Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC MALDA 732101 | MALDA | MALDA | WEST BENGAL | 732101 | ₹9.8 L | L1 | Accepted-AOC L1-Accepted |
| 2 | L2₹9.9 LRejected-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹9.9 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹9.9 LRejected-Finance 21 KBM CHAKDAH P O P S CHAKDAH DIST NADIA PIN 741222 | CHAKDAH | NADIA | WEST BENGAL | 741222 | ₹9.9 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | DEY ENTERPRISE L2 | DAS CONSTRUCTION L3 | SHREE BISHNU CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of 62.5 KVA Diesel Generator Set by engaging skilled personnel having sufficient experience , as and when required as per direction including guarding of the Generator set round the clock. (This cost is excluding the cost of fuel & lubricant required.) | 365 | Days | 621.52 ₹2.3 L | 621.94 ₹2.3 L | 620.91 ₹2.3 L |
| 1.01 | ESIC Contribution for Employers for Sl No. 1 @3.25% | 365 | Days | 15.83 ₹5,777.95 | 15.83 ₹5,777.95 | 15.83 ₹5,777.95 |
| 1.02 | EPF Contribution for Employers for Sl No. 1 @13% | 365 | Days | 63.31 ₹23,108.15 | 63.31 ₹23,108.15 | 63.31 ₹23,108.15 |
| 2.00 | Supervision charges for electrical installation by licensed electrician as per IE Rules, 1956 read with latest amendments bearing valid workmanship permit and mechanic for diesel generator set with overhead expenditures as per specification and direction of E.I.C. | 12 | Months | 8,682.7 ₹1.0 L | 8,688 ₹1.0 L | 8,674.26 ₹1.0 L |
| 4.00 | Consumption of diesel for silent type air cooled rebust canepy type 62.5 KVA capacity DG set @ 8 Ltr./Hr. including all carriage & storage for average 2 hours run/day as per direction. (Consumption of diesel oil has been taken as per actual measurement of logbook which value should not cross the scheduled quantity).
365 days X 2 Hours run/day. | 730 | Hrs. | 831.12 ₹6.1 L | 831.69 ₹6.1 L | 830.32 ₹6.1 L |
| 5.00 | Consumption of Mobil oil including all carriage & storage for the 62.5 KVA DG set for 365 days X 2 Hours run/day. (Consumption of Mobil oil has been taken as per actual measurement of logbook which value should not cross the scheduled quantity). | 730 | Hrs. | 12.36 ₹9,022.80 | 12.37 ₹9,030.10 | 12.34 ₹9,008.20 |
| 6.00 | Add Cess @ 1% | 1 | item | 9,756.74 ₹9,756.74 | 9,763.14 ₹9,763.14 | 9,747.51 ₹9,747.51 |
Tender Value
Refer Docs
EMD Value
₹19,400
Closing Date
14 Jan 2026, 6:00 pmClosed
Executive Engineer, Malda Mechanical Division, PHE
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Operatin and maintance works at different surfacre and sub surface based water supply shcemes under MLMD PHE Dte.
2025_PHED_970135_26
WBPHED/EE/MLMD/NIeT_17 of 2025-2026
Open Tender
Electrical Work/ Equipment
365 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
5 documents required · 5 mandatory
₹19,400
20 May 2026
19 Dec 2025
16 Jan 2026
19 Dec 2025
14 Jan 2026
19 Dec 2025
Amount
Operation of 62.5 KVA Diesel Generator Set by engaging skilled personnel having sufficient experience , as and when required as per direction including guarding of the Generator set round the clock. (This cost is excluding the cost of fuel & lubricant required.)
ESIC Contribution for Employers for Sl No. 1 @3.25%
EPF Contribution for Employers for Sl No. 1 @13%
Supervision charges for electrical installation by licensed electrician as per IE Rules, 1956 read with latest amendments bearing valid workmanship permit and mechanic for diesel generator set with overhead expenditures as per specification and direction of E.I.C.
Consumption of diesel for silent type air cooled rebust canepy type 62.5 KVA capacity DG set @ 8 Ltr./Hr. including all carriage & storage for average 2 hours run/day as per direction. (Consumption of diesel oil has been taken as per actual measurement of logbook which value should not cross the scheduled quantity). 365 days X 2 Hours run/day.
Consumption of Mobil oil including all carriage & storage for the 62.5 KVA DG set for 365 days X 2 Hours run/day. (Consumption of Mobil oil has been taken as per actual measurement of logbook which value should not cross the scheduled quantity).
Add Cess @ 1%
DEY ENTERPRISE (BID ID -7882841)
DAS CONSTRUCTION (BID ID -7882867)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.12 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2379395.xls
BOQ • 0.40 MB
Terms_DG.pdf
Tender Documents • 0.35 MB
Download all tender documents and submit your bid