Tender Value
₹4.4 L
EMD Value
₹4,550
Closing Date
7 Sept 2026, 3:00 pm
Executive Engineer
Office of the Executive Engineer PWD Building C and M Division Erode
Special repairs to leaky roof, flooring, joineries and painting arrangements for Guard room and power room in Government Auto mobile work shop at Erode in Erode District.
2026_PWD_697429_1
NIT.05 2026 27 BCM DIVISION ERODE Dated 24.08.2026
Open Tender
Maintenance Works
Percentage
Erode
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹4,550
24 Aug 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and carefully stacking the materials useful for reuse of Pressed tiles & weathering course, etc., complete as per standard specification and as directed by the deparmental officers. | 30.5 | M2 | 51.66 | ₹1,575.63 |
| 2 | Clean removal of damaged Cement Plaster from walls as directed by the deparmental officers as standard specifications | 195.65 | M2 | 9.51 | ₹1,860.63 |
| 3 | Dismantling clearing away the damaged Brick Work in Cement Mortar of any thickness and carefully stacking materials useful for reuse etc., complete and as directed by the departmental officers. | 1.54 | M3 | 318.11 | ₹489.89 |
| 4 | Chipping of concrete & roughening the surface etc., complete as per standard specification and as directed by the deparmental officers. | 24.2 | M2 | 45.36 | ₹1,097.71 |
| 5 | Brick work in Cement Mortar 1:5 (one cement and five crushed stone sand) using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge.
For Superstructure in Ground Floor | 1.1 | M3 | 7,760.5 | ₹8,536.55 |
| 6 | Providing Polymer Coating (Water Proof Coating) for sunken Portion of toilet with following specification and the surface shall be cleaned to remove all dust, foreign, matters lose materials or any other deposits of contamination by rubbing with wire brush. Slurry: Dry blend and polymer liquid blend shall be mixed into the desired ratio as per recommendation of the supplier. The mix shall be stirred throughly until no bubbles remain in the mix. Any lumps found in mix shall be removed. Apply first coat of polymer modified cementitious slurry by brush on wet cleaned surface. After drying, second coat shall be applied on the first coat as directed by the departmental officers etc. The rate inclusive of cost of materials and labour, etc., complete complying with standard specification and as directed by the departmental officers. | 37.1 | M2 | 329 | ₹12,205.9 |
| 7 | Plastering with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 12mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including mortar plasticizer at 200ml per 50Kg of cement used, finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 45.2 | M2 | 320.45 | ₹14,484.34 |
| 8 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
For Superstructure in Ground Floor | 2.5 | M3 | 4,340.3 | ₹10,850.75 |
| 9 | Finishing the top of roof with one course of machine pressed tiles Using Pressed Tiles of 230mm x 230mm x 16 mm to 18mm approved quality set in Cement Mortar 1:3 (One Cement and Three crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 30.5 | M2 | 1,391 | ₹42,425.5 |
| 10 | Special Ceiling Plastering and finishing all the RCC exposed surfaces such as RCC slabs, sunshades, canopies, staircase steps, landing slabs etc., with cement mortar 1:3 (One cement and three Plastering sand) 10mm thick including hacking the surfaces and providing necessary cement mortar nosing beading as per standard size and specification wherever necessary using the same mix as directed by the departmental officers etc., complete complying with standard specification. | 28.9 | M2 | 345.15 | ₹9,974.84 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Tencon_Automobile.pdf
Tender Documents • 2.05 MB
BOQ_838432.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].