Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹45,000
Closing Date
24 Sept 2026, 1:00 pm2d left
EE RED CHITRAKOOT
EE RED CHITRAKOOT
Vikas Khand Pahari G.P. Naini me Barat ghar ka nirman
2026_REDUP_1173844_2
291/RED/NIVIDA/2026-27
Open Tender
Civil Works
Percentage
Vikas Khand Pahari G.P. Naini me Barat ghar ka nir
Please refer Tender documents.
3 documents required · 3 mandatory
₹766
₹45,000
Yes
19 Sept 2026
19 Sept 2026
24 Sept 2026
19 Sept 2026
24 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning Jungle Including Uprooting of Rank Vegetation, Grass, Brush Wood, Trees and Saplings of Girth up to 30cm Measured at a Height of 1m Above Ground Level and removal of Rubbish upto a distance of 50m outside the periphery of the Area Cleared as per SOR Page No. 79 Item No. 2.2(I) (A) | 400 | sqm | 3.8 | ₹1,520 |
| 2 | Preparing of Boring holes 20cm Dia or 30cm Dia Pilesof S.U.R. 3.5m deep in B.C.Soil by hand auger set I/C of all labour T&P etc.in black cottan soil.
30 cm dia S.O.R.Page No. 24 New Item No. 3 | 47 | Nos | 617.5 | ₹29,022.5 |
| 3 | R.C.C work in 1:2:4 with cement c.sand &20 mm Grit in pile foundation i/c all mat. Labour T&P etc. S.I.No.279(A) | 15.61 | Cum | 5,225 | ₹81,562.25 |
| 4 | R.C.C work in 1:2:4 with cement c.sand &20 mm Grit in plinth beam i/c all mat. Labour T&P etc.S.I.No. 283 | 6.18 | Cum | 6,080 | ₹37,574.4 |
| 5 | R.C.C work in 1:1.5:3 with cement c.sand &20 mm Grit in Column i/c all mat. Labour T&P etc. S.I.No.289 | 5.94 | Cum | 7,125 | ₹42,322.5 |
| 6 | M-150 class Brick works in 1:6 cement sand morter in plinth to foundation including all materials labour & T&P etc. complete work S.I.-303 | 10.46 | Cum | 4,940 | ₹51,672.4 |
| 7 | P/L 25 mm thick D.P.C.with 1:1.5:3 with cement c.sand & 13 mm stone grit with water proofing compound i/c all materials , labour & T&P etc. S.I.-361 | 24.71 | sqm | 218.5 | ₹5,399.14 |
| 8 | M-150 class Brick works with1:6 cement sand mortar in superstructure one brick wall including all materials labour & T&P etc. complete work S.I.-303+309+310 | 33.65 | Cum | 5,377 | ₹1,80,936.05 |
| 9 | R.C.C work in 1:2:4 with cement c.sand &20 mm Grit in lintel & sunshed etc. i/c all mat. Labour T&P etc S.I.No.283 | 4.17 | Cum | 6,080 | ₹25,353.6 |
| 10 | R.C.C work in 1:1.5:3 with cement c.sand &20 mm Grit. In T-Beam & Slab i/c all mat. Labour T&P etc. S.I.No.289 | 29.62 | Cum | 7,125 | ₹2,11,042.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_2236767.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .