Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC PASUMALAITHANGAL GINGEE VILUPPURAM | ₹19.7 L | L1 | Accepted-AOC Less Bid Value |
| 2 | L2₹20.2 LRejected-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹20.2 L | L2 | Rejected-Finance High Bid Value |
| Sl No | Description | Qty | Unit | R SELVARAJ L1 | Rajkumar M L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete. | 135.09 | Cum | 196 ₹26,477.64 | 200 ₹27,018 |
| 2.00 | Supplying and filling in foundation, basement, etc with filling Crushed stone sand(M.Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc., Complete. | 76.64 | Cum | 1,736 ₹1.3 L | 1,825 ₹1.4 L |
| 3.00 | Cement Concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing, laying, curing etc complete. | 76.64 | Cum | 5,354 ₹4.1 L | 5,450 ₹4.2 L |
| 4.00 | Plain Cement concrete in C.C.1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all charges etc., | 41.47 | Cum | 6,654 ₹2.8 L | 6,750 ₹2.8 L |
| 5.00 | Plain Cement concrete in C.C.1:3:6 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all charges etc., | 66.37 | Cum | 6,108 ₹4.1 L | 6,250 ₹4.1 L |
| 6.00 | Supply and Erection of steel centering for sides and soffits including cost and conveyance of all materials to site and all labour charges etc., complete Below Sill | 576 | Sqm | 547 ₹3.2 L | 555 ₹3.2 L |
| 7.00 | Supply and Erection of steel centering for sides and soffits including cost and conveyance of all materials to site and all labour charges etc., complete Above Sill | 10.53 | Sqm | 1,095 ₹11,530.35 | 1,125 ₹11,846.25 |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 180 | Kg | 91 ₹16,380 | 95 ₹17,100 |
| 9.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges center | 2.36 | Cum | 9,091 ₹21,454.76 | 10,000 ₹23,600 |
| 10.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 86.4 | Sqm | 578 ₹49,939.20 | 600 ₹51,840 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
28 Jan 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICE
BLOCK DEVELOPMENT OFFICE PERAMBALUR
Providing CC Road in Mettur Kamarajar Nagar at Pudhunaduvalur Pt
2026_RDTN_644671_1
Lr No 3033/2025/A3 Dt 13.01.2026
Open Tender
Civil Works
180 days
BLOCK DEVELOPMENT OFFICE PERAMBALUR
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹0
₹20,000
16 Feb 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.
Supplying and filling in foundation, basement, etc with filling Crushed stone sand(M.Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc., Complete.
Cement Concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing, laying, curing etc complete.
Plain Cement concrete in C.C.1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all charges etc.,
Plain Cement concrete in C.C.1:3:6 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all charges etc.,
Supply and Erection of steel centering for sides and soffits including cost and conveyance of all materials to site and all labour charges etc., complete Below Sill
Supply and Erection of steel centering for sides and soffits including cost and conveyance of all materials to site and all labour charges etc., complete Above Sill
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges center
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Provision for Bitumen Pad
Provision for Name Board Cum Citizen Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.79 MB
PART1.pdf
Tender Documents • 0.74 MB
PART2.pdf
Tender Documents • 0.66 MB
BOQ_772531.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid