| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | ₹9.4 L Quoted ₹12.1 L | L1 | Accepted-AOC Work Awarded vide this office letter No. 1652-57 dated 27-04-2026 |
| 2 | L2₹12.7 L+₹52,966.15 (4.36%)Rejected-Finance GOVT CONTRACTOR VILLAGE P O CHALWARA TEHSIL JAWALI DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | ₹12.7 L+₹52,966.15 (4.36%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹13.0 L+₹81,511.50 (6.71%)Rejected-Finance | ₹13.0 L+₹81,511.50 (6.71%) | L3 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | Raghunandan Singh L3 | Krishan Chand L1 | RAJESH SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in earth work and disposal of all excavated earth such as pick work, jumper work, blasting work in hard/soft rocks, including dewatering in saturated soil upto all leads and lifts disposed earth to be levelled and neately dressed within all leads and lifts as per the direction of Engineer-in-Charge | 392.5 | Cum | 680 ₹2,66,900 | 650 ₹2,55,125 Lowest | 660 ₹2,59,050 |
| 2.00 | Wire crate made of G 1. wire filled with boulders with square cut faces aginst the wire (wire crate to be measured and paid for separetaly) the weight of boulder should not be less than 18 kg each within all leads and lifts as per the direction of Engineer-in-Charge | 148.43 | Cum | 2,750 ₹4,08,182.5 | 2,600 ₹3,85,918 Lowest | 2,750 ₹4,08,182.5 |
| 3.00 | Wire crate made of G1 wire filled with boulders with square cut faces against the wire (boulder filling to be measured and paid for separetaly) G.I. wire 5mm thick corresponding to SWG-6. 15 cm x 15 cm mesh. The size of crate 1.25x1.25x1 25 metre within all leads and lifts as per the direction of Engineer-in-Charge | 890.63 | Sqm | 550 ₹4,89,846.5 | 500 ₹4,45,315 Lowest | 525 ₹4,67,580.75 |
| 4.00 | Providing and laying cement concrete 1:2:4 (1 cement 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundation footings bases of columns and mass concrete within all leads and lifts as per the direction of Engineer-in-Charge | 3.93 | Cum | 10,500 ₹41,265 | 10,000 ₹39,300 | 9,500 ₹37,335 Lowest |
| 5.00 | Extra for laying cement concrete in or under water including cost of pumping or bailing out water and lowering slush etc complete within all leads and lifts as per the direction of Engineer-in-Charge | 4 | Rmt | 15,900 ₹63,600 Lowest | 16,000 ₹64,000 | 17,000 ₹68,000 |
| 6.00 | Providing Tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-Charge | 275.1 | Kgs | 95 ₹26,134.5 | 90 ₹24,759 Lowest | 99 ₹27,234.9 |
| 7.00TERMS AND CONDITIONS. 1 ) The work shall be executed strictly in accordance with JSV/HPPWD/ARC and BIS satisfaction as per instructions of the Engineer-in-Charge 2) Nothing shall be paid to the contractor for rejected work/materials. 3 ) The payment to the labourers will be made in the presence of Junior Engineer concerned a representative of Engineer-in-Charge 4 ) The work shall be executed with in stipulated period 5 ) Silt free sand/stone aggregate of approved quarry shall be used 6) GST, Labour Cess and Security will be deducted from each bill of the contractor as per Govt rule 7) The following material required for execution of above work shall be supplied by the Department in Sub Divisional Store against proper indent on the rates (1) Cement Rs 475/- per bag (2) Tor steel 65.25-Per kg | ||||||
Tender Value
₹9.5 L
EMD Value
₹19,067
Closing Date
16 Apr 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVIISON CHOWARI
Restoration of rain damages to WSS Barla Trimble in tehsil Bhattiyat Distt Chamba HP SH Co Intake well
2026_HPIPH_133617_1
NIT NO 164-263 DATED 06-04-2026
Open Tender
Civil Works - Water Works
Item Rate
60 days
CHOWARI CHAMBA HP
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
EE CHOWARI
₹19,067
19 Aug 2026
8 Apr 2026
17 Apr 2026
8 Apr 2026
16 Apr 2026
8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in earth work and disposal of all excavated earth such as pick work, jumper work, blasting work in hard/soft rocks, including dewatering in saturated soil upto all leads and lifts disposed earth to be levelled and neately dressed within all leads and lifts as per the direction of Engineer-in-Charge | - | Cum | - | - |
| 2 | Wire crate made of G 1. wire filled with boulders with square cut faces aginst the wire (wire crate to be measured and paid for separetaly) the weight of boulder should not be less than 18 kg each within all leads and lifts as per the direction of Engineer-in-Charge | - | Cum | - | - |
| 3 | Wire crate made of G1 wire filled with boulders with square cut faces against the wire (boulder filling to be measured and paid for separetaly) G.I. wire 5mm thick corresponding to SWG-6. 15 cm x 15 cm mesh. The size of crate 1.25x1.25x1 25 metre within all leads and lifts as per the direction of Engineer-in-Charge | - | Sqm | - | - |
| 4 | Providing and laying cement concrete 1:2:4 (1 cement 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundation footings bases of columns and mass concrete within all leads and lifts as per the direction of Engineer-in-Charge | - | Cum | - | - |
| 5 | Extra for laying cement concrete in or under water including cost of pumping or bailing out water and lowering slush etc complete within all leads and lifts as per the direction of Engineer-in-Charge | - | Rmt | - | - |
| 6 | Providing Tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-Charge | - | Kgs | - | - |
| 7 | TERMS AND CONDITIONS.
1 ) The work shall be executed strictly in accordance with JSV/HPPWD/ARC and BIS satisfaction as per instructions of the Engineer-in-Charge
2) Nothing shall be paid to the contractor for rejected work/materials.
3 ) The payment to the labourers will be made in the presence of Junior Engineer concerned a representative of Engineer-in-Charge
4 ) The work shall be executed with in stipulated period
5 ) Silt free sand/stone aggregate of approved quarry shall be used
6) GST, Labour Cess and Security will be deducted from each bill of the contractor as per Govt rule
7) The following material required for execution of above work shall be supplied by the Department in Sub Divisional Store against proper indent on the rates (1) Cement Rs 475/- per bag (2) Tor steel 65.25-Per kg | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_197533.xls
BOQ • 0.28 MB
F68.pdf
Tender Documents • 2.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .