Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.4 LAdmitted-Finance | +14.50% | ₹14.4 L | L1 | Admitted-Finance |
| 2 | L2₹14.6 LAdmitted-Finance | +16.00% | ₹14.6 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical EMD not deposit |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical EMD not deposit |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
15 May 2026, 11:15 amClosed
Executive Engineer (EnM) M-8
Office of the Executive Engineer (EnM) M-8 Nangloi Phase-III, Near Maharaja Surajmal Stadium Metro Station New Delhi-110041.
Operation, watch AND ward of various BPS of Vikaspuri Constituency, AC-31.
2026_DJB_290988_1
NIT No.01 /EE(EnM)M-8/2026-27 Item 12
Open Tender
Civil Works
210 days
Nangloi
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No SB 50448339804
₹33,000
Yes
19 May 2026
7 May 2026
15 May 2026
7 May 2026
15 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Operation, watch and ward of all (E&M) equipment installed in various Clear Water Booster Pumping Stations (BPSs), which includes Motor pump-sets, electric control panels, valves, and other auxiliary components with different capacities. To ensure continuous and efficient operations during designated supply hours, two suitably experienced workers are to be deployed at each BPS on break-duty shifts. These workers shall be responsible not only for operating the systems but also for routine monitoring and minor upkeep of the installed infrastructure. The assigned tasks under this job include the following: Supervision and routine operation of Motor, pump-sets and electrical & Mechanical systems and Minor electrical works. a) Minor maintenance and replacements of asbestos graphite packing in Pump/valve, Kit-Kats, tube lights/bulbs, switches, sockets, and fuse links including servicing and adjustment of valve as needed. b) Periodic tightening of connections in control panel boards, cleaning carbon deposits from panel/motor terminal connection plates, Correction of phase sequence, if found incorrect during operation and attending to any exposed wiring or components. c) Maintaining operational log books and recording all daily activities and abnormalities. d) Cleaning and general housekeeping of the pump house area to maintain a safe and hygienic working environment. This work is to be carried out at the following booster pumping station sites: 1. LSC, E-Block, Vikaspuri BPS. 2. GHS (Panchvati) BPS. 3. DG-II (New) Block, Vikaspuri BPS. 4. DG-III Block, 468/416 MIG, Vikaspuri BPS. Note: Spares / Material required for replacement in minor-maintenance will be provided by the department. Total no. of staff deployed: 08 Nos. (Un-Skilled worker: 1 Nos and Semi-skilled worker: 1 at each site) Period: 210 Days | - | days | 5,976 | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_386112.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid