Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹16,717
Closing Date
24 Jun 2026, 6:00 pm3d left
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Civil
The Executive Engineer Civil BSNL Civil Division Jamshedpur Phone no 0651 2245155
Special repair and maintenance to the old ETR building at New TE compound Godda under Dumka OA BA Dhanbad
2026_BSNL_281241_1
08/NIT/EE(C)/CDJ/26-27
Open Tender
Civil Works
60 days
Godda
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Yes
Accounts Officer Cash BSNL Olo GMTD Ranchi
₹16,717
Yes
18 Jun 2026
18 Jun 2026
27 Jun 2026
18 Jun 2026
24 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. | 500 | Sqm | - | - |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.01 | 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.5 | Cum | - | - |
| 3Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : | |||||
| 3.01 | 1:1½:3 (1 cement : 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 0.5 | Cum | - | - |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.5 | Cum | - | - |
| 5Centering and shuttering including strutting, propping etc. and removal of form work for : | |||||
| 5.01 | Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like | 2 | Sqm | - | - |
| 5.02 | Weather shade, Chajjas, corbels etc., including edges | 5 | Sqm | - | - |
| 6Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
Tendernotice_2.pdf
PDF • 3.19 MB
BOQ_328231.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid