| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99,478.50Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹99,593.20+₹114.70 (0.12%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | V RAJINIKATH CONTRACTOR L2 | NACHIYAR ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Repair work of Library building in Veliyathur village at Veliyathur Panchayat | |||||
| 2.00 | chipping the concrete and roughing the surface including all labour charges etc | 2.1 | M2 | 9 ₹18.9 | 8 ₹16.8 Lowest |
| 3.00 | Special ceiling plastering and finishing the exposed surface of all RCC items of work with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including curing etc. complete complying with standard specification and as directed by the departmental officers. | 1.2 | M2 | 313 ₹375.6 Lowest | 313 ₹375.6 Lowest |
| 4.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 0.9 | M2 | 273 ₹245.7 Lowest | 273 ₹245.7 Lowest |
| 5.00 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers (40% ) | 41.28 | M2 | 1,091 ₹45,036.48 Lowest | 1,091 ₹45,036.48 Lowest |
| 6.00 | White washing two coats, including cost and conveyance all materials and scaffolding charges etc., complete | 45.66 | M2 | 37 ₹1,689.42 Lowest | 37 ₹1,689.42 Lowest |
| 7.00 | Oil bound Distempering painting with two coats, Using Oil bound Distemper including cost and conveyance all materials and scaffolding charges etc., complete | 153.3 | M3 | 69 ₹10,577.7 Lowest | 69 ₹10,577.7 Lowest |
| 8.00 | Re Painting the walls with Two coats with first class quality Plastic Emulsion Paint of approved colour over a priming coat including through scraping,clean removal of dirt. The rate includers cost of brushes sand papper,plaster of parries, putty wherever required and neat finishing etc.complete complying with standard specification and as directed etc | 95.6 | M3 | 254 ₹24,282.4 | 253 ₹24,186.8 Lowest |
| 9.00 | Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) | 15 | M2 | 145 ₹2,175 Lowest | 145 ₹2,175 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 15,192 ₹15,192 | 15,175 ₹15,175 Lowest |
Tender Value
₹1.0 L
EMD Value
₹1,040
Closing Date
11 Jul 2025, 3:00 pmClosed
BDO
Union office,Kallal
Repair work of Library building in Veliyathur village at Veliyathur Panchayat
2025_RDTN_579160_1
Repair work of Library building in Veliyathur village at Veliyathur Panchayat
Open Tender
Civil Works
Item Rate
180 days
Veliyathur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,040
30 Sept 2025
7 Jul 2025
11 Jul 2025
7 Jul 2025
11 Jul 2025
7 Jul 2025
Amount
Repair work of Library building in Veliyathur village at Veliyathur Panchayat
chipping the concrete and roughing the surface including all labour charges etc
Special ceiling plastering and finishing the exposed surface of all RCC items of work with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers (40% )
White washing two coats, including cost and conveyance all materials and scaffolding charges etc., complete
Oil bound Distempering painting with two coats, Using Oil bound Distemper including cost and conveyance all materials and scaffolding charges etc., complete
Re Painting the walls with Two coats with first class quality Plastic Emulsion Paint of approved colour over a priming coat including through scraping,clean removal of dirt. The rate includers cost of brushes sand papper,plaster of parries, putty wherever required and neat finishing etc.complete complying with standard specification and as directed etc
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
V RAJINIKATH CONTRACTOR (BID ID -1398801)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_692141.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .