| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.8 LAccepted-AOC VPO DUMERKHA KALAN TEH NARWANA 126116 | DUMERKHA KALAN | JIND | HARYANA | 126116 | ₹11.8 L | 1 | Accepted-AOC AOC |
| 2 | 2₹12.6 LRejected-Finance PLOT 411 GALI NO 9 GANDHI NAGAR GANDHI NAGAR 122001 | GANDHI NAGAR | GURUGRAM | HARYANA | 122001 | ₹12.6 L | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | The V.K. Co-Operative Labour & Construction Society Limited L1 | THE JIYA CO-OPERATIVE LABOUR & CONSTRUCTION SOCIETY LIMITED L1 |
|---|---|---|---|---|---|
| 2.00Repairing and Servicing of Electrification System LT and HT Work, Electrical Panels, Transformer, ACB and VCB at office building MCG Info City C1 Sector 34 under limit of municipal Corporation Gurgaon. | |||||
| 3.00 | Repairing/Servicing/Overhauling of Air Cirkit Breaker(ACB) 800/1000/1250/2000 Amp. LandT Make of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 8 | Each | 10,450 ₹83,600 | 11,000 ₹88,000 |
| 4.00 | Testing of ACB Release ACB 800/1000/1250/2000 Amp. LandT Make of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 8 | Each | 4,550 ₹36,400 | 4,700 ₹37,600 |
| 5.00 | Repairing/Servicing/Overhauling of VCB Main and Removing of Copper Sulphate with in deposit on Cluster, Contacts, VI, Spout, CT and PT Links and servicing of VCB Mechanism. Burnt main VCB`s Spout Repairing and Covering with Insulation of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 3 | Each | 56,550 ₹1,69,650 | 57,000 ₹1,71,000 |
| 6.00 | Replacement/Installation of 11KV Voltage Interrupter Make simense of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 3 | Each | 54,600 ₹1,63,800 | 57,000 ₹1,71,000 |
| 7.00 | Testing of HT 11KV VCB and HT panel with covering of HT, Insulation on HT panel of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 3 | Each | 13,570 ₹40,710 | 13,900 ₹41,700 |
| 8.00 | Repairing/Servicing/Overhauling of Transformer 1250 KVA VOLTAMP Make of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 2 | Each | 55,000 ₹1,10,000 | 55,500 ₹1,11,000 |
| 9.00 | Charges for Main LT panel AMF Control Wiring Repairing/Rectification including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 1 | Each | 30,980 ₹30,980 | 30,980 ₹30,980 |
| 10.00 | Supply and Erection ACB Charging Motor 220vAC including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 3 | Each | 30,320 ₹90,960 | 30,400 ₹91,200 |
| 11.00 | Supply and Erection of Shunt Release 24vDC including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 8 | Each | 3,835 ₹30,680 | 3,900 ₹31,200 |
Tender Value
₹11.8 L
EMD Value
₹23,557
Closing Date
13 Jan 2026, 12:00 pmClosed
SACHIN YADAV
Municipal Corporation Gurugram
Reparing and Servicing of Electrification System LT and HT Work, Electrical Panels, Transformer, ACB and VCB at office building MCG Info City C1 Sector 34 under limit of minicipal Corporation Gurgaon.
2026_HRY_494940_1
20263D430350 CC06 4071 AF3A 0BB6E62CC607285ULB
Open Tender
Civil Works
20 days
Gurugram
Reparing and Servicing of Electrification System LT and HT Work, Electrical Panels, Transformer, ACB and VCB at office building MCG Info City C1 Sector 34 under limit of minicipal Corporation Gurgaon.
2 documents required · 2 mandatory
₹1,000
Yes
₹23,557
Yes
27 Jan 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
Repairing and Servicing of Electrification System LT and HT Work, Electrical Panels, Transformer, ACB and VCB at office building MCG Info City C1 Sector 34 under limit of municipal Corporation Gurgaon.
Repairing/Servicing/Overhauling of Air Cirkit Breaker(ACB) 800/1000/1250/2000 Amp. LandT Make of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Testing of ACB Release ACB 800/1000/1250/2000 Amp. LandT Make of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Repairing/Servicing/Overhauling of VCB Main and Removing of Copper Sulphate with in deposit on Cluster, Contacts, VI, Spout, CT and PT Links and servicing of VCB Mechanism. Burnt main VCB`s Spout Repairing and Covering with Insulation of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Replacement/Installation of 11KV Voltage Interrupter Make simense of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Testing of HT 11KV VCB and HT panel with covering of HT, Insulation on HT panel of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Repairing/Servicing/Overhauling of Transformer 1250 KVA VOLTAMP Make of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Charges for Main LT panel AMF Control Wiring Repairing/Rectification including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection ACB Charging Motor 220vAC including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of Shunt Release 24vDC including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of TNC 25 Amp Switch including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of under voltage Switch 415 V including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Testing ,Meggering and Hipot the all Cable HT andLT including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Testing of 1250 kVA Transformer . IR Value/Magenetic Balance Test/ Votage Ratio/Safety Curcuit Test all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of Contactor MNX 32 Amp 220 V including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of Contactor MNX 40 Amp 220 V including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of VCB Panel Heater with Controller including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of VCB Indoor Joint Kit including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of MS Pipe C Class 150 MM dia including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Services Charges For Dismentaling of MS Pipe 150 mm including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of MS Bend 150 MM dia including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Buy Back and dismantled of old/damage Ms Pipe and Bend 150 mm nut bolt etc.
Supply and Erection of Pressure Guage including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of 5 HP Monoblock Pump Set including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Buy Back and dismantled of Old 5HP monoblock Pump Set to complete the job in all respect.
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Repairing and Servicing of Electrification System LT and HT Work, Electrical Panels, Transformer, ACB and VCB at office building MCG Info City C1 Sector 34 under limit of municipal Corporation Gurgaon.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_573402.xls
BOQ • 0.29 MB
AD0147535.pdf
Additional Documents • 0.98 MB
OT0147535.pdf
Other Document • 0.98 MB
Download all tender documents and submit your bid