Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAccepted-Finance | ₹26.1 L | L1 | Accepted-Finance LOWEST RATE ACEEPTED |
| 2 | L2₹26.2 LRejected-Finance | ₹26.2 L | L2 | Rejected-Finance SECOND LOWEST |
| 3 | Not Admitted-Fee/PreQual/Technical GRAM POST HIGUATARGADH JANPAD CHANDOLI | PARBHANI | MAHARASHTRA | 431401 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical NONE | NEW DELHI | DELHI | 110001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Nirmala Singh | M/S AWADH CONSTRUCTION |
|---|---|---|---|---|---|
| 1.00C.C. Lining work | |||||
| 1.01 | Bed Scrapping of Internal section of Main Canal with Including All Material Labour T & P Complete in all respect | 1,944 | M2 | 14,094 ₹14,094 | 14,094 ₹14,094 |
| 1.02 | Preparation of Subgrade for lining Work with Including All Material Labour T & P Complete in all respect | 1,944 | M2 | 33,048 ₹33,048 | 33,048 ₹33,048 |
| 1.03 | Earth Work in digging foundation with Including All Material Labour T & P Complete in all respect | 297 | M3 | 29,700 ₹29,700 | 29,700 ₹29,700 |
| 1.04 | Sand filling in foundation with Including All Material Labour T & P Complete in all respect | 189 | M3 | 1,89,000 ₹1.9 L | 1,89,378 ₹1.9 L |
| 1.05 | Centring and shuttering for cc work with Including All Material Labour T & P Complete in all respect | 308.88 | M2 | 2,22,702.48 ₹2.2 L | 2,26,100.16 ₹2.3 L |
| 1.06 | CC work 1:2:4 (10-20mm stone grit) in bed slope and toe wall with Including All Material Labour T & P Complete in all respect | 208.44 | M3 | 17,07,332.04 ₹17.1 L | 17,07,332.04 ₹17.1 L |
| 1.07 | Floating Neat Cement with Including All Material Labour T & P Complete in all respect | 1,944 | M2 | 2,29,392 ₹2.3 L | 2,23,560 ₹2.2 L |
| 1.08 | Earth Work in back filling in required canal section area with Including All Material Labour T & P Complete in all respect | 10.8 | M3 | 302.4 ₹302.40 | 270 ₹270 |
| 1.09 | Laying LDPE polythene under plaster with Including All Material Labour T & P Complete in all respect | 1,944 | M2 | 1,61,352 ₹1.6 L | 1,55,520 ₹1.6 L |
Tender Value
₹26.3 L
EMD Value
₹53,000
Closing Date
8 Oct 2025, 5:00 pmClosed
Executive Engineer Minor Lift Canal Division Jnp
Executive Engineer Minor Lift Canal Division Jaunpur
C.C. Lining in main canal reach 2.730 Km. to 3.000 at Mothaha Pump canal.
2025_UPIDM_1074619_2
03/E.E./2025-26(LOT-01)
Open Tender
Civil Works
40 days
Executive Engineer Minor Lift Canal Division Jnp
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹53,000
9 Dec 2025
22 Sept 2025
9 Oct 2025
22 Sept 2025
8 Oct 2025
22 Sept 2025
C.C. Lining work
Bed Scrapping of Internal section of Main Canal with Including All Material Labour T & P Complete in all respect
Preparation of Subgrade for lining Work with Including All Material Labour T & P Complete in all respect
Earth Work in digging foundation with Including All Material Labour T & P Complete in all respect
Sand filling in foundation with Including All Material Labour T & P Complete in all respect
Centring and shuttering for cc work with Including All Material Labour T & P Complete in all respect
CC work 1:2:4 (10-20mm stone grit) in bed slope and toe wall with Including All Material Labour T & P Complete in all respect
Floating Neat Cement with Including All Material Labour T & P Complete in all respect
Earth Work in back filling in required canal section area with Including All Material Labour T & P Complete in all respect
Laying LDPE polythene under plaster with Including All Material Labour T & P Complete in all respect
Filling construction joint by max fault 43% coarse sand 55% asbestes powder 2%including cost of labour and T&P
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid