| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹397.8 CrAccepted-AOC PATEL ESTATE ROAD JOGESHWARI WEST MUMBAI 400102 | MUMBAI SUBURBAN | MAHARASHTRA | 400102 | ₹397.8 Cr Quoted ₹402.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹414 CrRejected-AOC AFCONS HOUSE 16 SHAH INDUSTRIAL ESTATE VEERA DESAI ROAD AZADNAGAR ANDHERI W MUMBAI MAHARASHTRA INDIA400053 | MUMBAI SUBURBAN | MAHARASHTRA | 400053 | ₹414 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹425 CrRejected-AOC | ₹425 Cr | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹3.3 L
Closing Date
20 Dec 2021, 4:00 pmClosed
Municipal Commissioner,MCGM
Municipal Corporation of Greater Mumbai, 2nd floor, Old building, MCGM Head Office, Mahapalika Marg, Fort, Mumbai-400001
CONSTRUCTION OF TUNNEL FROM POWAI TO GHATKOPAR HIGH LEVEL RESERVOIR AND FURTHER UPTO GHATKOPAR LOW LEVEL RESERVOIR (REMAINING WORKS)
2021_MCGM_732516_3
MGC/F/5399 Dtd. 22/10/2021
Open Tender
Civil Works - Water Works
1552 days
Powai to Ghatkopar Reservoirs, Mumbai
As per Tender Documents
9 documents required · 9 mandatory
₹9,870
₹3.3 L
15 Jun 2022
15 Dec 2021
21 Dec 2021
15 Dec 2021
20 Dec 2021
15 Dec 2021
Amount
The bidders are requested to study and note the contents, provisions, serial numbers, item description etc. of the Volume -III i.e. Schedule of Payments / Pricing Schedule of the tender document.
PRICING SCHEDULE A1.1 - TOTAL COST
Total Cost for Construction of Tunnel from Powai to Ghatkopar High Level Reservoir to further upto Ghatkopar Low Level Reservoir (Remaining Works) inclusive of all taxes, levies, duties. etc. complete.
PRICING SCHEDULE A1.2 – DAY WORK NOTE: - The contractor is to enter below the fully inclusive rates which he will charge for work carried out on a daywork basis. These rates are to cover for all overtime, subsistence and conditional payments, transport of labour, supervisory costs, overhead charges and profit, waste, fuel, power, water and other consumable stores; use of all hand and pneumatic tools, light and non -mechanical plant; useof rail tracks, roads, scaffolding, staging , pumps, pipelines, hoists, derricks or cableways erected or in operation for other purposes and used incidently; spare and maintenance to plant; all as necessary for the proper and efficient carrying out of Dayworks ordered. All quantities are provisional.
LABOUR :
Unskilled Labourer (man)
Unskilled Labourer (woman)
Tradesman's helper
Carpenter and joiner
Concrete
Bricklayer
Drain layer or pipe fitter
Electrician
Fitter
Mason
Plumber
Quarryman
Steel bender and fixer
Watchman
Ganger
Chainmen & other personnel to assist Engineer's staff.
Gas cutter
Welder
PLANT :
Portable compressor with one tool and required length of hose 3 M3 / min.
Mobile crane - 10 to 15 tonne
Dumper / Tipper - 5 M3 Capacity
Generating set - 60 kw (approximately)
Electric welding set including auxiliary equipment and consumable.
-Do- oxy-acetylene gas cutting / gauging equipment including gas.
Loading Shovel - 1 M3
Dewatering pump with required suction hose, foot valve and strainer, delivery hose, etc.
iii) 15 H.P.
Concrete mixer 10/7 capacity
Afcons Infrastructure Limited
MANTENA INFRASOL PVT LTD
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf