Loading
Loading…
Loading…
Tender Value
₹3.0 Cr
EMD Value
₹3.7 L
Closing Date
1 Jul 2026, 6:00 pm
CECZ chennai zone
CECZ chennai zone, island ground, chennai
ADDN ALTN TO BLDG. No. P 79 FOR SETTING UP OF ROH FACILITY FOR ROTAX SERIES ENGINE AT 8 BRD
2026_MES_769548_1
82961/E8
Open Tender
Civil Works
365 days
Avadi
As per tender document
8 documents required · 8 mandatory
₹2,000
GE Avadi
₹3.7 L
Yes
3 Jun 2026
3 Jun 2026
8 Jul 2026
3 Jun 2026
1 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.5 | B/R PORTION | - | - | - | - |
| 1 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 875 | Square Metre | - | - |
| 2 | Roughening surfaces of old concrete floor by picking ,sweeping clean and washing down with water to remove dust complete all as specified and directed. | 422 | Square Metre | - | - |
| 3 | Dismantling of Stone slab and tiles laid bedded and pointed in any mortar of any description or thickness in floors, apron etc complete all as specified and directed. | 2.5 | 10 Square Metre | - | - |
| 4 | Demolition of un-reinforced cement concrete as in of any description and any in position not otherwise specifically provided complete all as directed | 5 | Cubic Metre | - | - |
| 5 | Demolition Cement concrete (unreinforced concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed. | 90 | Cubic Metre | - | - |
| 6 | Demolition Reinforced Cement concrete of any description and in any position not otherwise specifically provided for complete all as directed | 7 | Cubic Metre | - | - |
| 7 | Taking down plastering on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as directed | 1,600 | Square Metre | - | - |
| 8 | Taking down chowkhats or frames with shutters and (without taking off shutters from frames) n.exc 1.5 sq. m each complete all as specified and directed. | 92 | EACH | - | - |
| 9 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) exc 1.5 sq. m but n exc 4 sq. m each complete all as specified and directed. | 26 | EACH | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_861807.xls
BOQ • 0.92 MB
Tenderdocument.pdf
Tender Documents • 1.67 MB
Download all tender documents and submit your bid