Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.5 Cr
EMD Value
₹24.7 L
Closing Date
28 Nov 2026, 12:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
S.E., Hamirpur Circle, PWD Hamirpur
S.E., Hamirpur Circle, PWD Hamirpur
New construction work at village Kunwa to Punniya Link Road
2026_CEBAN_1194837_1
1899/30C-Hamirpur Circle/2026 Date 30.09.2026
Open Tender
Civil Works - Roads
Percentage
300 days
CD-1 PWD Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹24.7 L
S.E., Hamirpur Circle, PWD Hamirpur
28 Nov 2026
26 Oct 2026
28 Nov 2026
26 Oct 2026
28 Nov 2026
26 Oct 2026
27 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Ordinary soil) | 21,322 | cum | 85 | ₹18,12,370 |
| 2 | Blenket coat
Construction of granular surface Course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80 100 kn static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402. | 10,023.75 | cum | 1,765 | ₹1,76,91,918.75 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 206.55 | cum | 2,100 | ₹4,33,755 |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means | 143.44 | cum | 2,650 | ₹3,80,116 |
| 5 | Cement treated subbase
Providing, laying, spreading Material on prepared sub grade adding cement @ 2% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength to form a layer of subbase. | 1,809.47 | cum | 2,530 | ₹45,77,959.1 |
| 6 | Cement Treated Sub Base
Providing, laying, spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road rollar at OMC to achieve the desired unconfined compressive strength to form a layer of base. | 2,357.25 | cum | 2,990 | ₹70,48,177.5 |
| 7 | Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503. | 16,837.5 | sqm | 29 | ₹4,88,287.5 |
| 8 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen)
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
Case - I By Manual Means
(I)Bitumen (S-90) | 16,837.5 | sqm | 195 | ₹32,83,312.5 |
| 9 | Seal Coat
Providing and laying seal coat by Manual Means with VG-10 Grade Bitument sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 | 16,837.5 | sqm | 75 | ₹12,62,812.5 |
| 10 | Construction of subgrade and earthen shoulder with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Ordinary soil) | 5,076 | Cum | 79 | ₹4,01,004 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tendernotice_2.pdf
PDF • 1.82 MB
BOQ_2271473.xls
BOQ • 0.32 MB
Shu1899CD1M.pdf
PDF • 0.20 MB
Shuddhipatra1899CD1M.pdf
PDF • 0.16 MB
Shuddhipatra1899CD1Mahoba2.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .