| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | JV Engineers L1 | Vicky Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in all type of soil | 8.06 | m3 | 131.8 ₹1,062.31 Lowest | 135 ₹1,088.1 |
| 2.00 | M.Sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications | 17.41 | m3 | 2,165.6 ₹37,703.1 Lowest | 2,165.6 ₹37,703.1 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 17.41 | m3 | 6,030.6 ₹1,04,992.75 Lowest | 6,030.6 ₹1,04,992.75 Lowest |
| 4.00 | Centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete. | 60.41 | m2 | 547.5 ₹33,074.48 Lowest | 555 ₹33,527.55 |
| 5.00 | Cement concrete 1:3:6mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 6.18 | m3 | 6,817.4 ₹42,131.53 Lowest | 6,819 ₹42,141.42 |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 12.59 | m3 | 7,428.8 ₹93,528.59 Lowest | 7,428.8 ₹93,528.59 Lowest |
| 7.00 | Provision for Tar pad including all cost and conveyance etc,complete | 9 | No | 100 ₹900 Lowest | 150 ₹1,350 |
| 8.00 | Provision for Name Board including all cost and conveyance etc,complete | 1 | No | 3,500 ₹3,500 Lowest | 4,500 ₹4,500 |
| 9.00 | Cost for Photographic charges etc., | 1 | No | 500 ₹500 Lowest | 750 ₹750 |
Tender Value
₹3.8 L
EMD Value
₹3,800
Closing Date
29 Aug 2025, 4:00 pmClosed
BDO
Melbhuvanagiri panchayat union
Providing Cement Concerete Pavement In Mela Street AT B.Kolakudi Panchayat
2025_RDTN_595225_6
A5/725/2025 AGAMT RETENDER
Open Tender
Civil Works
Item Wise
90 days
Melbhuvanagiri panchayat union
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,800
15 Dec 2025
20 Aug 2025
29 Aug 2025
20 Aug 2025
29 Aug 2025
20 Aug 2025
Amount
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in all type of soil
M.Sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Tar pad including all cost and conveyance etc,complete
Provision for Name Board including all cost and conveyance etc,complete
Cost for Photographic charges etc.,
Vicky Construction (BID ID -1437307)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_711495.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .