| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC BARNALI TOWER MIRZA KAMRUP ASSAM PIN 781125 | KAMRUP | ASSAM | 781125 | ₹1.2 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.3 Cr+₹6.1 L (5.00%)Rejected-AOC JAYANAGAR GUWAHATI PO BELTOLA DIST KAMRUP METRO PIN 781028 | KAMRUP METRO | ASSAM | 781028 | ₹1.3 Cr+₹6.1 L (5.00%) | L2 | Rejected-AOC L2 Bidder |
| Sl No | Description | Qty | Unit | SAILAJA COMMERCIAL CONSTRUCTION PVT LTD L2 | ANIL DAS CONSTRUCTION PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00STORE ROOM WORKS | |||||
| 1.01 | EARTH WORK :
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil | 60.98 | Cum | 323.46 ₹19,725.88 | 308.06 ₹18,786.73 Lowest |
| 2.00 | EARTH WORK :
Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete. | 49.95 | Cum | 2,437.03 ₹1,21,729.65 | 2,320.98 ₹1,15,932.95 Lowest |
| 3.00 | PCC WORK
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 7.3 | Cum | 7,705.54 ₹56,250.44 | 7,338.61 ₹53,571.85 Lowest |
| 4.00 | RCC WORK
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All works upto plinth level
Concrete of M25 grade with minimum cementcontent of 330 kg /cum | 12.74 | Cum | 9,792.11 ₹1,24,761.27 | 9,325.82 ₹1,18,820.27 Lowest |
| 5.00 | RCC WORK
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All works above plinth level upto floor V level
Concrete of M25 grade with minimum cement
content of 330 kg /cum | 6.82 | Cum | 11,621.58 ₹79,247.55 | 11,068.17 ₹75,473.85 Lowest |
| 6.00 | SHUTTERING AND FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 19.2 | Sqm | 347.26 ₹6,667.39 | 330.72 ₹6,349.82 Lowest |
| 7.00 | SHUTTERING AND FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams,girders, bressumers and cantilevers. | 87.5 | Sqm | 686 ₹60,025 | 653.33 ₹57,166.38 Lowest |
| 8.00 | SHUTTERING AND FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 34.56 | Sqm | 906.9 ₹31,342.46 | 863.71 ₹29,849.82 Lowest |
| 9.00 | BRICK WORK
Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. | 110 | Sqm | 826.9 ₹90,959 | 787.52 ₹86,627.2 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
2 Mar 2026, 12:00 pmClosed
SE,KRC
O/o Superintending Engineer PWD (Roads),Kamrup Road Circle, Guwahati-01
Imp ofAlternateRoad toMaaKamakhyaTemple byProvidingRCCBridge toEliminate HairPin Bend,Rock Fall Protection andImprovement of Junction at EntryPoint under SOPD-Gfor theYear2023.24.(Const ofBoundaryWall,Parking Area,Store RoomAndOtherAllied Works)
2026_PWD_51205_2
No.GRC/NIT/ 510./2021 -22/Pt.I/ 258 Dtd.12.02.2026
Open Tender
Civil Works
Item Rate
180 days
Bhutnath, Santipur
Please refer tender
4 documents required · 4 mandatory
₹3,645
Yes
₹2.4 L
Yes
SE,Kamrup Road Circle
12 Jun 2026
17 Feb 2026
2 Mar 2026
17 Feb 2026
2 Mar 2026
17 Feb 2026
17 Feb 2026 - 2 Mar 2026
21 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1STORE ROOM WORKS | |||||
| 1.01 | EARTH WORK :
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil | - | Cum | 308.06 | - |
| 2 | EARTH WORK :
Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete. | 49.95 | Cum | 2,320.98 | ₹1,15,932.95 |
| 3 | PCC WORK
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 7.3 | Cum | 7,338.61 | ₹53,571.85 |
| 4 | RCC WORK
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All works upto plinth level
Concrete of M25 grade with minimum cementcontent of 330 kg /cum | 1 | Cum | 9,325.82 | ₹9,316.49 |
| 5 | RCC WORK
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All works above plinth level upto floor V level
Concrete of M25 grade with minimum cement
content of 330 kg /cum | 1 | Cum | 11,068.17 | ₹11,057.1 |
| 6 | SHUTTERING AND FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 19.2 | Sqm | 330.72 | ₹6,349.82 |
| 7 | SHUTTERING AND FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams,girders, bressumers and cantilevers. | 87.5 | Sqm | 653.33 | ₹57,166.38 |
| 8 | SHUTTERING AND FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 34.56 | Sqm | 863.71 | ₹29,849.82 |
| 9 | BRICK WORK
Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. | 110 | Sqm | 787.52 | ₹86,627.2 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
FOB_SOPD_2025_26Pkg02.pdf
Tender Documents • 0.10 MB
BOQ_81449.xls
BOQ • 0.42 MB
SBDSOPD202526pkg02.pdf
Tender Documents • 1.26 MB
corrigendum.pdf
PDF • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .