Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.9 LAdmitted-Finance GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | L1 | Admitted-Finance | ||
| 2 | L2₹19.0 L+₹8,569.06 (0.45%)Admitted-Finance GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | L2 | Admitted-Finance | ||
| 3 | L3₹19.0 L+₹9,330.76 (0.49%)Admitted-Finance GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical 24A LAJPAT NAGAR NEAR BUS STAND YAMUNA NAGAR | YAMUNANAGAR | HARYANA | 133103 | - | Rejected-Technical Dis qualify |
Tender Value
Refer Docs
EMD Value
₹38,085
Closing Date
27 Jun 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
ward no 47 mahatma jyotibafule nagar me estithi sarwjanik jamin (sulabh sauchalaya ke esthan) par park avn open gym ka adhisthan ka karya.
2026_DOLBU_1161210_1
FFC Ward 47 sn 51
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Nagar Nigam Gorakhpur
₹38,085
6 Oct 2026
17 Jun 2026
29 Jun 2026
17 Jun 2026
27 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Cleaning of site and cleaning of dismental material in all complete. | 30 | Day | 330 | ₹9,900 |
| 1.02 | Earth work in excavation in foul position soil lead 50mt.& lift 1.5 mt. incl. lab. T&P etc all complete. | 63.1 | Cum | 120 | ₹7,572 |
| 1.03 | P/L of base concrete in 1:6:12 with cement, L-Sand and 40mm S/B including mat. Lab. T&P,etc all complete. | 9.52 | Cum | 4,007 | ₹38,146.64 |
| 1.04 | M 150 class brick work in 1:4 with cement &approved Course Sand mortar including supply all material and S.I.N. labor etc. SIN 305A | 54.13 | Cum | 5,817 | ₹3,14,874.21 |
| 1.05 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I No-289) | 12.7 | Cum | 9,082 | ₹1,15,341.4 |
| 1.06 | M.S. (Tor steel or plain) in plain work such as R.C.C or R.B work Including bending for proper shape as necessary including bending for proper completion of the work and Including supply of all steel & wastage, bend, hooks, and authorised overlapping shall be measured. (S.I-504) | 11.96 | Qtl | 7,690 | ₹91,972.4 |
| 1.07 | P/F of M.S Grill work with fabrication required shape and size with all complete of work. | 2,121 | Kg | 80.64 | ₹1,71,037.44 |
| 1.08 | E/W filling with cartage upto 10km I distance including dreacsing lavaling etc. | 48.03 | Cum | 330.1 | ₹15,854.7 |
| 1.09 | S/L of GSB 53-9.5mm thick S/B upto 10 cm loose layer including etc all complete of work. | 14.64 | Cum | 3,134.25 | ₹45,885.42 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
BOQ_2176406.xls
BOQ • 0.33 MB
d.pdf
Tender Documents • 2.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .