| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.3 L+₹6,966.62 (1.66%)Admitted-Finance 7 KALIANNAN EXTENSION VAIKKAL ROAD GOBI 638452 | GOBI | ERODE | TAMIL NADU | 638452 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SELVARAJ P L2 | CHANDRASEKARAN C L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in hard gravelly soil with initial lead and lift narrow trench as per SS20 B for Foundation | 15.06 | Cum | 275 ₹4,141.5 | 263 ₹3,960.78 Lowest |
| 2.00 | Filling with good river sand including cost and conveyance of all materilas to site and all labour chargs etc., complete | 7.04 | Cum | 2,050 ₹14,432 | 2,035 ₹14,326.4 Lowest |
| 3.00 | Foundation Concrete in C:C 1:4:8 mix using 40mm ISS HBG metal including cost and labour etc., complete | 2.9 | Cum | 5,760 ₹16,704 | 5,750 ₹16,675 Lowest |
| 4.00 | Brick work in following Cement Mortar 1:5 using country bricks including cost and conveyance of materilas to site and all other labour charges as per standard specifications | 7.83 | Cum | 6,220 ₹48,702.6 | 6,210 ₹48,624.3 Lowest |
| 5.00 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | 53.68 | Sqm | 1,100 ₹59,048 | 1,095 ₹58,779.6 Lowest |
| 6.00 | Supplying and fabrication of steel including cost and labour charges etc., complete | 0.79 | MT | 91,963.6 ₹72,191.43 Lowest | 91,963.6 ₹72,191.43 Lowest |
| 7.00 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and labours etc., complete | 7.81 | Cum | 9,500 ₹74,195 Lowest | 9,500 ₹74,195 Lowest |
| 8.00 | Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete complying with standard specification as directed. | 13.8 | Sqm | 145 ₹2,001 | 134.5 ₹1,856.1 Lowest |
| 9.00 | Supplyinf and applying two coats of putty of 3mm thick including cost and labour charges etc., complete | 31.3 | Sqm | 335 ₹10,485.5 | 308.5 ₹9,656.05 Lowest |
| 10.00 | Plastering in c.m(1:5) to 12 mm thick including cost and conveyance to site and all labours etc., complete. | 86.04 | Sqm | 295 ₹25,381.8 | 287 ₹24,693.48 Lowest |
Tender Value
₹4.2 L
EMD Value
₹4,240
Closing Date
24 Nov 2025, 6:50 pmClosed
The Block Development Officer (VP)
Panchayat Union, Ariyalur
Construction of Power Pump room at Karu-Senabathi Near Multi Purpose Center in Melakarupur Panchayat in Ariyalur Block under PUGF 2025-26
2025_RDTN_626094_1
RC.No.A2/1151/2024, Date.24.11.2025
Open Tender
Civil Works - Buildings
Item Rate
90 days
Ariyalur
As per tender document
5 documents required · 5 mandatory
₹0
₹4,240
25 Nov 2025
24 Nov 2025
24 Nov 2025
24 Nov 2025
24 Nov 2025
24 Nov 2025
Amount
Earth work excavation in hard gravelly soil with initial lead and lift narrow trench as per SS20 B for Foundation
Filling with good river sand including cost and conveyance of all materilas to site and all labour chargs etc., complete
Foundation Concrete in C:C 1:4:8 mix using 40mm ISS HBG metal including cost and labour etc., complete
Brick work in following Cement Mortar 1:5 using country bricks including cost and conveyance of materilas to site and all other labour charges as per standard specifications
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Supplying and fabrication of steel including cost and labour charges etc., complete
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and labours etc., complete
Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete complying with standard specification as directed.
Supplyinf and applying two coats of putty of 3mm thick including cost and labour charges etc., complete
Plastering in c.m(1:5) to 12 mm thick including cost and conveyance to site and all labours etc., complete.
Emulsion paint two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats with ready mixed paint including cost and conveyance charges etc.
Cost and supply of steel door of size (0.90x2.10)including etc as per deparmental officer approved including etc
Cost and supply of Jally of size (0.60x0.60)including etc as per deparmental officer approved including etc
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SELVARAJ P (BID ID -1520054)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .