Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr Quoted ₹1.3 Cr | L1 | Accepted-AOC The lowest and negotiated bidder M/s.Venkatesha Perumal Construction,Salem is accepted by the Chief Engineer PWD,Coimbatore Region, Coimbatore Letter No.HDO/DB/F.11(SLM)/ 2025/dt.28.10.2025 |
| 2 | L2₹1.3 Cr+₹2.4 L (1.90%)Rejected-AOC THARAMANGALAM OMALUR T K SALEM | SALEM | TAMIL NADU | 621011 | ₹1.3 Cr+₹2.4 L (1.90%) | L2 | Rejected-AOC Other than lowest tenderer |
| 3 | L3₹1.3 Cr+₹4.4 L (3.48%)Rejected-AOC NO 5 2 1ST STREET DHARMA NAGAR SURAMANGALAM SALEM DISTRICT 636005 | SALEM | SALEM | TAMIL NADU | 636005 | ₹1.3 Cr+₹4.4 L (3.48%) | L3 | Rejected-AOC Other than lowest tenderer |
| Sl No | Description | Qty | Unit | I.S AND CO L2 | Venkatesha Perumal Construction Company L1 | M/s SREE S.K & CO L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for Reinforced Cement concrete etc., complete complying with standard specifications | 54.9 | M3 | 5,083 ₹2,79,056.7 | 4,986 ₹2,73,731.4 Lowest | 5,156 ₹2,83,064.4 |
| 2.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for Brick masonry in cement mortar walls under 3m high etc., complete complying with standard specifications | 72.1 | M3 | 336 ₹24,225.6 | 329 ₹23,720.9 Lowest | 341 ₹24,586.1 |
| 3.00 | Dismantling Doors & windows including removal of frames, hinges and fastenings etc., complete complying with standard specifications | 64.9 | M2 | 181 ₹11,746.9 | 178 ₹11,552.2 Lowest | 184 ₹11,941.6 |
| 4.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. | 483 | M3 | 387 ₹1,86,921 | 380 ₹1,83,540 Lowest | 394 ₹1,90,302 |
| 5.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 31 | M3 | 5,798 ₹1,79,738 | 5,687 ₹1,76,297 Lowest | 5,881 ₹1,82,311 |
| 6.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 103 | M3 | 1,908 ₹1,96,524 | 1,872 ₹1,92,816 Lowest | 1,936 ₹1,99,408 |
| 7.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 213 | M3 | 517 ₹1,10,121 | 507 ₹1,07,991 Lowest | 525 ₹1,11,825 |
| 8.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental
officers. | 101 | M3 | 171 ₹17,271 | 167 ₹16,867 Lowest | 174 ₹17,574 |
| 9.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by mechanical means | 44 | M3 | 5,798 ₹2,55,112 | 5,687 ₹2,50,228 Lowest | 5,881 ₹2,58,764 |
| 10.00 | Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge.-For foundation & basement, Cement Mortar 1:5 | 93 | M3 | 8,128 ₹7,55,904 | 7,973 ₹7,41,489 Lowest | 8,255 ₹7,67,715 |
Tender Value
₹1.2 Cr
EMD Value
₹72,000
Closing Date
22 Oct 2025, 3:00 pmClosed
The Superintending Engineer PWD
Buildings C and M Circle Salem
Reconstruction of class room and laboratory buildings in Government Industrial Training Institute campus at Salem in Salem District (Retender)
2025_PWD_614665_1
30/2025-26
Open Tender
Civil Works - Buildings
Lump-sum
180 days
Gorimedu
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹72,000
17 Nov 2025
16 Oct 2025
22 Oct 2025
16 Oct 2025
22 Oct 2025
16 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_734411.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
ReconstructionITIsalemcondition.pdf
Tender Documents • 0.72 MB
BOQ_734411.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .