| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 CrAdmitted-Finance | ₹5.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.8 Cr+₹10.8 L (1.89%)Admitted-Finance 0 | ₹5.8 Cr+₹10.8 L (1.89%) | L2 | Admitted-Finance |
| 3 | L3₹6.4 Cr+₹67.3 L (11.8%)Admitted-Finance | ₹6.4 Cr+₹67.3 L (11.8%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Clayson Infratech private limited L3 | M/S G.M. CONSTRUCTION L1 | M/S RAJ CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out in all Kinds of soil. | 10,260.42 | Cum | 175.29 ₹17,98,549.02 | 163.95 ₹16,82,195.86 | 114 ₹11,69,687.88 Lowest |
| 2.00 | Providing and laying M-7.5 Cement concrete 1:4:8 (1Cement :4 fine sand : 8 graded Stone aggreagate 40 mm nominal size) excluding the cost of centering and shuttering and curing complete. All work up to plinth level. | 1,228.89 | Cum | 6,774.79 ₹83,25,471.68 | 5,960.98 ₹73,25,388.71 | 5,100 ₹62,67,339 Lowest |
| 3.00 | Providing and laying cement concrete ( Grade M-20) 1:1.5:3 ( 1 Cement, 1.5 Coarse Sand , 3 graded stone aggregate 20mm nominal size ) In retaining walls, return walls, walls (anythickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing. | 2,172.84 | Cum | 9,388.58 ₹2,03,99,882.17 | 8,381.64 ₹1,82,11,962.66 Lowest | 9,200 ₹1,99,90,128 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 20,535.9 | Sqm | 367.57 ₹75,48,380.76 | 335.46 ₹68,88,973.01 Lowest | 438.5 ₹90,04,992.15 |
| 5.00 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in over all rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured. | 2,558.44 | Qtl | 10,032.13 ₹2,56,66,602.68 | 8,956.17 ₹2,29,13,823.57 | 8,500 ₹2,17,46,740 Lowest |
| 6.00 | Providing and fixing unplasticised Rigid PVC rain water pipes 100 mm diameter conforming to IS: 13592 Type A | 52.71 | RM | 2,346.85 ₹1,23,702.46 | 2,095.15 ₹1,10,435.36 | 593.36 ₹31,276.01 Lowest |
Tender Value
₹6.7 Cr
EMD Value
₹13.5 L
Closing Date
10 Jul 2023, 5:00 pmClosed
PGM(E)
A-1/4,Lakhanpur, Kanpur-208024
Re-Construction of R.C.C Drain at I.A Utelwa Distt. Amethi
2023_SIDC_817190_1
cd_7_77_28042023
Open Tender
Civil Works
Item Rate
240 days
Utelwa
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,850
UPSIDA
₹13.5 L
Yes
11 Aug 2023
3 Jul 2023
11 Jul 2023
3 Jul 2023
10 Jul 2023
3 Jul 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out in all Kinds of soil.
Providing and laying M-7.5 Cement concrete 1:4:8 (1Cement :4 fine sand : 8 graded Stone aggreagate 40 mm nominal size) excluding the cost of centering and shuttering and curing complete. All work up to plinth level.
Providing and laying cement concrete ( Grade M-20) 1:1.5:3 ( 1 Cement, 1.5 Coarse Sand , 3 graded stone aggregate 20mm nominal size ) In retaining walls, return walls, walls (anythickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing.
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in over all rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured.
Providing and fixing unplasticised Rigid PVC rain water pipes 100 mm diameter conforming to IS: 13592 Type A
M/S RAJ CONSTRUCTION
Clayson Infratech private limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
feeformatn.xls
Tender Documents • 0.02 MB
etenderdocument.pdf
Tender Documents • 1.48 MB
BOQ_1369788.xls
BOQ • 0.31 MB
capabilitystatement.pdf
Tender Documents • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .