| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical paper Incomplete |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
20 Nov 2023, 1:00 pmClosed
SUPERINTENDING ENGINEER EDC Mirzapur
SUPERINTENDING ENGINEER EDC Mirzapur
Shifting for 33/11 KV Line under Deposit Scheme EDD-CHUNAR ,Mirzapur
2023_PVVNV_861750_1
71/EDC(M)/23-24
Open Tender
Construction Works
Lump-sum
90 days
SUPERINTENDING ENGINEER EDC Mirzapur
Please refer tender
2 documents required · 2 mandatory
₹1,180
Executive Engineer(A)
₹6,000
22 Nov 2023
10 Nov 2023
21 Nov 2023
10 Nov 2023
20 Nov 2023
10 Nov 2023
Amount
Supply of following Decentralized materials at the works site as per RESSPO norms.
Stone pad 300x300x75 mm (Providing by Contractor)
LT Clamp (Providing by Contractor)
Cross Arm Clamp (Providing by Contractor)
Barbed G.I. wire (Providing by Contractor)
Schacle Insulator (Providing by Contractor)
P.G. clamp for Weasel (Providing by Contractor)
F Bracket (Providing by Contractor)
E Bracket (Providing by Contractor)
Aluminium Lug (Providing by Contractor)
LT Incomming pannel (Providing by Contractor)
G.I. Pipe 6" dia (Providing by Contractor)
G.I. Pipe Jointing Sleave (Providing by Contractor)
11 kv Fuse Set (Providing by Contractor)
Danger board with clamp & bolts (Providing by Contractor)
Cartage of following materials from Electricity Store Center, Mirzapur to dump site near work site including loading/ unloading and proper stocking.
ST pole 11 mtr long ( Provided by department)
ACSR Weasel Conductor ( Provided by department)
Line materials ( Provided by department)
11 KV XLPE Cable 3x185 mm squ. ( Provided by department)
Erection
Erection of single support ST pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Erection of single support ST pole for construction of LT line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing of Poles
Erection of 11 KV Sectional Double Pole Structure of ST pole including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets with materials & other required works.
Sagging of 11 KV 3 Phase 3 Wire HT Line
Sagging of LT Line
Laying of 11 KV XLPE cable size 3x185 mm2 including cost of sand & bricks
Filling of I/D/O/D 11 KV cable jointing kit size 3x185 mm2
Painting of pole
Dismantal of 11 KV line
Dismantal & Mounting of 25 KV T/F
M/s Sharada Electricals
Lal Engineering co
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .