| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC | ₹3.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.9 Cr+₹1.6 L (0.42%)Rejected-Finance GRAM HAZRATPUR PO SAHKARI NAGAR DISTRICT BULANDSHAHR | BULANDSHAHR | BULANDSHAHR | UTTAR PRADESH | ₹3.9 Cr+₹1.6 L (0.42%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹4.0 Cr+₹10.7 L (2.73%)Rejected-Finance 102 IST FLOOR DEVIKA CHAMBER RDC RAJ NAGAR GHAZIABAD U P | GHAZIABAD | UTTAR PRADESH | 201001 | ₹4.0 Cr+₹10.7 L (2.73%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹4.2 Cr+₹29.1 L (7.43%)Rejected-Finance | ₹4.2 Cr+₹29.1 L (7.43%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹4.6 Cr+₹72.7 L (18.6%)Rejected-Finance 75A HAMID VILLA AHMED NAGAR DODPUR ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹4.6 Cr+₹72.7 L (18.6%) | L5 | Rejected-Finance Rejected |
Tender Value
₹6.5 Cr
EMD Value
₹13 L
Closing Date
10 Jan 2025, 12:00 pmClosed
SE BSR Circle PWD Bulandshahr
SE BSR Circle PWD Bulandshahr
Widening and Strengthening of NH-91 Bulandshahr Aabadi Portion from Km 1 and 2(270) in District Bulandshahr
2025_CEMRT_988804_1
8745/96M/E-Tender/BSR Circle/2024-25 dt. 06.12.2024
Open Tender
Civil Works - Roads
Item Wise
365 days
Bulandshahr
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,714
₹13 L
Yes
SE BSR Circle PWD Bulandshahr
11 Feb 2025
1 Jan 2025
10 Jan 2025
1 Jan 2025
10 Jan 2025
1 Jan 2025
1 Jan 2025 - 2 Jan 2025
2 Jan 2025
Amount
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work..Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Construction of Subgrade and Earthen Shoulders with Material Deposited from Roadway Cuttingand excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2..Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2..Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface,mixing by mix in place method with front end loader at OMC & compacting with vibratory roller to achieve the desired density,complete as per clause 401..Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. MORT&H Specification 406 Sr No 4.14.Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Providing,laying,spreading & compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC & ordinary Portland Cement @ 1 % By weight of Mix and 3.5 % Emulsion SS1 By weight of Mix in mechanical mix plant carriage of mixed Material by tipper to site,laying in uniform layers with paver in sub- base / base course on well prepared surface & compacting with vibratory roller to achieve the designed ITS (Indirect Tensile Strength).Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Providing & applying tack coat with vg-10 bitumen using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H Specification 503..Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Providing and laying dense graded bituminous macadam Grading 2 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects..Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Providing & applying tack coat with VG-10 bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H Specification 503 .Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Providing & laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with VG-30 bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level & alignment, rolling with smooth wheeled, vibratory & tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects..Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Dismantling of existing structures like culverts,bridges, retaining walls & other structure comprising of masonry,cement concrete, wood work,steel work, including T&P & scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material & stacking the serviceable material with all lifts & lead of 1000 metres As per Clause 202.Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Plain Cement Concrete (grade M 10) in Open Foundation complete as per Drawing and Technical Specifications..Including cost of all material,labour, T&P,labour cess,royality & all taxes complete But Excluding GST
Plain Cement Concrete (grade M 30) in Drain Wall complete as per Drawing and Technical Specifications..Including cost of all material,labour, T&P,labour cess,royality & all taxes complete But Excluding GST
Supplying,fitting & placing HYSD bar reinforcement in sub-structure complete as per drawing & Technical Specifications MORT&H Specification 1600,2200 Sr No 13.6..Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Dismantling of flexible pavements (Bituminous Courses) and disposal of dismantled materials up to a lead of 1000 m, stacking serviceable & unserviceable materials separately as per Technical Specification Clause 202 S.No.2.05(A).
Dismantling of flexible pavements (Granular Courses) and disposal of dismantled materials up to a lead of 1000 m, stacking serviceable & unserviceable materials separately as per Technical Specification Clause 202 S.No.2.05(A).Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade on M-15 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone,kerb stone laid with kerb laying machine,foundation concrete laid manually,all complete as per clause 409 S.No.8.01.Including cost of all material,labour,T&P, & all taxes complete .
Construction of median and Island above road level with approved material brought from borrow pits, spread,sloped & compacted as per clause 408.Including cost of all material, labour,T&P & all taxes complete
Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.IInd Year 0.25% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO
Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete. But Excluding GST.IIIrd Year 0.50% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO
Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.IVth Year 0..75 % of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/ 113/2023 Dated 16.01.2024 or As per Pervailing GO
Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.Vth Year 1.00 % of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO
DEVEDNRA KUMAR (BID ID -4826922)
NP BUILDWELL PRIVATE LIMITED (BID ID -4833051)
M/S USHA CONTRACTORS AND CONSTRUCTIONS (BID ID -4835046)
S S CONSTRUCTIONS (BID ID -4835505)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1744647.xls
BOQ • 0.30 MB
159915844.pdf
Tender Documents • 0.88 MB
159915845.pdf
Tender Documents • 1.32 MB
159915846.pdf
Tender Documents • 0.16 MB
159915848.html
Tender Documents • 0.06 MB
160472400.pdf
Tender Documents • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .