Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | -40.00% | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 LAdmitted-Finance | -38.10% | ₹1.9 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Residence Certificate attested by BDO not attached and Name of work on CDR is not mentioned |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
19 May 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Constt. of Culvert over the canal near H/O Baldev Singh at village Kothi Khour pyt. Khour Deonian Pyt. Khour Block Miran Sahib under CDF for the year 2026-27 (Block Level)
2026_RDPR_309803_1
e-NIT 30-REWJ of 2026-27 dated 12-05-2026 (2nd Call)
Open Tender
Civil Works
30 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹6,000
20 May 2026
12 May 2026
20 May 2026
12 May 2026
19 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | General site clearance including levelling of ground and disposal of material. (LS)& De -watering | 7 | sqm | 553 | ₹3,871 | BI01010001010000000000000515BI0100001113 |
| 2 | Earh Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 72.72 | cum | 479.3 | ₹34,854.7 | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 3.87 | cum | 4,826.5 | ₹18,678.56 | BI01010001010000000000000515BI0100001115 |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 28.14 | cum | 5,733.6 | ₹1,61,343.5 | BI01010001010000000000000515BI0100001116 |
| 5 | Boulders | 12.06 | cum | 937.9 | ₹11,311.07 | BI01010001010000000000000515BI0100001117 |
| 6 | Providing and laying in position Reinforced cement concrete 1 cement:1.5fine sand:3 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 2.4 | cum | 9,821.85 | ₹23,572.44 | BI01010001010000000000000515BI0100001118 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Cold twisted bars | 168 | kg | 123.2 | ₹20,697.6 | BI01010001010000000000000515BI0100001119 |
| 8 | Centring and shuttering including strutting, propping etc and removal of the formwork. | 42.8 | sqm | 286.35 | ₹12,255.78 | BI01010001010000000000000515BI0100001120 |
| 9 | Carriages of material by MT Sand 15 km | 8.62 | cum | 344.49 | ₹2,969.5 | BI01010001010000000000000515BI0100001121 |
| 10 | Carriages of material by MT Agg 15 km | 16.31 | cum | 344.49 | ₹5,618.63 | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_1002707.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid