| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-AOC | ₹2.1 L Quoted ₹5.7 L | 1 | Accepted-AOC L-1 |
| 2 | 2₹6.1 LRejected-AOC | ₹6.1 L | 2 | Rejected-AOC L-2 |
| 3 | 3₹6.4 LRejected-AOC | ₹6.4 L | 3 | Rejected-AOC L-3 |
Tender Value
₹6.5 L
EMD Value
₹7,000
Closing Date
4 Jan 2023, 5:00 pmClosed
SE ETC BAREILLY
Superintending Engineer Transmission Campus Near L.I.C. Office Rampur Garden, Bareilly
Installation of additional 02 No. Tower in between Loc. No. 33 to 42 at 132KV Usawan-Tilhar S.C. Transmission Line alongwith other associated works under Electy. Transmission Division, Budaun
2022_UPTCL_756798_1
Short Term E-Tender No. 39/W/ETC(B)/2022-23
Open Tender
Electrical Works
30 days
Budaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE ETC BAREILLY
₹7,000
13 Jun 2023
6 Dec 2022
5 Jan 2023
6 Dec 2022
4 Jan 2023
6 Dec 2022
Amount
Installation of additional 02 No. Tower in between Loc. No. 33 to 42 at 132KV Usawan-Tilhar S.C. Transmission Line alongwith other associated works under Electy. Transmission Division, Budaun, with all Cost of Men, Misc. Consumables, Normal & Special T&Ps, etc. Required for Satisfactory Completion of the Work, with all due Care of Safety & Precautions as per Technical Specifications and Direction of the Supervising Engineer, as per Details below :
Check Survey Including Final Pegmarking
cost of Excavation of 132 KV tower foundation pits including all earth work, back filling, levelling
Setting of Stubs Including all Foundation work but excluding the cost of concerting and excavation (Rate per Location)
(a) 132KV DA
(b) 132 KV DB
Cost of concreting for all type tower foundation including cost of cement,dewatering , shoring and shutering, forming, curing but excluding cost of reinforcement
(a) Concrate Normal mix 1:2:4
Installation of steel reinforcement bars in R.C.C foundation including cost of Steel Reinforcement bars with cutting ,bending placing binding etc
Grounding work Including earth work etc for pipe type grounding including cost of coke & salt
Erection of Super structure towers and their extensions wherever required including all work above ground level excluding hoisting if insulators, Hardware & accessories ,but excluding fitting of danger number ,phase plates ,bird guard and fixing & Punchung for 132 KV Lines
Safety Inspection Fee (Rs. 3000/Per 10Km)
SHRI BALAJI ENGG. WORKS