Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 CrAccepted-AOC | ₹9.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹9.3 Cr+₹7.2 L (0.78%)Rejected-AOC ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹9.3 Cr+₹7.2 L (0.78%) | L2 | Rejected-AOC L2 |
| 3 | L3₹9.3 Cr+₹8.8 L (0.95%)Rejected-AOC B 104 KESAR GARDEN APARTMENT SECTOR 48 NOIDA GAUTAM BUDDH NAGAR | NOIDA | GAUTAM BUDDH NAGAR | UTTAR PRADESH | ₹9.3 Cr+₹8.8 L (0.95%) | L3 | Rejected-AOC L3 |
| 4 | L4₹9.3 Cr+₹10.3 L (1.12%)Rejected-AOC KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹9.3 Cr+₹10.3 L (1.12%) | L4 | Rejected-AOC L4 |
| 5 | L5₹9.4 Cr+₹17.5 L (1.91%)Rejected-AOC 0 BARAGOAN JANGIGANJ BHADOHI SANT RAVIDAS NAGAR UTTAR PRADESH 221310 | BHADOHI | UTTAR PRADESH | 221310 | ₹9.4 Cr+₹17.5 L (1.91%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | UMESH CHANDRA MISHRA L3 | BHAMAR SINGH L2 | Durga Engineers and Earth Movers L4 | SHRI SAI CONSTRUCTION L5 | M/S SATT SAHIB CONSTRUCTION CO L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Supplying and placing HDPE gabion case size (1.8m x 1.2m x 0.50 m ) filled HDPE bag (new cement size bag,48cmx75cm) with ganaga sand sewing, placing in position i/c all cost of material , labour, T & P and exculing all taxes etc. complete. | 26,768 | Nos | 2,156.85 ₹5,77,34,560.8 | 2,153.25 ₹5,76,38,196 | 2,160.54 ₹5,78,33,334.72 | 2,177.25 ₹5,82,80,628 | 1,978 ₹5,29,47,104 Lowest |
| 2.00 | Supplying and placing HDPE gabion case size (1.8m x 1.2m x 0.50 m ) filled geo bag with ganaga sand sewing, placing in position i/c all cost of material , labour, T & P and exculing all taxes etc. complete. Per No. | 1,740 | Nos | 2,809.61 ₹48,88,721.4 | 2,804.92 ₹48,80,560.8 Lowest | 2,814.3 ₹48,96,882 | 2,836.19 ₹49,34,970.6 | 3,126 ₹54,39,240 |
| 3.00 | Collection and laying Local sand as cushion above Geo fillter i/c levelling , dressing , labour, all T&P etc. complete.Per Cum | 1,343 | Cum | 174.31 ₹2,34,098.33 | 174.02 ₹2,33,708.86 Lowest | 174.64 ₹2,34,541.52 | 175.96 ₹2,36,314.28 | 193 ₹2,59,199 |
| 4.00 | Supplying and laying 400 GSM Geotextile sheet i/c all cost of material , labour , T & P etc. complete. | 8,956.86 | Sqm | 107.82 ₹9,65,728.65 | 107.64 ₹9,64,116.41 Lowest | 108 ₹9,67,340.88 | 108.84 ₹9,74,864.64 | 114 ₹10,21,082.04 |
| 5.00 | Supplying and laying boulder pitching 20-40 kg wt. including all cost of material , labour , T & P etc. complete. Per Cum | 2,472.17 | Cum | 2,375.89 ₹58,73,603.98 | 2,371.93 ₹58,63,814.19 Lowest | 2,379.85 ₹58,83,393.78 | 2,398.37 ₹59,29,178.36 | 2,644 ₹65,36,417.48 |
| 6.00 | Supply of G.I. wire crate of size 1500 X 1500 X 600 mm of 10 S.W.G. wire double knot 120 X 100 mm mesh mechanically woven double twisted hexagnal shape including cost of G.I. wire crate , Boulder stone , labour , T & P etc. complete. Per No. | 5,064 | Nos | 4,579.95 ₹2,31,92,866.8 | 4,572.31 ₹2,31,54,177.84 Lowest | 4,587.6 ₹2,32,31,606.4 | 4,623.28 ₹2,34,12,289.92 | 5,097 ₹2,58,11,208 |
Tender Value
₹10.3 Cr
EMD Value
₹20.7 L
Closing Date
16 Mar 2026, 12:00 pmClosed
SE MGCCC-1, MEERUT
Office Of SE MGCCC-1, MEERUT
LOT-01
2026_UPIDC_1122103_1
07/SE/MRT/2025-26
Open Tender
Civil Works
Item Rate
BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹20.7 L
7 Apr 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
Supplying and placing HDPE gabion case size (1.8m x 1.2m x 0.50 m ) filled HDPE bag (new cement size bag,48cmx75cm) with ganaga sand sewing, placing in position i/c all cost of material , labour, T & P and exculing all taxes etc. complete.
Supplying and placing HDPE gabion case size (1.8m x 1.2m x 0.50 m ) filled geo bag with ganaga sand sewing, placing in position i/c all cost of material , labour, T & P and exculing all taxes etc. complete. Per No.
Collection and laying Local sand as cushion above Geo fillter i/c levelling , dressing , labour, all T&P etc. complete.Per Cum
Supplying and laying 400 GSM Geotextile sheet i/c all cost of material , labour , T & P etc. complete.
Supplying and laying boulder pitching 20-40 kg wt. including all cost of material , labour , T & P etc. complete. Per Cum
Supply of G.I. wire crate of size 1500 X 1500 X 600 mm of 10 S.W.G. wire double knot 120 X 100 mm mesh mechanically woven double twisted hexagnal shape including cost of G.I. wire crate , Boulder stone , labour , T & P etc. complete. Per No.
stage.html
html • 0.05 MB
technical_2088986.pdf
techsummary_2088986.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
TDNIT07SELOT1.pdf
Tender Documents • 1.34 MB
BOQ_2088986.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .