| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-Finance | ₹2.1 L | 1 | Accepted-Finance O.K. |
| 2 | 2₹2.2 LAccepted-Finance | ₹2.2 L | 2 | Accepted-Finance O.K. |
| 3 | 3₹2.5 LAccepted-Finance | ₹2.5 L | 3 | Accepted-Finance O.K. |
| 4 | 4₹3.8 LAccepted-Finance | ₹3.8 L | 4 | Accepted-Finance O.K. |
Tender Value
₹3.6 L
EMD Value
₹4,000
Closing Date
11 Mar 2021, 5:00 pmClosed
S.E., E.T.C., Bareilly
Superintending Engineer Transmission Campus Near L.I.C. Office Rampur Garden, Bareilly
Installation amd Commissioning of 40MVA 132/33KV Transformer alongwith other associated Works at 132KV Sub Station Sahaswan, Budaun under E.T.D., Budaun
2021_UPTCL_563599_1
Short Term E-Tender No. 76/W/ETC(B)/2020-21
Open Tender
Electrical Works
30 days
Budaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
A/c No 10897666087 IFSC SBIN0000615 S.B.I. Bly
₹4,000
25 Mar 2021
4 Mar 2021
12 Mar 2021
4 Mar 2021
11 Mar 2021
4 Mar 2021
Amount
Installation & Commissioning of 40MVA 132/33KV Transformer (ECE make) along with other associated Works at 132KV Sub Station Sahaswan, Budaun, with all Cost of Men, Materials, Misc. Consumables, Trailer / Trucks, Crane / Hydra, T&Ps etc. Required for Satisfactory Completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per Details below :
Shifting of Main Tank of the above 40MVA Transformer to its Plinth from Storage Place upto 20 Meter Distance including Turning of the Tank, as Required.
Additional Shifting of Tank of the above Transformer upto 55 Meter Distance. (1 Job for every 5 Meter or Part thereof)
Shifting of Complete Accessories of the above 40MVA Transformer including Oil in Drums and Bushings Packed in Wooden Cases / Crates from Unloading Place at the Sub Station to Erection Site in Switchyard. (Approx. 75 Meter Distance)
Complete Erection of the above 40MVA Transformer including its Radiators, Conservator Tank, Turrets, HV / LV / Neutral Bushings, Connecting Pipe Lines, Cooling Fans, OLTC Drive Mechanism Box, Marshalling Box etc. along with all other associated Works.
Erection of RTCC Panel of the 40MVA Transformer after Shifting of RTCC Panel from Unloading Place to Control Room, then Earthing of the RTCC Panel.
Centrifuging of Transformer Oil in Oil Storage Tank after Filling of Oil in Oil Storage Tank from Oil Drums, Un-interrupted till the Desired BDV Value of the Oil is Achieved and then, Filling & Topping up of the Centrifuged T/F Oil in above 40MVA Transformer as per Standard Procedure to Maintain Required Oil Level in the Transformer. Centrifuging Machine, its Operator and all associated T&Ps shall be Arranged by the Contractor at his own Cost.
Shifting of 20KL Capacity Oil Storage Tank on suitable vehicle from storage place at Substation, Bareilly to site of 132KV Substation Sahaswan distance (Approx 150 Km) Loading and Un-Loading with the help of Suitable Capacity Crane, with all due Care of Safety & Precautions during Loading, Carriage and Un-Loading etc.
Centrifuging & Circulation of Transformer Oil in above 40MVA Transformer, Un-interrupted till the Desired BDV Value of the Oil & IR Values of Bushings are Achieved including Hourly Recording all the Parameters such as Temp., Vacuum, Insulation Resistance etc. Centrifuging Machine, its Operator and all associated T&Ps shall be Arranged by the Contractor at his own Cost.
Termination of Control Cables of 40MVA Transformer, its RTCC Panel and C&R Panel including Termination of additionally Laid new Control Cables with above 40MVA Transformer, its RTCC Panel and C&R Panel at both ends along with Glanding, Ferruling etc. as per new Cable Schedule.
Earthing of Main Tank, Marshalling Box, OLTC Drive Mechanism Box, Transformer Neutral etc. of the above 40MVA Transformer with the help of 75×10 mm / 50×6 mm size M.S. Flats, its Jointing with already Laid Earth Mat / Deltas at 2 Places with Necessary Modifications in Existing Support Structure for Earthing of the Neutral Bushing and then Painting of the Earthing Strips.
Jumpering of the above 40MVA Transformer as per Details below :
Jumpering with Single ACSR Panther Conductor and associated Terminal Connectors, P.G. Clamps etc. between HV side Bushings to 132KV Jack Bus Bar Conductors including all associated Equipments in between.
Jumpering with Twin ACSR Moose Conductor and associated Terminal Connectors, P.G. Clamps etc. between LV side Bushings to 33KV C.B. including all associated Equipments in between.
Shifting of 20KL Capacity Oil Storage Tank on suitable vehicle from storage place at 132KV Substation Sahaswan to Substation, Bareilly distance (Approx 150 Km) Loading and Un-Loading with the help of Suitable Capacity Crane, with all due Care of Safety & Precautions during Loading, Carriage and Un-Loading etc
M/s S.S. Refregeration
SHIVAM ENGINEERS
Technocrat Electrical
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf