Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹4.8 L (3.54%)Admitted-Finance | ₹1.4 Cr+₹4.8 L (3.54%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹7.5 L (5.61%)Admitted-Finance | ₹1.4 Cr+₹7.5 L (5.61%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹16.2 L (12.0%)Admitted-Finance PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | ₹1.5 Cr+₹16.2 L (12.0%) | L4 | Admitted-Finance |
| 5 | L5₹1.7 Cr+₹36.7 L (27.3%)Admitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | ₹1.7 Cr+₹36.7 L (27.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JAI ENGINEERING L1 | A.H.CONSTRUCTIONS L2 | Dillibabu L3 | K S CONSTRUCTION L4 | JD ENTERPRISES L5 | ULTRAPOWER BUILDERS L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete. | 1,105 | cum | - | - | - | - | - | - |
| 2.00 | Plain cement concrete 1:3:6, using 20 mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | 165 | cum | - | - | - | - | - | - |
| 3.00 | RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, for columns including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. For column concrete.) without form work | 240 | cum | - | - | - | - | - | - |
| 4.00 | RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, for columns including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. For column concrete.) with form work | 98 | cum | - | - | - | - | - | - |
| 5.00 | RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, for columns including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. For Grade Beam / Plinth Beam concrete.) | 67 | cum | - | - | - | - | - | - |
| 6.00 | Supplying and fixing of 65x65x6mm GI angle for cable duct including cost of all materials, labour, lead, lift, etc., complete and as directed by the Department Engineer at site. | 2 | MT | - | - | - | - | - | - |
| 7.00 | Supplying and fixing of barbed wire for providing 8 rows of barbed wire and circular form 30 cm interval including cast of material, labour ,lead, lift etc., complete. | 965 | RM | - | - | - | - | - | - |
| 8.00 | Brick work in CM 1:5 using II class chamber burnt bricks for basement & superstructure including cost of all materials, all labour lead lift etc ., complete. super structure, including cost of all materials, all labour charges, lead, lift, etc. complete. | 626 | cum | - | - | - | - | - | - |
| 9.00 | Plastering with cm 1:3, 12mm thick for beams plinth compound wall etc. including cost of cement, all materials,curing, labour, lead and lift etc., complete. | 5,948 | sqm | - | - | - | - | - | - |
| 10.00 | Painting the inside walls with two coats of best quality interior emulsion of approved colour over a interior primer coat of all materials, etc., complete. | 4,867 | sqm | - | - | - | - | - | - |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
19 Dec 2019, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru-Vi-Ka Indl Estate, Guindy, Chennai-32
Construction of compound wall for the proposed Vembakkam 230/110 KV SS in the premises of the existing Vembakkam 110 KV SS
2019_EB_148455_1
TP1-075/2019-20
Open Tender
Civil Works
Works
120 days
Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.4 L
Yes
19 Feb 2020
22 Nov 2019
20 Dec 2019
22 Nov 2019
19 Dec 2019
22 Nov 2019
Amount
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.
Plain cement concrete 1:3:6, using 20 mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, for columns including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. For column concrete.) without form work
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, for columns including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. For column concrete.) with form work
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, for columns including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. For Grade Beam / Plinth Beam concrete.)
Supplying and fixing of 65x65x6mm GI angle for cable duct including cost of all materials, labour, lead, lift, etc., complete and as directed by the Department Engineer at site.
Supplying and fixing of barbed wire for providing 8 rows of barbed wire and circular form 30 cm interval including cast of material, labour ,lead, lift etc., complete.
Brick work in CM 1:5 using II class chamber burnt bricks for basement & superstructure including cost of all materials, all labour lead lift etc ., complete. super structure, including cost of all materials, all labour charges, lead, lift, etc. complete.
Plastering with cm 1:3, 12mm thick for beams plinth compound wall etc. including cost of cement, all materials,curing, labour, lead and lift etc., complete.
Painting the inside walls with two coats of best quality interior emulsion of approved colour over a interior primer coat of all materials, etc., complete.
Supplying and filling in low lying area with gravel including cost of gravel with JCB/other machineries, consolidation and with power roller including cost of all labour charges including initial lead lift, etc., complete
Providing steel reinforcement for RCC works including cost of all materials, labour, lead and lift, cutting, bending, tyeing,and placing in position including cost of binding wire etc., complete
Supplying and fixing in position with 110 mm dia PVC pipe 6 kg/cm2 including all specials clamps, shoes at bottom and cost of all material, lead, lift, etc., complete as per standard specification.
Supplying and fixing MS grill gates, MS grills, name board, hand rail, ladder, MS door with frame, etc. at various levels as per approved drawing using channel, square rods, ornamental grill parts and flats including fixing in position with suitable hold-fast locking arrangements etc. complete as per standard specification.
Supplying and fixing of 40w LED doom light including cost of a6m lenght 20 mm dia PVC pipe with wirieng and all accessories, labour, lead, lift, T&P, etc., complete
Supplying of flower pots including cost of all materials, labour, lead, lift , etc., complete
Labour charges for dismantling of RCC fencing post with chain link including cost of all materials, labour, lead, lift, etc., complete
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
A.H.CONSTRUCTIONS
Dillibabu
K S CONSTRUCTION
JD ENTERPRISES
ULTRAPOWER BUILDERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_178808.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .