SAND) 1:3 (1 cement: 3 coarse sand) | |||||
| 5Neat cement punning. | |||||
| 6Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. For the purpose of measurement the entire treated surface will be measured. | |||||
| 7Dismantling flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | |||||
| 8Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate | |||||
| 9 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 391.41 | m² | 18 | ₹7,045.38 |
| 10Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.09 MB
TENDERDOCUMENTSVARANASI.pdf
Tender Documents • 0.96 MB
SPECIFICATIO108.pdf
Additional Documents • 4.76 MB
BOQ_2194664.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid