| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | -41.99% | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹3.2 L (1.26%)Admitted-Finance | -41.26% | ₹2.6 Cr+₹3.2 L (1.26%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 Cr+₹8.8 L (3.45%)Admitted-Finance | -39.99% | ₹2.6 Cr+₹8.8 L (3.45%) | L3 | Admitted-Finance |
| 4 | L4₹3.0 Cr+₹42.6 L (16.7%)Admitted-Finance | -32.32% | ₹3.0 Cr+₹42.6 L (16.7%) | L4 | Admitted-Finance |
| 5 | L5₹4.2 Cr+₹1.6 Cr (63.8%)Admitted-Finance KUSHAL BAG RAJ RAJESHWARI COLONY BANSWARA 327001 RAJASTHAN | BANSWARA | BANSWARA | RAJASTHAN | 327001 | -5.00% | ₹4.2 Cr+₹1.6 Cr (63.8%) | L5 | Admitted-Finance |
Tender Value
₹4.4 Cr
EMD Value
₹8.8 L
Closing Date
19 Aug 2026, 6:00 pmClosed
Superintending Engineer
Superintending Engineer Water Resources Construction Circle Dungarpur
Construction of Dham ka Talab Anicut Village Tham Ka Talab P.S. Simalwara and Babra Ka Naka Anicut (Chaurasi) Village -Mandela Upli P.S. Jhothari District Dungarpur
2026_WRDAS_579767_1
NIT01/2026-2027 SE WR CONST CIRCLE UDAIPUR
Open Tender
Civil Works
Percentage
365 days
DUNGARPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
EGRASS CHALLAN AS PER NIT
₹8.8 L
Yes
DUNGARPUR
15 Sept 2026
31 Jul 2026
20 Aug 2026
31 Jul 2026
19 Aug 2026
31 Jul 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial leadof 50m and lift up to1.5m including dressing of excavated area and dewatering wherever requiredcomplete in all respect (c) Hard soil mixed with Kankar / boulders, Morrum | 1,744.88 | Cum | 99 | ₹1,72,743.12 |
| 2 | Excavation in cluding loading unloading disposal and dressing of excavated rock with in initial lead of 50 m and lift up to 1.5 min dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. (a) Soft / Disintegrated rock | 1,744.88 | cum | 134 | ₹2,33,813.92 |
| 3 | Excavation in cluding loading unloading disposal and dressing of excavated rock with in initial lead of 50 m and lift up to 1.5 min dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. (b) Hard rock not requiring blasting | 2,617.32 | cum | 201 | ₹5,26,081.32 |
| 4 | Excavation in cluding loading unloading disposal and dressing of excavated rock with in initial lead of 50 m and lift up to 1.5 min dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. (c) Phylite & other hard rock requiring nominal blasting | 2,617.32 | cum | 291 | ₹7,61,640.12 |
| 5 | Extra over for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. (a) Soft / Disintegrated rock | 697.96 | cum | 33.5 | ₹23,381.66 |
| 6 | Extra over for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. (b)Hard rock not requiring blasting | 2,617.32 | cum | 50.25 | ₹1,31,520.33 |
| 7 | Extra over item for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to beconsidered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.(c)Phylite & other hard rock requiring nominal blasting | 2,617.32 | cum | 72.75 | ₹1,90,410.03 |
| 8 | (a) Drilling holes of 35 mm diameter for anchor rods. (i) Upto 1.50 m depth | 429 | Meter | 128 | ₹54,912 |
| 9 | (b) Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete | 286 | Each | 216 | ₹61,776 |
| 10 | Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete. | 3,304.4 | kg | 61.02 | ₹2,01,634.49 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Technical-Bid-Babra-ka-Naka.pdf
Tender Documents • 1.34 MB
BOQ_1030216.xls
BOQ • 0.27 MB
Fiancial-Bid-Babra-ka-Naka.pdf
Tender Documents • 3.69 MB
Pre-bid-Meeting-of-minutes.pdf
PDF • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .