| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.7 CrAccepted-AOC | ₹2.7 Cr | 1 | Accepted-AOC 1st Lowest |
| 2 | 2₹2.9 Cr+₹17.9 L (6.63%)Rejected-AOC D 128 SECTOR 10 NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹2.9 Cr+₹17.9 L (6.63%) | 2 | Rejected-AOC 2nd Lowest |
| 3 | 3₹2.9 Cr+₹22.2 L (8.24%)Rejected-Finance UTTAR PRADESH | ₹2.9 Cr+₹22.2 L (8.24%) | 3 | Rejected-Finance 3rd Lowest |
| 4 | Not Admitted-Fee/PreQual/Technical CHANDAULI | UTTAR PRADESH | 221009 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.2 Cr
EMD Value
₹6.4 L
Closing Date
9 Jan 2025, 12:00 pmClosed
Superintending Engineer
S.E. eighteen circle Irrigation works, Govindpur, prayagraj
Restoration and Demarcation work of canal land from head to km. 18.400 of Allahabad Dy. under the control of irrigation Division-1, Prayagraj in Prayagraj Dist. Lot-01
2025_UPIDC_988862_1
06/S.E./2024-25
Open Tender
Civil Works - Canal
Item Rate
240 days
S.E. eighteen circle Irrigation works prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6.4 L
Yes
S.E. eighteen circle Irrigation works, prayagraj
27 Mar 2025
2 Jan 2025
9 Jan 2025
2 Jan 2025
9 Jan 2025
2 Jan 2025
3 Jan 2025
Amount
Earth work in excavation of foundation in ordinary soil/sandy loam, clay or sand including lift upto 1.5 meter and lead upto 30 meter including filling, watering, ramming of excaveted earth into the trenches or up to the space and sides of the foundation trenches or into charge upto a distance of 30 meter from the foundation trenches. soil mix with chharri bajari, Dry earth work in foundation as per direction of engineer in charge.
Laying Plain Cement Concrete in 1:2:4 (M-15) with 4.75 to 20 mm size crushed stone ballast & Coarse sand having F.M.(Fineness modulus) not less than 2. including all cost of labour,materials,T&P etc. compaction required for proper completion of work as per direction of engineer in charge.
Providing Steel Reinforcement and cutting bending, binding and palcing in position of reinforcement including cost of binding wire including labour material & T&P etc. as per direction of engineer in charge.
Reinforced cement concrete M-20 (1:1.5:3) with stone grit cement, coarse sand and With maximum size of 20 mm stone gritt including cost of labour material etc. complete as per direction of Engineer in charge.
Centering & Shuttering for reinfored cement concrete work in super structure including cost of material, labour etc. complete as per direction of Engineer in charge.
Earth work by manual labour in embankments of more than 1.50m height on Ramp approach and Road Diversion with material and labour etc. as per direction of Engineer in charge.
First class brick on edge soling both side with filling joints with earth and preparation of sub grade including cost of Labour & T&P etc. complete. as per direction of Engineer in charge.
Earth work in Restoration of Daula of Allahabad dy. From km. 0.000 to 16.100 with manual compaction and dressing including all T&P, lead and lift etc. complete As per direction of engineer in charge.
Supplying and Fixing 75mm. Dia P.V.C. pipe for weep holes & rain water including cost of labour material etc. as per direction of engineer in charge.
Dewatering by hiring 5H.P. diesel pumps including operator & P.O.L. complete as per direction of Engineer-in-charge.
Supplying and Fixing Sign Board For Information Fabricated with steel angles, flats and plates including all material, labour T&P etc. complete as per direction of Engineer-in-charge.
Proving and Laying 1:1:2 (M-25) cement concrete with cement, coarse sand and maximum size of 20 mm stone gritt in wearing coat including cost of material, labour etc. complete as per direction of Engineer in charge.
Pre-Costing & fixing Boundary pillar of Allahabad dy. From Head to Tail both side every 200 m including all cost of material,labour T&P etc.work complete as per direction of engineer in charge.
Reinforced cement concrete/ cement concrete block (M-20) 1:1.5:3 with stone grit 4.75 to 20 mm size, cement and coarse sand including cost of labour material etc. complete as per direction of site incharge.
Plain cement concrete in 1:2:4 (M-15) cement, coarse sand and 4.75mm to 20 mm stone grit under fall bed including all cost of labour material etc. complete as per direction of site incharge.
1st class brick work in 1:4 Cement mortar including all material, labour T&P etc. complete as per direction of site incharge.
Deep struck pointing 1:2 Cement mortar including all material, labour T&P etc. complete as per direction of site incharge.
Finishing wall with two coats of water proofing cement paint of approved make & quality of required shade on wall surface over one coat of white cement primer with preparation of surface including cost of all material etc. as per direction of site in incharge.
Plain cement concrete in 1:3:6 (M-10) with cement, coarse sand and 20 to 40 mm stone grit including mechanical vibration, all labour and T&P etc with mechanical mixing as per direction of site in incharge.
Earth work in excavation of foundation in ordinary soil/sandy loam, clay or sand including lift upto 1.5 meter and lead upto 30 meter including filling, watering, ramming of excaveted earth into the trenches or up to the space and sides of the foundation trenches or into charge upto a distance of 30 meter from the foundation trenches. Dry earth work in foundation as per direction of engineer in charge.
Laying Plain Cement Concrete in 1:3:6 in cement, coarse sand and stone grit up to 20 mm size crushed stone ballast & Coarse sand having F.M. not less than 2.0 including all cost of labour, materials, T&P etc. coppaction required for proper completion of work as per direction of site in incharge.
Supply & Laying of LDPE Film below cement concrete Lining including all cost of material, labour T&P etc. complete. as per direction of site in incharge.
Casting and fixing of Reinforced cement concrete Wheel guard including all labour, materials T&P etc. complete. as per direction of site in incharge.
Earth work in correcting internal section of Allahabad Dy. from km 0.000 to km 18.400 by Hydraulic excavator (Poclain/JCB) with side slop cutting at required slope including all lead & lift in all type of soil with proper disposal , compaction & dressing of bank and daula as directed by the site in charge .
Earth work in Restoration of Allahabad Dy. From km. 0.000 to 0.600 L/B and km 0.600 to km 16.200 R/B and 16.200 to 18.400 both bank of canal by hydraulic excavator (poclane/JCB) including lead upto maximum 210m and lift with proper compaction in layers and dressing etc complete as directed by the site in charge .
Preparation of sub grade for lining work including all cost of material, labour T&P etc. complete as directed by the site in charge .
Laying local sand including screening work and stacking at quarry site including all cost of labour material, T&P etc. compaction required for proper completion of work as directed by the site in charge .
Centering & Shuttering for cement concrete work in super structure including cost of material, labour etc. complete as per direction of Engineer in charge.
Fabrication and supplying of steel for gate including all labour, material , T&P etc. complete as per direction of Engineer in charge.
Threding, turning charge of 50 mm dia spindle rod including all labour, materals T&P etc. complete as per direction of Engineer in charge.
Supplying and Fixing of bearing set for 50 mm dia spindle rod in steel gate including all cost of labour, materials, T&P etc. complete. as per direction of Engineer in charge.
Supplying and Fixing of cost iron 10" dia coller couppling with 4 nos. 5/8" holes in equal distance for steel gate including all cost of labour ,materials, T&P etc. complete as per direction of Engineer in charge.
Fabrication and supplying of handle including all material, labour T&P etc. Complete as per direction of Engineer in charge.
Supplying and Fixing of cost iron housing with gun metal bush in steel gate including all cost of labour, materials, T&P etc. complete as per direction of Engineer in charge.
Supplying and Fixing cost iron Coupling and housing nut bolt 3"x5/8" for steel gate including all cost of labour, materials, T&P etc. complete as per direction of Engineer in charge.
Painting two coat of synthetic enamel paint on new surface(excuding cost of primer) superior quality such as luxol, highgloss, apcolite, superiac, dulux including cost of all material labour t &p etc required for proper completion of work as per direction of Engineer in charge.
Hiring charge of tripod , chain tackle , tractor trolly for lowering of steel gate including all cost of labour, materials, T&P etc. complete. as per direction of Engineer in charge.
Earth work in making canal section in 08 No. off taking minors from Allahabad Dy. for repairing head regulator with all type of soil including proper manual compaction and dressing with all lead , lift T&P etc. complete as per direction of Engineer in charge.
Oiling and greasing work steel gate including all cost of labour, materials, T&P etc. complete as per direction of Engineer in charge.
Painting one coat of red oxide primer on steel surface after sand papering and cleaninig of surface including cost of all material labour and t&p etc as per direction of Engineer in charge.
Providing and fixing 100 mm dia Reinforced cement concrete N.P.3 pipe including all cost of material, labour T&P etc. complete as per direction of Engineer in charge.
12 mm thick Plastering work in 1:4 cement sand mortar including all cost of labour, materials, T&P etc. complete as per direction of Engineer in charge.
Varun Kumar Singh (BID ID -4840191)
DEEPAK CONTRUCTION (BID ID -4841056)
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .