Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹6.4 L
EMD Value
₹64,100
Closing Date
7 Nov 2026, 1:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Officer
NPP MAU
WARD NO 39 MALIKTAHIRPURA ME TARIK NATIONAL SE ADIL CHAPPAL KE MAKAN V VASI AHMAD KE MAKAN SE KHAIRULBASHAR KE MAKAN TK NALI, PATIYA V INTERLOCKING KA NIRMAN KARYA.
2026_DOLBU_1194580_1
80-210
Open Tender
Civil Works
Percentage
120 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,040
Executive Officer
₹64,100
10 Oct 2026
10 Oct 2026
7 Nov 2026
10 Oct 2026
7 Nov 2026
10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clerance including labour and matrials and including grass cutting /Dressing and carrage of matrials by Head load | 1 | job | 5,000 | ₹5,000 |
| 2 | Dismenteling of Brick Work including Stacking of materials as directed by the Engineer-in-Charge with the distance of
60.00m. Work SI No. 692 | 14.86 | Cum | 435 | ₹6,464.1 |
| 3 | E/W in Excavation in ordenery soil in foudation including labour and matrials and T/P with all com. Work SI No. 251 | 39.6 | Cum | 115 | ₹4,554 |
| 4 | C.C. Work in 1:6:12 in cement, fine sand and 40 mm Gauge Brick Ballast including labour and matrials , T/P with all com.
Work SI No. 273
(Deduction Of old Brick Bats Rs. 5575.00) | 5.48 | Cum | 3,250 | ₹17,825 |
| 5 | M-150 B/W in 1:4 in cement and coar sand mortar including labour and matrials , T/P with all com. Work SI No.305
(Deduction Of old Brick Rs. 14152.00) | 25.65 | Cum | 4,980 | ₹1,27,727.99 |
| 6 | 12mm thick Plaster work in 1:3 in cement and fine sand mortar including labour and matrials, T/P with all com. Work SI o.583 | 81 | Sqm | 189 | ₹15,309 |
| 7 | R.C.C. Work in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials, T/P with all com. Work SI
No.285 | 4.41 | Cum | 9,430 | ₹41,586.3 |
| 8 | M.S Baar In Such as R.c.C work inlcuding etc all complete. | 3.46 | Qtl | 5,650 | ₹19,549 |
| 9 | Construction of Granular sub base (GSB) by providing coarse graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Clause 401 .. | 11.34 | Cum | 3,492.6 | ₹39,606.08 |
| 10 | P /L of 80 mm thick rubber moulded nterlocking cement concrete Paver blocks,Work SI No. 786(I) | 141.75 | Sqm | 835 | ₹1,18,361.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.34 MB
Tech80.pdf
Tender Documents • 7.63 MB
BOQ_2255285.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .