| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC L1 bidder with all documents ok |
| 2 | L2₹1.1 Cr+₹9.1 L (9.10%)Rejected-Finance AT NEAR POLICE OUTPOST GANDAGHORA GANDHICHOWK JHARSUGUDA ODISHA 768216 | JHARSUGUDA | ODISHA | 768216 | ₹1.1 Cr+₹9.1 L (9.10%) | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹1.2 Cr+₹15.7 L (15.7%)Rejected-Finance | ₹1.2 Cr+₹15.7 L (15.7%) | L3 | Rejected-Finance L3 bidder |
| 4 | L4₹1.4 Cr+₹43.2 L (43.0%)Rejected-Finance | ₹1.4 Cr+₹43.2 L (43.0%) | L4 | Rejected-Finance L4 bidder |
Tender Value
₹1.4 Cr
EMD Value
₹1.7 L
Closing Date
3 May 2026, 6:00 pmClosed
STAFF OFFICER CIVIL,ORIENT AREA
OFFICE OF THE GENERAL MANAGER,ORIENT AREA
Construction of Multipurpose Hall at Orient Area
2026_MCL_358465_1
MCL/GM/OA/SO(C)/e-T/26-27/04 dtd.17.04.2026
Open Tender
Civil Works - Buildings
Percentage
270 days
OFFICE OF THE GENERAL MANAGER, ORIENT AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.7 L
30 Jul 2026
17 Apr 2026
4 May 2026
18 Apr 2026
3 May 2026
18 Apr 2026
18 Apr 2026 - 28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | - | cum | - | - |
| - | Supplying and filling in plinth with sand under floors, including watering,ramming,consolidating and dressing complete. | - | cum | - | - |
| - | Providing and laying in position cement concrete of level: specified grade excluding the cost of centering and shuttering - All work up to plinth 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement -All work up to plinth level :1:1.5:3(1 cement: 1.5 coarse sand(zone-III)derived from natural sources: 3graded stone aggregate 20mm nominal size derived from natural sources) | - | cum | - | - |
| - | Reinforced cement concrete work in walls (any thickness), including attached pilasters , buttresses,plinth and string courses , fillets , columns , pillars , piers , abutments , pots and struts etc.above plinth level upto floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1cement:1.5 coarse sand(zone-III)derived from natu-ral sources: 3 graded stone aggregate 20mm nominal size derived from natural sources) | - | cum | - | - |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings , balconies, shelves , chajjas , lintels, bands, plain window sills, stair cases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with1:1.5:3 (1cement:1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | mtr | - | - |
| - | Providing, hoisting and fixing above plinth level upto floor five level precast reinforced cement concrete work in string courses, bands, copings, bedplates, anchorblocks, plain windowsills and the like, including the cost of required centering, shuttering but, excluding cost of reinforcement with 1:1.5:3 (1cement :1.5coarse sand(zone-III)derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | - | sqm | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.57 MB
Tendernotice_2.pdf
PDF • 2.36 MB
BOQ_371341.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .