Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrQualified OLYMPIA PLATINA PLOT NO 33B SOUTH PHASE GUINDY CHENNAI 600032 | CHENNAI | CHENNAI | TAMIL NADU | 600032 | ₹3.1 Cr | L1 | Qualified MII |
| 2 | L2₹3.2 Cr+₹1.1 L (0.37%)Qualified 187 3 188 3 JIGANI INDUSTRIAL AREA JIGANI BANGALORE KARNATAKA 562106 | BENGALURU URBAN | KARNATAKA | 562106 | ₹3.2 Cr+₹1.1 L (0.37%) | L2 | Qualified MII |
| 3 | Disqualified SN 177 DHAIGUDE WADA AUNDH GAON AUNDH PUNE MAHARASHTRA 411007 | PUNE | MAHARASHTRA | 411007 | - | - | Disqualified MSE, Category: OBC |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
23 Apr 2025, 12:00 pmClosed
Cooling Distribution Unit rack based with primary and secondary connection kit
hose
flange etc.
Under floor Piping Work and connection to CDUs and Manifolds along with Grooved fittings etc.
Supply and Return Manifold 42U with 36 nodes each side
Cold Plate Pair Suitable for Intel Sapphire-Emerald Rapids. Along with Tube of appropriate length with Quick Disconnect Dripless connectors
Coolant for secondary network
Any other items -components required to complete the scope
Any other charges required to complete the DCLC Solutions in total.
Charges towards - Installation
commissioning
testing etc.
7654239
GEM/2025/B/6064881
Two Packet Bid
Cold Plate Pair Suitable for Intel Sapphire-Emerald Rapids.
84 days
Waman Sutar411008C-DAC C-DAC Innovation Park, Panchavati, Pashan
Total value wise evaluation
BOQ
8 documents required · 8 mandatory
3 yrs
₹3
10%
Exempted
24 Mar 2025
24 Mar 2025
23 Apr 2025
DCLC SOLUTIONS FOR HPC TESTBED CLUSTER CDAC PUNE
Cooling Distribution Unit rack based with primary and secondary connection kit
Under floor Piping Work and connection to CDUs and Manifolds along with Grooved fittings etc.
Supply and Return Manifold 42U with 36 nodes each side
Cold Plate Pair Suitable for Intel Sapphire-Emerald Rapids. Along with Tube of appropriate length with Quick Disconnect Dripless connectors
Coolant for secondary network
Any other items -components required to complete the scope
Any other charges required to complete the DCLC Solutions in total.
Charges towards - Installation
DCLC Solutions for integrating HPC Testbed Cluster
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7654239.pdf
GEM_BID
1742279858.xlsx
OTHER
IntePact_06515d60-17f4-4ba9-92201742280477598_bvinay.pdf
OTHER
ATC_430_830c171c-077f-4701-ba3f1742796989022_bvinay.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
catalog_2025-03-18-12-00-35_c4ae8d329fc08dded0e4788beccc5132.pdf
BOQ
boq_item_file_2025-03-18-12-00-35_2ad1ddbb7ff6d678ad6afa6bce56005c.csv.pdf
BOQ
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .