Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC Low |
| 2 | L2₹2.1 LRejected-Finance | ₹2.1 L | L2 | Rejected-Finance High |
| 3 | L3₹2.1 LRejected-Finance | ₹2.1 L | L3 | Rejected-Finance High |
| 4 | L4₹2.4 LRejected-Finance | ₹2.4 L | L4 | Rejected-Finance High |
| 5 | L5₹2.5 LRejected-Finance | ₹2.5 L | L5 | Rejected-Finance High |
| Sl No | Description | Qty | Unit | NITHYA CONSTRUCTION L6 | B. karthick L3 | R Murugan L4 | sri sakthi enterprises L5 | MALATHI L1 | B Sabari Contractor L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Providing Flushing and Deepening in Existing Borewell Motor with Spls and Pipe Line for Thamarai Eri at Devigapuram Panchayat in West Arni Block of Tiruvannamalai District Vpt GF 2026-2027 | |||||||||
| 1.01 | Towards Geo physical survey charges | 1 | Cum | 2,501 ₹2,501 | 1,286 ₹1,286 Lowest | 2,498 ₹2,498 | 2,498 ₹2,498 | 1,920 ₹1,920 | 2,173 ₹2,173 |
| 1.02 | Drilling of 150mm dia Borewell Loose soil | 18 | Cum | 278 ₹5,004 | 154.36 ₹2,778.48 Lowest | 268 ₹4,824 | 270 ₹4,860 | 340 ₹6,120 | 200 ₹3,600 |
| 1.03 | Hard Soil | 102 | Cum | 299 ₹30,498 | 360.19 ₹36,739.38 | 295 ₹30,090 | 305 ₹31,110 | 396 ₹40,392 | 200 ₹20,400 Lowest |
| 1.04 | Towards cost of PVC casing pipe 150mm dia | 21 | Cum | 550 ₹11,550 | 728.96 ₹15,308.16 | 547 ₹11,487 | 548 ₹11,508 | 365 ₹7,665 Lowest | 650 ₹13,650 |
| 1.05Specials | |||||||||
| 1.06 | 5HP Motor | 1 | MT | 58,661 ₹58,661 | 36,876 ₹36,876 Lowest | 58,660 ₹58,660 | 58,660 ₹58,660 | 40,325 ₹40,325 | 45,000 ₹45,000 |
| 1.07 | Oil Setter | 6 | Cum | 3,500 ₹21,000 | 1,029.12 ₹6,174.72 | 3,500 ₹21,000 | 3,500 ₹21,000 | 400 ₹2,400 Lowest | 4,500 ₹27,000 |
| 1.08 | 63mm PVC Pipe 4 Ksc | 60 | Cum | 145 ₹8,700 | 240 ₹14,400 | 143 ₹8,580 | 150 ₹9,000 | 153 ₹9,180 | 81 ₹4,860 Lowest |
| 1.09 | 4.00 sqm cable Wire | 110 | Cum | 215 ₹23,650 | 120.88 ₹13,296.8 Lowest | 215 ₹23,650 | 218 ₹23,980 | 177.6 ₹19,536 | 220 ₹24,200 |
Tender Value
₹2.5 L
EMD Value
₹2,600
Closing Date
11 Aug 2026, 3:00 pmClosed
The Block Development Officer, West Arni
The Block Development Officer,V.Pt, West Arni
Providing Flushing and Deepening in Existing Borewell Motor with Spls and Pipe Line for Thamarai Eri at Devigapuram Panchayat in West Arni Block of Tiruvannamalai District Vpt GF 2026-2027
2026_RDTN_688912_1
Roc. No. A5/2348/2025 Dt. 03.07.2026
Open Tender
Civil Works
Lump-sum
180 days
West Arni
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,600
Yes
The Block Development Officer,V.Pt, West Arni
11 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing Flushing and Deepening in Existing Borewell Motor with Spls and Pipe Line for Thamarai Eri at Devigapuram Panchayat in West Arni Block of Tiruvannamalai District Vpt GF 2026-2027 | |||||
| 1.01 | Towards Geo physical survey charges | 1 | Cum | 1.25 | ₹1.25 |
| 1.02 | Drilling of 150mm dia Borewell Loose soil | 18 | Cum | - | - |
| 1.03 | Hard Soil | 102 | Cum | 100 | ₹10,200 |
| 1.04 | Towards cost of PVC casing pipe 150mm dia | 21 | Cum | 53 | ₹1,113 |
| 1.05 | Specials | - | - | - | - |
| 1.06 | 5HP Motor | 1 | MT | 11 | ₹11 |
| 1.07 | Oil Setter | 6 | Cum | 1.25 | ₹7.5 |
| 1.08 | 63mm PVC Pipe 4 Ksc | 60 | Cum | - | - |
| 1.09 | 4.00 sqm cable Wire | 110 | Cum | 100 | ₹11,000 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tenderdocument.pdf
Tender Documents • 0.88 MB
BOQ_828120.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].