| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance GRAM GANDA KUNWAR PO AMODHA CHHAVNI DISTRICT BASTI UTTAR PRADESH | BASTI | BASTI | UTTAR PRADESH | 30300 | ₹1.0 Cr | L1 | Accepted-Finance LOWEST |
| 2 | L2₹1.1 Cr+₹2.3 L (2.19%)Rejected-Finance | ₹1.1 Cr+₹2.3 L (2.19%) | L2 | Rejected-Finance HIGH RATE BIDDER |
| 3 | L3₹1.1 Cr+₹6.2 L (5.97%)Rejected-Finance GRAM NAVALGANJ PARADE SARKAR DISTRICT GONDA UTTAR PRADESH | GONDA | GONDA | UTTAR PRADESH | ₹1.1 Cr+₹6.2 L (5.97%) | L3 | Rejected-Finance HIGH RATE BIDDER |
| 4 | L4₹1.2 Cr+₹15.2 L (14.7%)Rejected-Finance | ₹1.2 Cr+₹15.2 L (14.7%) | L4 | Rejected-Finance HIGH RATE BIDDER |
| 5 | L5₹1.3 Cr+₹24.4 L (23.5%)Rejected-Finance 208 L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | ₹1.3 Cr+₹24.4 L (23.5%) | L5 | Rejected-Finance HIGH RATE BIDDER |
| Sl No | Description | Qty | Unit | M/S RADHIKA CONSTRUCTION COMPANY L2 | BHOLENDRA PRATAP SINGH L4 | M/S CHANDA CONSTRUCTION L3 | M/S S K CONSTRUCTION COMPANY L5 | M/S GANESH DUTT SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation for making drain diversion in all type of soil including all lead & lift, dressing & manual compaction etc required for proper completion of work. | 5,109.34 | M3 | 50 ₹2,55,467 | 70 ₹3,57,653.8 | 22 ₹1,12,405.48 Lowest | 80 ₹4,08,747.2 | 74.46 ₹3,80,441.46 |
| 2.00 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 3,311.33 | M3 | 50 ₹1,65,566.5 | 80 ₹2,64,906.4 | 45 ₹1,49,009.85 Lowest | 80 ₹2,64,906.4 | 51 ₹1,68,877.83 |
| 3.00 | Laying P.C.C 1:3:6 with cement, Hamirpur coarse sand and 20 to 40 mm Kabrai stone ballast with mixing, laying, ramming, curing etc including all cost of material, labour, T&P etc required for proper completion of work. | 193.11 | M3 | 9,500 ₹18,34,545 | 8,717.6 ₹16,83,455.74 | 9,500 ₹18,34,545 | 10,300 ₹19,89,033 | 7,100 ₹13,71,081 Lowest |
| 4.00 | Laying C.C 1:2:4 with cement, Hamirpur coarse sand and 10 to 20 mm Kabrai stone grit with mechanical mixing, laying, vibration, curing etc including all cost of material, labour, T&P etc. required for proper completion of work. | 130.7 | M3 | 9,500 ₹12,41,650 | 9,137.9 ₹11,94,323.53 | 10,000 ₹13,07,000 | 11,000 ₹14,37,700 | 8,800 ₹11,50,160 Lowest |
| 5.00 | Supplying & laying R.C.C hume pipe (NP3) 1000 mm dia with collar including sealing/jointing with suitable material, cartage charge and including all cost of material with suitable material, labour, T&P etc. required for proper completion of work. | 80 | RM | 9,500 ₹7,60,000 | 2,658 ₹2,12,640 Lowest | 7,000 ₹5,60,000 | 8,500 ₹6,80,000 | 7,500 ₹6,00,000 |
| 6.00 | First class 150 Brick work in 1:4 C.M with cement & coarse sand including all cost of material, labour, T&P. etc required for proper completion of work. | 700.06 | M3 | 6,260 ₹43,82,375.6 | 6,251.2 ₹43,76,215.07 | 6,500 ₹45,50,390 | 7,000 ₹49,00,420 | 6,000 ₹42,00,360 Lowest |
| 7.00 | Centering & shuttering for C.C work with cost of shuttering, including cost of all material, labour, T&P. etc required for proper completion of work. | 479.99 | M2 | 280 ₹1,34,397.2 Lowest | 400 ₹1,91,996 | 300 ₹1,43,997 | 300 ₹1,43,997 | 730 ₹3,50,392.7 |
| 8.00 | Supplying & laying Mirzapur cut stone boulder 25 kg to 60 kg of size approx. 20cmx20cmx15cm manually placed & closely packed in pitching including cost of all material, labour, T&P. etc required for proper completion of work. | 64.94 | M3 | 5,000 ₹3,24,700 | 5,619 ₹3,64,897.86 | 5,500 ₹3,57,170 | 5,300 ₹3,44,182 | 3,025 ₹1,96,443.5 Lowest |
| 9.00 | Earth work in making canal section, bank, ramp in all type of soil including all lead & lift, levelling, dressing to profile and manual compaction etc required for proper completion of work. | 5,040.8 | M3 | 14 ₹70,571.2 Lowest | 75 ₹3,78,060 | 70 ₹3,52,856 | 80 ₹4,03,264 | 50 ₹2,52,040 |
| 10.00 | Supplying & laying graded filter material including cost of all material, labour, T&P etc required for proper completion of work.
(a) Coarse sand, FM not less than 2.00 | 13.2 | M3 | 2,300 ₹30,360 Lowest | 5,884.02 ₹77,669.06 | 2,500 ₹33,000 | 5,500 ₹72,600 | 4,137 ₹54,608.4 |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
3 Aug 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
IX CIRCLE IRRIGATION WORKS BAHRAICH
Construction of Drainage Crossing work at km 2.400 of Kanhara Minor in District Balrampur.
2026_UPIDC_1167986_11
01/SE-IX/2026-27
Open Tender
Civil Works
Item Rate
180 days
BALRAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,651
₹2.8 L
IX CIRCLE IRRIGATION WORKS BAHRAICH
11 Sept 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation for making drain diversion in all type of soil including all lead & lift, dressing & manual compaction etc required for proper completion of work. | 5,109.34 | M3 | 84 | ₹4,29,184.56 |
| 0.0 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 3,311.33 | M3 | 90 | ₹2,98,019.7 |
| 0.0 | Laying P.C.C 1:3:6 with cement, Hamirpur coarse sand and 20 to 40 mm Kabrai stone ballast with mixing, laying, ramming, curing etc including all cost of material, labour, T&P etc required for proper completion of work. | 193.11 | M3 | 10,897 | ₹21,04,319.67 |
| 0.0 | Laying C.C 1:2:4 with cement, Hamirpur coarse sand and 10 to 20 mm Kabrai stone grit with mechanical mixing, laying, vibration, curing etc including all cost of material, labour, T&P etc. required for proper completion of work. | 130.7 | M3 | 11,417.38 | ₹14,92,251.57 |
| 0.0 | Supplying & laying R.C.C hume pipe (NP3) 1000 mm dia with collar including sealing/jointing with suitable material, cartage charge and including all cost of material with suitable material, labour, T&P etc. required for proper completion of work. | 80 | RM | 8,860 | ₹7,08,800 |
| 0.0 | First class 150 Brick work in 1:4 C.M with cement & coarse sand including all cost of material, labour, T&P. etc required for proper completion of work. | 700.06 | M3 | 7,354.47 | ₹51,48,570.27 |
| 0.0 | Centering & shuttering for C.C work with cost of shuttering, including cost of all material, labour, T&P. etc required for proper completion of work. | 479.99 | M2 | 400 | ₹1,91,996 |
| 0.0 | Supplying & laying Mirzapur cut stone boulder 25 kg to 60 kg of size approx. 20cmx20cmx15cm manually placed & closely packed in pitching including cost of all material, labour, T&P. etc required for proper completion of work. | 64.94 | M3 | 5,619.08 | ₹3,64,903.06 |
| 0.0 | Earth work in making canal section, bank, ramp in all type of soil including all lead & lift, levelling, dressing to profile and manual compaction etc required for proper completion of work. | 5,040.8 | M3 | 75 | ₹3,78,060 |
| 0.0 | Supplying & laying graded filter material including cost of all material, labour, T&P etc required for proper completion of work.
(a) Coarse sand, FM not less than 2.00 | 13.2 | M3 | 5,884.02 | ₹77,669.06 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
LOT11.pdf
Tender Documents • 5.23 MB
BOQ_2190647.xls
BOQ • 0.28 MB
BOQ_2190647.xls
PDF • 0.32 MB
DATE.pdf
PDF • 0.26 MB
BOQ11.xls
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .