Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.2 CrAccepted-AOC PLOT NO 33 34 SAINAGAR NAGOLE HYDERABAD 500 068 | MEDCHAL MALKAJGIRI | TELANGANA | 500068 | ₹29.2 Cr Quoted ₹29.3 Cr | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹30.4 CrRejected-AOC | ₹30.4 Cr | L2 | Rejected-AOC NOT BEING LOWEST |
| 3 | L3₹30.9 CrRejected-AOC | ₹30.9 Cr | L3 | Rejected-AOC NOT BEING LOWEST |
| 4 | L4₹33.1 CrRejected-AOC | ₹33.1 Cr | L4 | Rejected-AOC NOT BEING LOWEST |
| 5 | L5₹33.6 CrRejected-AOC | ₹33.6 Cr | L5 | Rejected-AOC NOT BEING LOWEST |
Tender Value
₹28.5 Cr
EMD Value
₹15 L
Closing Date
18 Nov 2021, 6:00 pmClosed
CHIEF ENGINEER CHENNAI ZONE
CHIEF ENGINEER CHENNAI ZONE ISLAND GROUNDS CHENNAI 600 009
PROVISION OF DEFICIENT MARRIED ACCN (48 MAJ AND ABOVE) FOR PARTICIPANT OFFICERS AT CDM SECUNDERABAD
2021_MES_477944_1
89038/E8
Open Tender
Civil Works
760 days
SECUNDERABAD
As per Appendix A of NIT
8 documents required · 8 mandatory
₹3,000
Garrison Engineer (North) Secunderabad
₹15 L
Yes
10 Dec 2021
28 Sept 2021
20 Nov 2021
28 Sept 2021
18 Nov 2021
13 Nov 2021
29 Sept 2021 - 18 Oct 2021
Amount
Lumpsum price worked out by the tenderer for BUILDINGS / STRUCTURES as listed in Schedule ‘A’ Part-I
Lumpsum price worked out by the tenderer for SITE CLEARANCE AND DEVELOPMENTS as listed in Schedule ‘A’ Part-II
Lumpsum price worked out by the tenderer for INTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-III
Lumpsum price worked out by the tenderer for INTERNAL ELECTRIC SUPPLY as listed in Schedule ‘A’ Part-IV
Lumpsum price worked out by the tenderer for PROTECTIVE WORK/ RETAINING WALL as listed in Schedule ‘A’ Part-V
Lumpsum price worked out by the tenderer for ROAD / PATH / CULVERT as listed in Schedule ‘A’ Part-VI
Lumpsum price worked out by the tenderer for SEWAGE DISPOSAL as listed in Schedule ‘A’ Part-VII
Lumpsum price worked out by the tenderer for AREA DRAINAGE as listed in Schedule ‘A’ Part-VIII
Lumpsum price worked out by the tenderer for COMPOUND WALL, FENCING AND GATE as listed in Schedule ‘A’ Part-IX
Lumpsum price worked out by the tenderer for RAIN WATER HARVESTING as listed in Schedule ‘A’ Part-X
Lumpsum price worked out by the tenderer for EXTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-XI
Lumpsum price worked out by the tenderer for EXTERNAL ELECTRIC SUPPLY as listed in Schedule ‘A’ Part-XII
Lumpsum price worked out by the tenderer for FIRE FIGHTING SYSTEM as listed in Schedule ‘A’ Part-XIII
Lumpsum price worked out by the tenderer for LIFTS as listed in Schedule ‘A’ Part-XIV
SCHEDULE 'A' PART XV (D G SETS) Note: This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only.
Supply, install, testing and commissioning of 100 KVA/ 80KW, silent Diesel engine Generating Set, 415 volts, 3 phase, 0.8 Power factor, 50 Hz, 4 wire system as per IS 10001/10002 comprising of 100 KVA Generator, developing 156 BHP @ 1500 RPM, Liquid Cooled, electric start coupled to alternator as per IS 13364 mounted on a common base frame with standard control panel for automatic starting on main control panel having meters, sound proof canopy, integral fuel tank with battery and leads and accessories complete in all respect with CPCB approved acoustic enclosure suitable for ambient condition at Secunderabad including required PCC foundation as per manufacturers instruction and confirming to conditions under IS 10004722/1460 BS 5514/2613/ 5000 ISO 8526/3046 complete all as per Srl Item No.1 of Sch 'A' Part- XV (D G SETS)
Supply, installation, testing and commissioning of 62.5 KVA/ 50 KW, (The capacity of Generator set shall be net after all due derating factors as per relevant lSI standard), silent Diesel engine Generating Set, 415 volts, 3 phase, 0.8 Power factor, 50 Hz, 4 wire system as per IS 10001/10002 comprising of 62.5 KVA DG Set, developing 83 BHP @ 1500 RPM, Liquid Cooled, electric start coupled to alternator as per IS 13364 mounted on a common base frame with standard control panel for automatic starting on main control panel having meters, sound proof canopy, integral fuel tank with battery and leads and accessories complete in all respect with CPCB approved acoustic enclosure suitable for ambient condition at Secunderabad including required PCC foundation as per manufacturers instruction and confirming to conditions under IS 10004722/1460 BS 5514/2613/ 5000 ISO 8526/3046 complete all as per Srl Item No.2 of Sch 'A' Part- XV (D G SETS)
SCHEDULE 'A' PART XVI (SEWAGE TREATMENT PLANT) Note: This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only.
Design, Supply, Construction, testing and commissioning of Sewage Treatment Plant (STP) based on principle of aerobic attached growth non -clogging randomomnly Moving Bed Bio Reactor (MBBR) technology having capacity of 80 KLD including all civil works and Primary, Secondary & tertiary treatment for STP with permanent specification with RMC M-30 Grade, Design mix concrete, consisting bar screen chamber, oil and grease remover, equalization tank, Anoxic tank, feed pumps, Moving Bed Bio Reactor(s) MBBR tank-1, reactor (MBBRTANK-2, MBBR TANK- 3), Recirculation tank, tube settler tank and clarified water tank, Chlorine dozing system, chlorine contact tank, Treated water tank, Sewage collection chamber and shed, Foundation for all E/M equipments, associated piping work with required valves, gates, drain, pathway, RCC filter tank, RCC treated water tank and Sludge drying bed open, similar in construction and working to rapid sand filter and Sludge collection tank
open RCC structure, M-30 all as specified and as per manufacturer's instruction including electrical control panels with inter connecting cable, spare parts for 5 years of operation and maintenance etc. complete as turnkey job with all involved Civil, Electrical, Digital and Mechanical works as per detailed specifications for Civil, Electrical and Mechanical components complete all as per manufacturer's instructions and as directed. all as per Srl Item No.1 of Sch 'A' Part- XVI (SEWAGE TREATMENT PLANT)
SCHEDULE 'A' PART XVII (MISCELLANEOUS ITEMS) Note: This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only.
INTERNAL ELECTRIC SUPPLY
Supply and Fix Telephone socket modular type RJ11 (01 module) all as per Cat No. 6772 62 of Legrand or techno-commercially equivalent of other specified makes etc., complete all as specified and as directed.
Supply and Fix TV CO-Axial socket outlet modular type, 01 Module all as per Cat No.6772 60 of Legrand or techno-commercially equivalent of other specified makes etc., complete all as specified and as directed.
Supply, fix, test and commissioning of Energy efficient LED light fitting surface and wall mounted LED batten 20 to 22 Watts, 4 Feet, extruded aluminium housing provided for efficient heat dissipation with polycarbonate diffuser & integrated electronic driver complete with all fixing arrangement suitable for operating voltage 100 to 270 Volts, prewired with all accessories, complete all as per Cat No.BN021C LED22S PSU CW GR of Philips or Techno Commercial equivalent of other specified makes fixed on surfaces of wall or ceiling and connecting of flexible copper conductor cable twin core of suitable size from ceiling rose to fitting drawn through and including flexible conduit, fixed with suitable mounting clamps etc., complete all as specified and as directed.
Supply, fix, test and commissioning of Energy efficient LED light fitting surface and wall mounted LED batten 10 to 12 Watts, 2 Feet, extruded aluminium housing provided for efficient heat dissipation with polycarbonate diffuser & integrated electronic driver complete with all fixing arrangement suitable for operating voltage 100 to 270 Volts, prewired with all accessories, complete all as per Cat No.BN 021 LED12S 6500 PSU GR of Philips or Techno Commercial equivalent of other specified makes fixed on surfaces of wall or ceiling and connecting of flexible copper conductor cable twin core of suitable size from ceiling rose to fitting drawn through and including flexible conduit, fixed with suitable mounting clamps etc., complete all as specified and as directed.
Supply, fix, test and commissioning of Decorative wall mounting fixture of 09 Watts in durable plastic body and designer mesh in gold finish suitable for 9 W LED lamp complete with all accessories all as per Cat No.LHFOECE1TZ1B014 of Havells or techno-commercially equivalent of other specified makes connecting up with and including twin/three core twisted flexible copper conductor cable of suitable size etc., complete all as specified and as directed.
Supply, fix, test and commissioning of LED street light luminaires, outdoor type 30Watts energy saving and environmental friendly long life LED street light made up of pressure die cast aluminium housing with high power led as lighting source and lens embedded PC cover having IP65 protection and impact resistance of IK07 with 10KV Built-in surge protection device suitable for pole dia Ø 43 mm (max.) all as per Cat No BRP046 LED 30 CW of Philips or Techno Commercial equivalent of other specified makes connecting with PVC insulated three core flexible copper conductor of suitable size from ceiling rose to fitting including bracket, complete all as specified and as directed.
Supply, fabricate and installation of GI pipe bracket made out of medium grade GI tubing of 40mm bore of length 1.50metre bent to shape 120 degree by hot forgoing after filling of sand and fixed on pole / wall with 2 Nos of MS clamps made out 25 x 4mm Flat Iron of required length including bolts, nuts and washers etc., and painting with two coats of silver metallic paint over a coat of red oxide primer etc., complete all as specified and as directed.
Supply, fix, connecting and testing of MCCB, 4 pole, 63 Amp with ultimate breaking capacity Icu-25kA at 415 Volts and adjustable thermal magnetic release conforming to IEC 60947 -2/IS-13947-Part-I with breaking capacity Ics=100%Icu at 415 Volts of 25 KA, overload setting 70% to 100%, short circuit setting 5 to 10 times all as per Cat No. IHDA6OBF0063 of Havells or techno-commercially equivalent of other specified makes complete all as specified and as directed.
Supply, fix, connecting and testing of MCCB, 4 pole, 40Amp with ultimate breaking capacity Icu-25kA at 415 Volts and adjustable thermal magnetic release conforming to IEC 60947 -2/IS-13947-Part-I with breaking capacity Ics=100%Icu at 415 Volts of 25 KA, overload setting 70% to 100%, short circuit setting 5 to 10 times all as per Cat No. IHDA6OBF0040 of Havells or techno-commercially equivalent of other specified makes complete all as specified and as directed.
Supply, fix, test and commissioning of Slim profile surface mounted down light , Fancy type of 15 Watts including LED lamp complete with all accessories all as per Cat No.SM251C LED16S- 6500 PSU WH of Philips or techno-commercially equivalent of other specified makes connecting up with and including twin/three core twisted flexible copper conductor cable of suitable size etc., complete all as specified and as directed.
ROAD / PATH / CULVERT
Supply and Fix road studs of size 110mm x 128mm x 29.5mm, weight. 248 gms (appx) made out of ABS Engineering plastic, dynamically designed having high impact strength all as per Dark Eye model No. DA-971-P or equivalent of other specified makes and fitted with 2 Nos. highly reflective reflectors on both sides, fixed with epoxy on bituminous /concrete surfaces complete all as specified and as directed.
Supply and Fix rubber based speed bumps of dimensions 500x400x75mm with reflective arrow stickers on both side with combination of approved colours (Black and Yellow) fixed with necessary bolts etc. complete all as specified and as directed.
Supply and Fix Polycarbonate round shaped Convex Mirrors of size 600mm dia, 1.5mm thick, light weight, single piece polycarbonate lense used for greater damage resistance, good finished, ideal for usage Blind Spots, Parking roads, by lanes and crossing roads and Body is made of ABS/Fiber/Plastic red in colour, with adjustable fixing brackets, nuts & bolts including Mounting Hardware MS Pipe painted with two coats of Ist quality synthetic enamel of tint black & white paint over a coat of red oxide primer and embedding in PCC (1:2:4) type B-1, blocks of size 60cm x 60cm x 75cm etc., complete all as specified and as directed. Note: The unit rate quoted shall be deemed to include the cost of excavation in post hole of any kind of soil/hard surface and making good the disturbed surfaces.
Supply and Fix road sign boards comprising of 1 plates of size 1200mm x 900mm fixed, one above the another, made of 2mm thick aluminium sheet duly framed in 40 x 40mm square MS pipe of 16 gauge and provided with 25mm x 25mm hold fasts, fixed with aluminium rivets and supported with bolts over a pair of legs made of MS square tubes 75mm x 75mm of 16 gauge sheet of length (height) 11' each painted with two coats of synthetic enamel paint of tint black & white over a coat of red oxide primer (Pegged sign boards fully reflective) above ground including embedding in PCC (1:2:4) type B-1, blocks of size 60cm x 60cm x 75cm and writing on both sides indicating the direction with single arrow on each plate with computer cut letters and signs (Reflective) as directed of appropriate size in white colours and 12mm reflective boarder all round the plates over retro reflective sheeting of Avery Dennison HIP base blue complete all as specified and as directed.
Note: The unit rate quoted shall be deemed to include the cost of excavation in post hole of any kind of soil/hard surface and making good the disturbed surfaces.
Manufacturing, supplying and fixing retro reflective Cautionary /warning sign boards of equilateral triangular shape having each side of 600mm made out of Type-IV of ASTMD-4956-09 High intensity prismatic Retro reflective sheeting and confirming to IRC 67: 2012 for full background of white colour letters/ logos done by screen printing in black colour borders by screen printing in red colour and fixed over 3mm thick aluminium composite material (ACM) sheet having minimum 0.30mm thick aluminium skin on both sides with back side painted grey colour and fixed over back support frame of MS angle 25x25x3mm alround and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear
height of not less than 2.1M from the ground level to the bottom of the board. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint black and white colour with bands of 30cm height. The sign post shall be firmly fixed with MS base angle 35x35x4mm in to the ground by M-15 concrete foundation of size 450x450x600mm including cost and conveyance of all materials, equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by the Engineer-in-Charge. Note: The unit rate quoted shall be deemed to include the cost of excavation in post hole of any kind of soil/hard surface and making good the disturbed surfaces.
COMPOUND WALL, FENCING AND GATE
Material and labour for Providing and fixing punched type Concertina Coil with 80 spiral turns in each 9 mtr of recommended stretched (laid) length, effective dia exceeding 450mm but not exceeding 600mm (after laying) with central core wire high tensile galvanised spring core wire (HTGS) made up of 2.6 mm dia as per IS: 4454, Part-1, Grade-II having minimum galvanizing of 230 – 250 gms per sqm, with a tape of razor sharp barbs strip of 0.5 mm thick and 19 mm width conforming to IS: 513 DD, barbs punched along the length at regular interval of 120 barbs per running meter, crimped with 4 to 5 Nos. of clips per each spire made up of Stainless Steel (SS-304) including fixing of concertina coil on top of wall in between 'Y' shape angle iron post and secured with necessary binding wire, u-nails / split pin, etc., complete all as specified and as directed.
Note for item No.20.01: (i) Weight per RM of concertina coil as laid shall be assessed by Board of Officers (ii) "Y" shape angle iron post shall be measured and paid separately. (iii) The unit rate quoted shall be deemed to be include the cost of binding wire, U-nails, pins etc,
EXTERNAL WATER SUPPLY
Supply, lay and testing Ductile Iron pressure pipes of size 150mm bore with spigot & socket ends, cast special, class K7 conforming to IS 8329 with inside surface of centrifugally cast cement mortar lined and outside with zinc coating suitable for tyton joint (Push-on joint) in any length laid to level or to falls in trenches/ on grounds / on supports including DI specials as required at site and jointing with flexible push-on type gasket of electrometric (EPDM) joining materials conforming to IS:5382 and making good for disturbed surfaces of roads, path ways etc while laying the pipe line at site, site clearance for the route of pipe line, welding, cutting the existing CI/DI/MS pipe line of any size up to 400 mm dia for inserting branch connections etc complete all as specified.
Supply, lay and testing Ductile Iron pressure pipes of size 100mm bore with spigot & socket ends, cast special, class K7 conforming to IS 8329 with inside surface of centrifugally cast cement mortar lined and outside with zinc coating suitable for tyton joint (Push-on joint) in any length laid to level or to falls in trenches/ on grounds / on supports including DI specials as required at site and jointing with flexible push-on type gasket of electrometric (EPDM) joining materials conforming to IS:5382 and making good for disturbed surfaces of roads, path ways etc while laying the pipe line at site, site clearance for the route of pipe line, welding, cutting the existing CI/DI/MS pipe line of any size up to 400 mm dia for inserting branch connections etc complete all as specified.
Note for items No.21.01 & 21.02 (a) The unit rate quoted shall be deemed to include the cost of push-on type gasket joints. (b) Excavation and earthwork, Returning, filling in and removal of soil shall be measured and paid separately under relevant items. (c) Lead Joints, D-Joints and DI Specials will be measured and paid separately. (d) The contractor is responsible for obtaining the approval from Police Department for Traffic Diversion and related works if required in consultation with the MES department. (e) Contractor is responsible for repair/ replacement of Under Ground HT/LT/OFC Cables etc and making good of any damages to the existing structures, during the course of execution.
Supply and fix Ductile Iron specials and fittings such as bends (any type, radius and angle) tapers any type, (straight, bend, increasing, decreasing or double socket etc) tee pieces, single branch. "Y junction, double branch, cross (all sockets or socket and spigot) collars, caps and plugs conforming to IS 9523:2000 suitable for DI pipes of flanged/socket ends of sizes 100mm bore to 200 mm bore complete all as specified and directed.
Supply and fix Cast Iron Air release valve of size 80mm bore, both ends flanged with stainless steel float with all accessories confirming to IS:14845 and ISI marked, type PN 1.0, Cast Iron body including suitable rubber gasket joints with suitable bolts, nuts and washers etc., jointing and testing complete all as specified and as directed.
Supply and fix foot valve of size 100mm swing type operation with rubber seat conforming to IS:4038 complete all as specified and as directed.
Supply, Install, testing and commissioning of horizontal mounted monoblock centrifugal pump set, electric operated with energy efficient motor conforming to IS:12615, shaft made of carbon steel having discharge capacity 1150 LPM at 36m head, 3000RPM, 415 volt, 50 Hz 3phase AC supply, comprising of motor & pump with CI/Noryl impeller, motor body, suction and delivery casing made cast iron, inbuilt strainer, sealing arrangement, Gland packing, fan cooled with suitable capacity, designed for automatic air release during priming, dynamically balanced rotating parts ensuring minimum vibration during running, gland packed/suction & delivery pipe size 100x100mm all as per Cat No.MBS15.2 of Crompton or techno-commercially equivalent of other specified
make, including provision of PCC foundation of suitable size with necessary base plate for pump set using angle iron of suitable size for base and frame supported by anti vibration pads as required at site including foundation bolts of suitable dia and length including electrical connections from starter to motor, necessary civil works & PCC works complete to with stand the vibrations all as per manufacturer's instructions and motor covering hood of hard plastic for protection from rain, making inlet/outlet pipes line connection using nuts, bolts, gaskets, pressure gauge etc., and other required material for smooth function of pump sets complete all as specified and directed.
Construction of valve chamber of internal size 1000 x 1000 x 1000mm including necessary earth work excavation, 100mm thick PCC 1:4:8, type D2 using 40mm graded stone aggregate in foundation with 100mm offset, 200mm thick PCC solid block masonry walls built in CM 1:6, PCC 1:2:4 type B1 for coping, 15mm thick rendering in CM 1:4 for internal surfaces and external plaster up to a depth of 15cm below GL, including provision of 3.0mm thick MS sheet cover, double door, welded to 50 mm x 50 mm x 6mm MS angle frame fixed with hold fasts in PCC 1:2:4 type B1, 20mm x 6mm flat iron hinges with locking arrangement including lock sixty five mm, brass and keys(Godrej/Shell), MS handles and applying two coats of synthetic enamel paint over a coat of red oxide zinc chrome primer to all steel surfaces including excavation & earth work in any kind of soil /soft disintegrated rock and disposal of surplus soil to a distance not exceeding 50 metre complete all as specified and as directed.
Supply, Installation, testing and commissioning of LT feeder pillar box, factory made, CPRI approved, Indoor type floor mounting with channel iron pedestal frame made out of 2.00 mm thick CRCA sheet steel and MS angle section 40x40x6mm base frame compartmental type, dust proof, free standing, suitable for working on 440 volts 3 phase 50 Hz A C supply, vermin proof, front and rear opening, hinged doors etc., powder coated as per seven tank process and IP 54 protection, cable alley, cable entry hole at the bottom, earth strip 25x4mm , 3 phase and neutral copper bus bar of 200 amps with non adhesive colour coded insulation sleeves mounted on insulators, drilled holes on bus bar strips for tapping including nuts bolts and washers, PCC works complete with copper strips of suitable size for connecting MCCB complete and comprising of the following:-
(a) MCCB, 4 pole, 63 Amps with ultimate breaking capacity Icu-25A at 415 Volts and adjustable thermal magnetic release conforming to IEC 60947 Part-I/IS-13947-Part-I with breaking capacity Ics=100%Icu at 415 Volts of 25 KA, overload setting 70% to 100%, short circuit setting 5 to 10 times - 01 No. (Incoming)
Supply, install, testing and commissioning of Chemical dosing system along with dosing pumps pressure @ 5.5 kg/cm² and output (flow rate 0-5 litre/hour of the following specification with complete accessories like lead tubing, connecting nuts, ferrules, check valves etc., along with following components complete all as specified and as directed :-
(a) Preparation tank of net capacity 170 litre of FRP dosing tank 650mmxnet height 375mm+conical 300 mm gross height with stand 100 mm consisting of (i) Water inlet (ii) outlet with Y strainer (iii) Drain outlet (iv) Overflow pipe (v) Control bottom for sludge deposition (vi) Pot hole with cover (vii) Level gauge (viii) Agitator 120W,900rpm,1 phase flange mounted motor with plastics shaft and impeller.
(b) Service tank net capacity 100 ltrs of FRP dosing top dia 540mmx bottom dia 480mm x-height 575mm consisting of (i) Water inlet (ii) outlet with Y strainer (iii) Drain outlet (iv) Overflow pipe (v) Control bottom for sludge deposition (vi) Pot hole with cover (vii) Level gauge (viii) Agitator 120W, 900RPM, Single phase flange mounted motor with plastics shaft and impeller. (ix) Provision of mounting arrangement on lid/wall.
Note: Liquid end of dosing pump including accessories must be non metallic suitable for chlorination plant all as directed.
EXTERNAL ELECTRIC SUPPLY
Material and labour for road crossing/drain crossing by adopting trenchless tunneling work through specified pipe jacking method by erecting the equipment to true to the alignment and gradient by hydraulic pipe jacking technique complete including tunneling, excavation in any type of soils, hard rock etc., and including provision of MS casing pipe heavy duty of size 150 mm dia with 6 mm thick in any length with jointing materials to carry HT /LT UG cables of size upto 400 Sqmm and necessary conveyance charges of machinery and other required materials in co-ordination with the concerned authorities etc., complete all as specified and as directed.
Supply, Installation, testing and commissioning of transformer of capacity 500 KVA step down, Energy Efficiency Level 3, outdoor type, copper wound, vector group DYN, HT 11000 Volts, 3 phase, 50 Hz on primary side and 433 Volts, 3 phase, 4 wire on secondary side, 50 Hz with off load tap changer having tappings on HT side to vary secondary voltage by +5% to - 7.5 % instep of 2.5%. complete with standard fittings, cable end box both on HT and LT side, LT terminals extended with 20 mm x 3 mm "L" type copper strip connected with bracing for connecting cable lugs on LT side including initial filling of oil conforming to IS 335-1981 complete all as specified and as directed, including the following:-
(a) 01 No. cable end box on LV secondary side consisting of 04 Nos. porcelain bushing rods and nuts washers. (b) Oil conservator with oil level gauge. (c) Dehydrating breather with first filling of dehydrating agents. (d) Explosive vent (e) Thermometer pocket (f) Two earthing terminals on tank body to facilate fixing of 32 x 6 mm GI strips. (g) 01 No thermometer dial type vapor pressure type having range 0 to 120 degree centigrade with maximum temperature indicator and resetting device to maximum temperature including needles of temperature gauge max reading pained terminal.
(h) Oil level gauge (j) Oil drain valve with plug (k) Air release valve/plug (l) 4 Nos plain solid cast steel detachable rollers. (m) Oil filling port on top cover with plate. (n) Extra bushing for neutral out side the cable box and providing independent earthing for neutral. (o) First fill transformer oil confirming to relevant IS. (p) Vector group : DYN 11
Supply, fix, test and commissioning of LED street light luminaires, outdoor type 70Watts new generation energy saving and environmental friendly long life made up of pressure die cast aluminium housing with Polycarbonate cover having top opening, separate driver compartment with IP66 protection and impact resistance of IK07 with 10KV Built-in surge protection device roadway luminaire with high power LEDs as light source all as per Havells Cat No.ENDURAPEARLPLUSSL70WLED757PASYTOPCASTHO (or) techno-commercially equivalent of other specified makes including connecting with 2.50 Sqmm aluminium conductor PVC insulated twin core weather proof cable etc, fixed to wall/pole etc., complete all as specified and as directed.
Supply, fix, test and commissioning of compact, Aesthetic, Ecofriendly and Modern integrated solar street light 30W, 12V, 3150 Lumen in extruded aluminium construction with built-in SCC, high efficient monocrystalline Silicon Photo Voltaic panel 100 Wp, Maximum Power Point Tracking (MPPT) charge controller, 2 days backup, Lithium ferro Phosphate (LifeP04) battery 45 Ah, Hot Dip Galvanized Tubular (HDGT) Pole 5.0metre above ground level etc., all as per Cat No.LHSTAPU7AAI030 of Havells or techno-commercially equivalent of other specified make complete all as specified and as directed
Supply and fix factory made hot press moulded cable junction box, thermoplastic body, suitable for helogen free and weather proof for out door installation, IP 66 with integrated membranes / metric knockouts for cable entry suitable for cable size 16-35 sqmm with internal dimensions of 225 x 295 x 122 mm with hinged door, including provision of 2 way connector 415 Volts made out of polycarbonate or bakelite all as per Cat No DK 3500 G of Hensel or techno-commercially equivalent of other specified makes including provision of 1 No MCB of 6 Amps with DIN bar, drilling holes for cable connections, connecting incoming and or out going cables by providing suitable size of cable lugs/glands, fixed on pole by means of clamps made out of MS flat iron of size 25 mm x 3 mm etc., complete all as specified and as directed.
Supply, fabricate and installation of GI pipe bracket made out of medium grade GI tubing of 40mm bore of length 1.50metre bent to shape 120 degree by hot forgoing after filling of sand and fixed on pole / wall with 2 Nos of MS clamps made out 50 x 6mm Flat Iron of required length including bolts, nuts and washers etc., and painting with two coats of silver metallic paint over a coat of red oxide primer etc., complete all as specified and as directed.
Supply and fix compact air insulated bus bar trucking system with aluminium busbar 1000 Amps , 50 KA breaking capacity, IP 54 protection complete all as specified and as directed
Material and labour for Design Fabricating supply and errecting, connecting and testing totally enclosed LT cubicle panel board for 500 KVA Transformer main panel, 3 Phase 4 wire system, plinth mounted outdoor type double door front and back opening type, sloped canopy (Hood) on top extended 100mm all around, separate compartment for each control gear, cable alley, provision of knock out type plates for various sizes of cable in and out, incoming and out going feeders duly marked on revited plates etc complete CPRI approved factory made fabricated out of 3.15mm thick CRCA sheet duly treated through 7 tank pre treatment process and painted with epoxy powder coated mat finish of SIEMENS GREY structural RAL 7032 shade colour,built in industrial type locking arrangement on front and back, and pre wired with PVC insulated
multi stranded copper conductor for controls and monitors, PVC sleeved aluminium strip for connecting MCCBs, Panel mounted on Angle iron frame of 50x50x6mm thick duly painted and embedded in PCC 1:3:6 45 CM below ground level and 15 Cm above ground level and consisting the following:- (a) Bus bar aluminium duly insulated with colour coded heat shrinkable sleeve and mounted on suitable size of 'F' class insulators made of non hygroscopic, non combustible, track resistant high strength FRP insulators 1000 Amps for phases and neural set of 4 for RYB &N set of 04 - 01 set
(b) LT switch gear 440 Volts 3 phase, 4 wire 50 cycles, cubicle or truck type complete with air circuit breaker, overload protection, no-volt release with necessary CTs,meter and cable boxes of rating upto 1000 Amps-1 Nos incoming (c) MCCB Four Pole, 415 Volts, 50 Hz, 500 Amps adjustable Thermal and Fixed Magnetic type with rupturing capacity of 36 KA - 01 No (01 No Out goings for APFC panel) (d) MCCB Four Pole, 415 Volts, 50 Hz, 250 Amps adjustable Thermal and Fixed Magnetic type with rupturing capacity of 35 KA - 03 No (02 Nos Out goings for Sub panel power load , 1 No spare) (e) MCCB Four Pole, 415 Volts, 50 Hz, 160 Amps adjustable Thermal and Fixed Magnetic type with rupturing capacity of 35 KA - 03 No (02 No Out goings for light loads for Bldg,01 No as spare)
Material and labour for Design Fabricating supply and errecting, connecting and testing totally enclosed LT cubicle panel board for building power loads, 3 Phase, 4 wire system, plinth mounted outdoor type double door front and back opening type, sloped canopy (Hood) on top extended 100mm all around, separate compartment for each control gear, cable alley, provision of knock out type plates for various sizes of cable in and out, incoming and out going feeders duly marked on revited plates etc complete CPRI approved factory made fabricated out of 3.15mm thick CRCA sheet duly treated through 7 tank pre treatment process and painted with epoxy powder coated mat finish of SIEMENS GREY structural RAL 7032 shade colour,built in industrial type locking arrangement on front and back, and pre wired with PVC insulated
multi stranded copper conductor for controls and monitors, PVC sleeved aluminium strip for connecting MCCBs, Panel mounted on Angle iron frame of 50x50x6mm thick duly painted and embedded in PCC 1:3:6 45 CM below ground level and 15 Cm above ground level and consisting the following:- (a) Bus bar aluminium duly insulated with colour coded heat shrinkable sleeve and mounted on suitable size of 'F' class insulators made of non hygroscopic, non combustible, track resistant high strength FRP insulators 500 Amps for phases and neural set of 4 for RYB &N set of 04 - 01 set
Material and labour for Design Fabricating supply and errecting, connecting and testing totally enclosed LT cubicle panel board for building light loads, 3 Phase, 4 wire system, plinth mounted outdoor type double door front and back opening type, sloped canopy (Hood) on top extended 100mm all around, separate compartment for each control gear, cable alley, provision of knock out type plates for various sizes of cable in and out, incoming and out going feeders duly marked on revited plates etc complete CPRI approved factory made fabricated out of 3.15mm thick CRCA sheet duly treated through 7 tank pre treatment process and painted with epoxy powder coated mat finish of SIEMENS GREY structural RAL 7032 shade colour,built in industrial type locking arrangement on front and back, and pre wired with PVC insulated
multi stranded copper conductor for controls and monitors, PVC sleeved aluminium strip for connecting MCCBs, Panel mounted on Angle iron frame of 50x50x6mm thick duly painted and embedded in PCC 1:3:6 45 CM below ground level and 15 Cm above ground level and consisting the following:- (a) Bus bar aluminium duly insulated with colour coded heat shrinkable sleeve and mounted on suitable size of 'F' class insulators made of non hygroscopic, non combustible, track resistant high strength FRP insulators 300 Amps for phases and neural set of 4 for RYB &N set of 04 - 01 set
Material and labour for Design Fabricating supply and errecting, connecting and testing totally enclosed LT cubicle panel board for DG Set 100 KVA, 3 Phase, 4 wire system, plinth mounted outdoor type double door front and back opening type, sloped canopy (Hood) on top extended 100mm all around, separate compartment for each control gear, cable alley, provision of knock out type plates for various sizes of cable in and out, incoming and out going feeders duly marked on revited plates etc complete CPRI approved factory made fabricated out of 3.15mm thick CRCA sheet duly treated through 7 tank pre treatment process and painted with epoxy powder coated mat finish of SIEMENS GREY structural RAL 7032 shade colour,built in industrial type locking arrangement on front and back, and pre wired with PVC insulated
multi stranded copper conductor for controls and monitors, PVC sleeved aluminium strip for connecting MCCBs, Panel mounted on Angle iron frame of 50x50x6mm thick duly painted and embedded in PCC 1:3:6 45 CM below ground level and 15 Cm above ground level and consisting the following:- (a) Bus bar aluminium duly insulated with colour coded heat shrinkable sleeve and mounted on suitable size of 'F' class insulators made of non hygroscopic, non combustible, track resistant high strength FRP insulators 250 Amps for phases and neural set of 4 for RYB &N set of 04 - 01 set
Material and labour for Design Fabricating supply and errecting, connecting and testing totally enclosed LT cubicle panel board for DG Set 62.5 KVA, 3 Phase, 4 wire system, plinth mounted outdoor type double door front and back opening type, sloped canopy (Hood) on top extended 100mm all around, separate compartment for each control gear, cable alley, provision of knock out type plates for various sizes of cable in and out, incoming and out going feeders duly marked on revited plates etc complete CPRI approved factory made fabricated out of 3.15mm thick CRCA sheet duly treated through 7 tank pre treatment process and painted with epoxy powder coated mat finish of SIEMENS GREY structural RAL 7032 shade colour,built in industrial type locking arrangement on front and back, and pre wired with PVC insulated
multi stranded copper conductor for controls and monitors, PVC sleeved aluminium strip for connecting MCCBs, Panel mounted on Angle iron frame of 50x50x6mm thick duly painted and embedded in PCC 1:3:6 45 CM below ground level and 15 Cm above ground level and consisting the following:- (a) Bus bar aluminium duly insulated with colour coded heat shrinkable sleeve and mounted on suitable size of 'F' class insulators made of non hygroscopic, non combustible, track resistant high strength FRP insulators 200 Amps for phases and neural set of 4 for RYB &N set of 04 - 01 set
Material and labour for Design Fabricating supply and errecting, connecting and testing totally enclosed LT cubicle panel board for Lift control panel on roof top lift room, 3 Phase, 4 wire system, plinth mounted outdoor type double door front and back opening type, sloped canopy (Hood) on top extended 100mm all around, separate compartment for each control gear, cable alley, provision of knock out type plates for various sizes of cable in and out, incoming and out going feeders duly marked on revited plates etc complete CPRI approved factory made fabricated out of 3.15mm thick CRCA sheet duly treated through 7 tank pre treatment process and painted with epoxy powder coated mat finish of SIEMENS GREY structural RAL 7032 shade colour,built in industrial type locking arrangement on front and back, and pre wired with PVC insulated
multi stranded copper conductor for controls and monitors, PVC sleeved aluminium strip for connecting MCCBs, Panel mounted on Angle iron frame of 50x50x6mm thick duly painted and embedded in PCC 1:3:6 45 CM below ground level and 15 Cm above ground level and consisting the following:- (a) Bus bar aluminium duly insulated with colour coded heat shrinkable sleeve and mounted on suitable size of 'F' class insulators made of non hygroscopic, non combustible, track resistant high strength FRP insulators 150 Amps for phases and neural set of 4 for RYB &N set of 04 - 01 set
GEYSER
Supply, install, testing and commissioning of Geyser for New generation energy saving and environmental friendly long life versatile pressure die cast capacity 25 ltrs BEE 5 Star rated 2 kw, vertical type powder coated metallic body including drilling holes into the walls, provision of 2 Nos of 450 mm long Hot & cold PVC connections, 4 Nos of suitable size anchor bolts, nuts and washers, connecting up electrical and water supply lines, testing and making good disturbed surface etc.,complete all as specified and as directed.
FIRE FIGHTING SYSTEMS
Supplying, installation, testing and commissioning of electric driven terrace pump suitable for automatic operation and consisting of following complete in all respect as required:- (a) Horizontal type, multistage, centrifugal split casing pump of CI body and bronze impeller with Stainless Steel shaft, mechanical seal and flow of 900LPM and pressure of 3.5 kg/cm2 at terrace level, confirming to IS:1520 (b) Suitable HP SQ cage induction motor TEFC type suitable for operation on 415volts, 3phase, 50Hz, AC with IP55 class of protection for enclosure, horizontal foot mounted type with Class-'F' insulation, confirming to IS-325 (c) MS fabricated common base plate coupling, coupling guard, foundation bolts, etc as required (d) Suitable cement concrete foundation duly plastered with anti vibration pads.
Material and labour for Fabricate, supply, install, testing and commissioning of electrical control panel of cubical construction, floor mounted type, IEC-61439 standard fabricated out of 2mm thick CRCA sheet, compartmentalised with hinged lockable doors, dust and vermin proof, powder coated of approved shade after 7 tank treatment process, cable alley, inter connection, having switchgears and accessories mounting and internal wiring, earth terminals, numbering etc., complete in all respect, suitable for operation on 415V, 3 phase, 50 HZ, AC supply with enclosure protection class IP42 as required consisting the following:-
Note: (i) The starting of terrace pump shall be automatic i.e., with the opening of any hydrant valve or hose reel on any floor, the pump will start automatically with fall in line pressure. (ii) In addition, start/stop push buttons shall be provided at ground floors near internal hydrant for starting the pump manually. (iii) Option to operate terrace pump with remote in place of internal hydrant (iv) The control panel for terrace pump shall be provided near the pump in a suitable enclosure to avoid unauthorised operation.
Material and labour for Fabricate, supply, install, testing and commissioning of wall mounted remote indication panel for fire fighting system, IEC-61439, fabricated from not less than 1.6mm thick CRCA sheet, powder coated of approved shade after 7 tank treatment process, complete internal wiring, indicating lamps, relays, accessories, numbering, lettering complete in all respect and consisting of the following:- (a) ON/OFF indication of Terrace pump (b) Audio/Visual indication of operation of Terrace pump with reset push button (c) Pressure indication in Fire fighting system (pressure transducer to be installed under separate system)
Supply and Fix perforated cable tray with cover of size 100mm x 25mm, made out of 14 gauge (2.00mm thick) CRCA sheet and painted with powder coating fire red tint including horizontal and vertical bends, reducers, tees, cross-members and other accessories as required duly suspended from wall/fixed to wall with MS suspenders and including painting with post office red enamel paint complete all as specified and as directed.
Supply and lay control wiring with multicore copper stranded conductor of sizes 4 core x 1.5 sqmm, PVC insulated, PVC sheathed armoured UG cable between various sensors and system controller/starter etc., near terrace pump and outside on surface with connections at both end glands etc as required complete all as specified and as directed.
Supply and lay control wiring with multicore copper stranded conductor of sizes 4 core x 2.5 sqmm, PVC insulated, PVC sheathed armoured UG cable between various sensors and system controller/starter etc., near terrace pump and outside on surface with connections at both end glands etc as required complete all as specified and as directed.
Supply and Fix 20mm nominal bore, 30m long thermoplastic (textile reinforced) hose, Type-2 conforming to IS:12585:1988 complete all as specified and as directed.
Supply and Fix fire hose cabinet box of size 2100x900x718mm, made out of 16 gauge CRCA sheet with double leafed glazed shutters (glazed with 4mm thick glass) to accommodate two length of canvas hose (30m each), branch pipe, fire hose and nozzle, fireman axe, first aid hose and single outlet landing valve, including painted with powder coating fire red tint on out side and brilliant white on inside yard as per seven tank process over 2 coat of primer etc., complete all as specified and as directed. Note : Hose pipe, branch pipe nozzle and coupling shall be measured and paid separately.
Supply and Fix fire hose cabinet box for hose reel of size 20mm of 30m length made out of 18 gauge CRCA sheet with double leafed glazed shutters (Glazed with 4mm thick glass) complete with coupling branch pipe and nozzles, including painted with powder coating fire red tint on out side and brilliant white on inside yard as per seven tank process over 2 coat of primer etc., complete all as specified and as directed. Note : Hose pipe, branch pipe nozzle and coupling shall be measured and paid separately.
Material and labour for Fire points made out of MS angle iron 40x40x6mm cutting to size, welding etc., including rain protection canopy made out of 2.0mm thick CRCA sheet painting with two coats of synthetic enamel paint of red post office colour over a coat of red oxide primer including provision of necessary fixing arrangement on wall etc., complete all specified and as directed.
Supply and Fix Fire extinguisher CO2, light weight squeeze grip type, 4.50 Kg capacity confirming to IS:15683 etc., complete all as specified and as directed.
Supply and Fix Fire extinguisher Dry chemical powder (ABC powder) type, 4Kg capacity confirming to IS:15683 etc., complete all as specified and as directed.
SCHEDULE 'A' PART XVIII (MANNING AND OPERATION OF LIFTS DURING DEFECTS LIABILITY PERIOD) Note: This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only.
Notes for Items No.25.01 to 25.03 below:- (i) The outsourcing of operation of lifts by lift operator shall commence immediately after completion of entire work under Phase-III. (ii) Lift operator must have at least three years practical experience in lift erection and maintenance work or worked for five years as lift operator elsewhere in private sector. During emergencies, such as power failure, when lifts are trapped in between floors along with passengers, the operator must know how to release the passenger safely out from the lift at nearest floor landing. (iii) The lift operator must be available at lift site of Md Accn (48 Maj & above) at CDM during his eight hours duty time as specified. (iv) No payment will be made if lift operator absent and effective recovery @ Rs.1000/- shall be made for per shift per operator . (v) No escalations applicable to this schedule (Schedule 'A' Part XVIII) and nothing extra shall be payable. (vi) Proper attendance register shall be maintained. (vii) Log Sheet in prescribed format as directed/suggested by Engineer- in- Charge/ GE will have to be arranged and maintained by contractor/firm for which no extra payment paid on this account. (viii) Lift operator must wear proper uniform with name of operator and firm name embroided. It shall be the responsibility of the contractor to provide uniform to operator with out any extra cost. Dress code shall be as approved by GE. (ix) The staff engaged by contractor shall be well behaved and polite. Any misbehavior by any worker shall be taken up seriously. The concerned labour shall have to be removed immediately by the contractor and alternative arrangement for the same shall be made without any break. (x) Department shall not be responsible for any accident or injury to any labour while on work. It shall be the responsibility of the contractor to watch the welfare of the labour deployed by him. He shall keep a First Aid Box at site with all necessary medicines. (xi) The Contractor shall provide a Mobile phone (Kept at Lift Operator) with incoming & outgoing facility to contact in emergency during any breakdowns etc. (xii) Careful control on the plant and maintain clean and hygienic condition. (xiii) Any tradesman/employees shall not be allowed to continue their employment for more than 11 month.
Manning and operation of 04 (Four) lifts installed in 2 blocks (02 Lifts per Block) to serve Six floors (Ground floor and Five upper floors) including operation all E/M inventory pertains to lifts in three shifts per day each consisting of eight hours shift including Sundays & Holidays by employing the man power of qualified Lift operator - 01 person per shift in 03 shifts of 08 hours duration as per the following shift timings including reliever for weekly off for entire system comprising including maintenance of necessary records like log book etc complete for First year during defects liability period after physical completion, testing and taking over of Lifts by MES all as specified and as directed.
(a) Man power to be employed per day:- (i) Lift Operator - 03 Persons One Lift Operator per shift of 8 hours each for 3 shifts (b) Shift Timings :- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours
Manning and operation of 04 (Four) lifts installed in 2 blocks (02 Lifts per Block) to serve Six floors (Ground floor and Five upper floors) including operation all E/M inventory pertains to lifts in three shifts per day each consisting of eight hours shift including Sundays & Holidays by employing the man power of qualified Lift operator - 01 person per shift in 03 shifts of 08 hours duration as per the following shift timings including reliever for weekly off for entire system comprising including maintenance of necessary records like log book etc complete for the remaining period of First year and second year during defects liability period after completion of 11 months of handing over of plant by MES all as specified and as directed.
(a) Man power to be employed per day:- (i) Lift Operator - 03 Persons One Lift Operator per shift of 8 hours each for 3 shifts (b) Shift Timings :- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours
Manning and operation of 04 (Four) lifts installed in 2 blocks (02 Lifts per Block) to serve Six floors (Ground floor and Five upper floors) including operation all E/M inventory pertains to lifts in three shifts per day each consisting of eight hours shift including Sundays & Holidays by employing the man power of qualified Lift operator - 01 person per shift in 03 shifts of 08 hours duration as per the following shift timings including reliever for weekly off for entire system comprising including maintenance of necessary records like log book etc complete for the remaining period of second year during defects liability period after completion of 11 months of handing over of plant by MES all as specified and as directed.
(a) Man power to be employed per day:- (i) Lift Operator - 03 Persons One Lift Operator per shift of 8 hours each for 3 shifts (b) Shift Timings :- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours
SCHEDULE 'A' PART XIX (MANNING AND OPERATION OF STP PLANT DURING DEFECTS LIABILITY PERIOD)
Notes for Items No.26.01 to 26.03 below:- (i) Manning and operation shall be carried out by the OEM only (ii) Electricity and water for operation of the plant shall be issued by the department free of cost. (iii) The period of operation and maintenance will start from the date of handing over of STP to MES by contractor subject to nil defects at the time of handing over STP. Maintenance and operation of STP is accordingly planned during defects liability period for 02 years from date of handing over of STP to MES. (iv) No escalations applicable to this schedule (Schedule 'A' Part XX) and nothing extra shall be payable. (v) Sludge from drying beds shall be removed in closed container to out side MD Land (vi) The contractor shall operate and maintain all the T&P installed under this work at no extra cost. (vii) The manning and operation include supply of all consumables, chemicals for treating water, Filter medias and lubricants required for operation, smooth functioning and testing of STP Plants and allied E/M installations pertains to STP Plant. The details of consumables supplied by the contractor and used shall be recorded in MB date wise duly signed by JE and Engineer-in-Charge. (viii) The manufacturer shall comply and guarantee the authenticity of the product by providing Test Certificate with Hologram which will be provided by the Authrorised Distributor at the distribution point for each Batch of Product delivered on their letter head. (ix) The manufacturer will affix its hologram on each and every drum/container/bag. If the said product is delivered without the said hologram and/or it is seen to be tampered, then the product can be discarded as spurious. (x) All log sheets shall be maintained for every shift. The details of consumables used shall also recorded as directed by Engineer-in-Charge. (xi) During defects liability period, if the plant or any other E/M installation pertains to STP provided under this contract are found non operational, the same shall be repaired and made functionable at no extra cost to the department. (xii) Manning and operation shall be carried out round the clock including holidays with one FGM(Operator) for 3 shifts of 8 hours each and one Helper (Mate) for 01 General shift. In case of non operation of the plant on account of contractor’s default/non employment of operators, recovery at Rs. 2000/- per shift shall be recovered from contractor's dues. (xiii) Any tradesman/employees shall not be allowed to continue their employment for more than 11 month. (xiv) The manning and operation includes replacement of essential electrical and mechanical parts as decided by GE for smooth functioning of the plant. (xv) Close watch on test results of both initial and final output results. (xvi) Careful control on the plant and maintain clean and hygienic condition. (xvii) Area cleaning and maintenance of Plant premises.
Manning and operation, Routine maintenance of 01 (One) No of Sewage Treatment Plant of 80 KLD including all E/M inventory pertains to STP 80 KLD shall be carried out round the clock including all Sundays and public holidays by employing the man power and shift timings as mentioned below for operation of plant daily including supply of water treatment chemicals (i.e. Bio septic clean powder, sodium Hypochlorite, Dap enzyme, Calcium Hypo Chloride and Bleaching powder etc.,), Activated carbon Filter media (ACF). Activated Sand filter media (ASF), MBBR fluidized bio-media, Bacteria culture and other consumables required for smooth running of STP Plant and provision of reliever for weekly off and carrying out daily, weekly, monthly, quarterly & half yearly maintenance etc., complete for First year during defects liability period after physical completion, testing and taking over of plant by MES all as specified and as directed.
(a) Man power to be employed per day:- (i) FGM(SK) Operator - 03 Persons One FGM(Operator) per shift of 8 hours each for 3 shifts (ii) Helper (Mate) - 01 Person in General shift (b) Shift Timings for FGM(SK) Operator:- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours (c) Shift Timing for Helper:- (i) General Shift - 0900 hours to 1730 hours including 30 minutes lunch break from 1300 hours 1330 hours
NOTE: The unit rate quoted shall be deemed to include the cost of following provisions:- (a) ACF media shall be replaced with new media as per OEM instructions. ACF combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:430 Kg) (b) Activated sand Filter media (ASF) shall be replaced with new media as per OEM instructions. ASF Media combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:820Kg) (c) MBBR Fluidized media and Bacteria cutler level shall be maintained as recommended by OEM. If required additional media and Bacteria culture shall be added without any extra cost to the department. (d) Daily adding minimum quantity of following chemicals to STP:- (i) Bio-septic clean powder - 1 Kg / Day (ii) Sodium hypo Chloride consisting 14% chlorine content diluted ClNao - 10 Litre/Day (iii) Dap enzyme consisting 18:46:0, 18% Nitrogen and water super phosphates 46% by minimum weight - 1Kg/ Day
(e) Necessary log sheet shall be maintained by contractor duly signed by the contractor, JE and Engineer-in-Charge. (f) Necessary T&P, Hand gloves, Iron mesh jolley trap etc. shall be provided. (g) Daily consumption quantity of each item viz, Chemical Bio Culture Bacteria solution, Sodium Hypochloride etc shall be submitted.Also daily consumption of all chemicals shall be recorded in register and maintained at site.
Manning and operation, Routine maintenance of 01 (One) No of Sewage Treatment Plant of 80 KLD including all E/M inventory pertains to STP 80 KLD shall be carried out round the clock including all Sundays and public holidays by employing the man power and shift timings as mentioned below for operation of plant daily including supply of water treatment chemicals (i.e. Bio septic clean powder, sodium Hypochloride, Dap enzyme, Calcium Hypo Chloride and Bleaching powder etc.,), Activated carbon Filter media (ACF). Activated Sand filter media (ASF), MBBR fluidized bio-media, Bacteria culture and other consumables required for smooth running of STP Plant and provision of reliever for weekly off and carrying out daily, weekly, monthly, quarterly & half yearly maintenance etc., complete for the remaining period of First year and second year during defects liability period after completion of 11 months of handing over of plant by MES all as specified and as directed.
(a) Man power to be employed per day:- (i) FGM(SK) Operator - 03 Persons One FGM(Operator) per shift of 8 hours each for 3 shifts (ii) Helper (Mate) - 01 Person in General shift (b) Shift Timings for FGM(SK) Operator:- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours (c) Shift Timing for Helper:- (i) General Shift - 0900 hours to 1730 hours including 30 minutes lunch break from 1300 hours 1330 hours
NOTE: The unit rate quoted shall be deemed to include the cost of following provisions:- (a) ACF media shall be replaced with new media as per OEM instructions. ACF combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:430 Kg) (b) Activated sand Filter media (ASF) shall be replaced with new media as per OEM instructions. ASF Media combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:820Kg) (c) MBBR Fluidized media and Bacteria cutler level shall be maintained as recommended by OEM. If required additional media and Bacteria culture shall be added without any extra cost to the department. (d) Daily adding minimum quantity of following chemicals to STP:- (i) Bio-septic clean powder - 1 Kg / Day (ii) Sodium hypo Chloride consisting 14% chlorine content diluted ClNao - 10 Litre/Day (iii) Dap enzime consisting 18:46:0, 18% Nitrogen and water super phosphates 46% by minimum weight - 1Kg/ Day
(e) Necessary log sheet shall be maintained by contractor duly signed by the contractor, JE and Engineer-in-Charge. (f) Necessary T&P, Hand gloves, Iron mesh jolley trap etc. shall be provided. (g) Daily consumption quantity of each item viz, Chemical Bio Culture Bacteria solution, Sodium Hypochloride etc shall be submitted. Also daily consumption of all chemicals shall be recorded in register and maintained at site.
Manning and operation, Routine maintenance of 01 (One) No of Sewage Treatment Plant of 80 KLD including all E/M inventory pertains to STP 80 KLD shall be carried out round the clock including all Sundays and public holidays by employing the man power and shift timings as mentioned below for operation of plant daily including supply of water treatment chemicals (i.e. Bio septic clean powder, sodium Hypochloride, Dap enzyme, Calcium Hypo Chloride and Bleaching powder etc.,), Activated carbon Filter media (ACF). Activated Sand filter media (ASF), MBBR fluidized bio-media, Bacteria culture and other consumables required for smooth running of STP Plant and provision of reliever for weekly off and carrying out daily, weekly, monthly, quarterly & half yearly maintenance etc., complete for the remaining period of second year during defects liability period after completion of 22 months of handing over of plant by MES all as specified and as directed.
(a) Man power to be employed per day:- (i) FGM(SK) Operator - 03 Persons One FGM(Operator) per shift of 8 hours each for 3 shifts (ii) Helper (Mate) - 01 Person in General shift (b) Shift Timings for FGM(SK) Operator:- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours (c) Shift Timing for Helper:- (i) General Shift - 0900 hours to 1730 hours including 30 minutes lunch break from 1300 hours 1330 hours
NOTE: The unit rate quoted shall be deemed to include the cost of following provisions:- (a) ACF media shall be replaced with new media as per OEM instructions. ACF combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:78 Kg) (b) Activated sand Filter media (ASF) shall be replaced with new media as per OEM instructions. ASF Media combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:148Kg) (c) MBBR Fluidized media and Bacteria cutler level shall be maintained as recommended by OEM. If required additional media and Bacteria culture shall be added without any extra cost to the department. (d) Daily adding minimum quantity of following chemicals to STP:- (i) Bio-septic clean powder - 1 Kg / Day (ii) Sodium hypo Chloride consisting 14% chlorine content diluted ClNao - 10 Litre/Day (iii) Dap enzyme consisting 18:46:0, 18% Nitrogen and water super phosphates 46% by minimum weight - 1Kg/ Day
(e) Necessary log sheet shall be maintained by contractor duly signed by the contractor, JE and Engineer-in-Charge. (f) Necessary T&P, Hand gloves, Iron mesh jolley trap etc. shall be provided. (g) Daily consumption quantity of each item viz, Chemical Bio Culture Bacteria solution, Sodium Hypochloride etc shall be submitted. Also daily consumption of all chemicals shall be recorded in register and maintained at site.
SCHEDULE 'A' PART XX (MANNING AND OPERATION OF LIFTS AFTER DEFECTS LIABILITY PERIOD) Note: This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only.
Notes for Items No.27.01 to 27.04 below:- (i) The outsourcing of operation of lifts by lift operator shall commence immediately after completion of work under Phase-IV. (ii) Lift operator must have at least three years practical experience in lift erection and maintenance work or worked for five years as lift operator elsewhere in private sector. During emergencies, such as power failure, when lifts are trapped in between floors along with passengers, the operator must know how to release the passenger safely out from the lift at nearest floor landing. (iii) The lift operator must be available at lift site of Md Accn (48 Maj & above) at CDM during his eight hours duty time as specified. (iv) No payment will be made if lift operator absent and effective recovery @ Rs.1000/- shall be made for per shift per operator . (v) No escalations applicable to this schedule (Schedule 'A' Part XIX) and nothing extra shall be payable. (vi) Proper attendance register shall be maintained. (vii) Log Sheet in prescribed format as directed/suggested by Engineer- in- Charge/ GE will have to be arranged and maintained by contractor/firm for which no extra payment paid on this account. (viii) Lift operator must wear proper uniform with name of operator and firm name embroided. It shall be the responsibility of the contractor to provide uniform to operator with out any extra cost. Dress code shall be as approved by GE. (ix) The staff engaged by contractor shall be well behaved and polite. Any misbehavior by any worker shall be taken up seriously. The concerned labour shall have to be removed immediately by the contractor and alternative arrangement for the same shall be made without any break. (x) Department shall not be responsible for any accident or injury to any labour while on work. It shall be the responsibility of the contractor to watch the welfare of the labour deployed by him. He shall keep a First Aid Box at site with all necessary medicines. (xi) The Contractor shall provide a Mobile phone (Kept at Lift Operator) with incoming & outgoing facility to contact in emergency during any breakdowns etc. (xii) Careful control on the plant and maintain clean and hygienic condition. (xiii) Any tradesman/employees shall not be allowed to continue their employment for more than 11 month.
Manning and operation of 04 (Four) lifts installed in 2 blocks (02 Lifts per Block) to serve Six floors (Ground floor and Five upper floors) including operation all E/M inventory pertains to lifts in three shifts per day each consisting of eight hours shift including Sundays & Holidays by employing the man power of qualified Lift operator - 01 person per shift in 03 shifts of 08 hours duration as per the following shift timings including reliever for weekly off for entire system comprising including maintenance of necessary records like log book etc complete for First year after defects liability period, i.e after completion of 24 months of handing over of Lifts by MES all as specified and as directed.
(a) Man power to be employed per day:- (i) Lift Operator - 03 Persons One Lift Operator per shift of 8 hours each for 3 shifts (b) Shift Timings :- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours
Manning and operation of 04 (Four) lifts installed in 2 blocks (02 Lifts per Block) to serve Six floors (Ground floor and Five upper floors) including operation all E/M inventory pertains to lifts in three shifts per day each consisting of eight hours shift including Sundays & Holidays by employing the man power of qualified Lift operator - 01 person per shift in 03 shifts of 08 hours duration as per the following shift timings including reliever for weekly off for entire system comprising including maintenance of necessary records like log book etc complete for the remaining period of First year and second year after defects liability period (i.e after 35 months of handing over of Lifts by MES all as specified and as directed.
(a) Man power to be employed per day:- (i) Lift Operator - 03 Persons One Lift Operator per shift of 8 hours each for 3 shifts (b) Shift Timings :- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours
Manning and operation of 04 (Four) lifts installed in 2 blocks (02 Lifts per Block) to serve Six floors (Ground floor and Five upper floors) including operation all E/M inventory pertains to lifts in three shifts per day each consisting of eight hours shift including Sundays & Holidays by employing the man power of qualified Lift operator - 01 person per shift in 03 shifts of 08 hours duration as per the following shift timings including reliever for weekly off for entire system comprising including maintenance of necessary records like log book etc complete for the remaining period of Second year and third year after defects liability period (i.e after 46 months of handing over of Lifts by MES all as specified and as directed.
(a) Man power to be employed per day:- (i) Lift Operator - 03 Persons One Lift Operator per shift of 8 hours each for 3 shifts (b) Shift Timings :- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours
Manning and operation of 04 (Four) lifts installed in 2 blocks (02 Lifts per Block) to serve Six floors (Ground floor and Five upper floors) including operation all E/M inventory pertains to lifts in three shifts per day each consisting of eight hours shift including Sundays & Holidays by employing the man power of qualified Lift operator - 01 person per shift in 03 shifts of 08 hours duration as per the following shift timings including reliever for weekly off for entire system comprising including maintenance of necessary records like log book etc complete for the remaining period of third year after defects liability period (i.e after 57 months of handing over of Lifts by MES all as specified and as directed.
(a) Man power to be employed per day:- (i) Lift Operator - 03 Persons One Lift Operator per shift of 8 hours each for 3 shifts (b) Shift Timings :- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours
SCHEDULE 'A' PART XXI (MANNING AND OPERATION OF STP PLANT AFTER DEFECTS LIABILITY PERIOD)
Notes for Items No.28.01 to 28.04 below:- (i) Manning and operation shall be carried out by the OEM only (ii) Electricity and water for operation of the plant shall be issued by the department free of cost. (iii) The period of operation and maintenance will start from the date of handing over of STP to MES by contractor subject to nil defects at the time of handing over STP. Maintenance and operation of STP is accordingly planned for 03 years after defects liability period. (iv) No escalations applicable to this schedule (Schedule 'A' Part XX) and nothing extra shall be payable. (v) Sludge from drying beds shall be removed in closed container to out side MD Land (vi) The contractor shall operate and maintain all the T&P installed under this work at no extra cost. (vii) The manning and operation include supply of all consumables, chemicals for treating water, Filter medias and lubricants required for operation, smooth functioning and testing of STP Plants and allied E/M installations pertains to STP Plant. The details of consumables supplied by the contractor and used shall be recorded in MB date wise duly signed by JE and Engineer-in-Charge. (viii) The manufacturer shall comply and guarantee the authenticity of the product by providing Test Certificate with Hologram which will be provided by the Authrorised Distributor at the distribution point for each Batch of Product delivered on their letter head. (ix) The manufacturer will affix its hologram on each and every drum/container/bag. If the said product is delivered without the said hologram and/or it is seen to be tampered, then the product can be discarded as spurious. (x) All log sheets shall be maintained for every shift. The details of consumables used shall also recorded as directed by Engineer-in-Charge. (xi) During defects liability period, if the plant or any other E/M installation pertains to STP provided under this contract are found non operational, the same shall be repaired and made functionable at no extra cost to the department. (xii) Manning and operation shall be carried out round the clock including holidays with one FGM(Operator) for 3 shifts of 8 hours each and one Helper (Mate) for 01 General shift. In case of non operation of the plant on account of contractor’s default/non employment of operators, recovery at Rs. 2000/- per shift shall be recovered from contractor's dues. (xiii) Any tradesman/employees shall not be allowed to continue their employment for more than 11 month. (xiv) The manning and operation includes replacement of essential electrical and mechanical parts as decided by GE for smooth functioning of the plant. (xv) Close watch on test results of both initial and final output results. (xvi) Careful control on the plant and maintain clean and hygienic condition. (xvii) Area cleaning and maintenance of Plant premises.
Manning and operation, Routine maintenance of 01 (One) No of Sewage Treatment Plant of 80 KLD including all E/M inventory pertains to STP 80 KLD shall be carried out round the clock including all Sundays and public holidays by employing the man power and shift timings as mentioned below for operation of plant daily including supply of water treatment chemicals (i.e. Bio septic clean powder, sodium Hypochloride, Dap enzyme, Calcium Hypo Chloride and Bleaching powder etc.,), Activated carbon Filter media (ACF). Activated Sand filter media (ASF), MBBR fluidized bio-media, Bacteria culture and other consumables required for smooth running of STP Plant and provision of reliever for weekly off and carrying out daily, weekly, monthly, quarterly & half yearly maintenance etc., complete for the period of first year after defects liability period i.e after completion of 24 months of handing over of plant by MES all as specified and as directed.
(a) Man power to be employed per day:- (i) FGM(SK) Operator - 03 Persons One FGM(Operator) per shift of 8 hours each for 3 shifts (ii) Helper (Mate) - 01 Person in General shift (b) Shift Timings for FGM(SK) Operator:- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours (c) Shift Timing for Helper:- (i) General Shift - 0900 hours to 1730 hours including 30 minutes lunch break from 1300 hours 1330 hours
NOTE: The unit rate quoted shall be deemed to include the cost of following provisions:- (a) ACF media shall be replaced with new media as per OEM instructions. ACF combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:430 Kg) (b) Activated sand Filter media (ASF) shall be replaced with new media as per OEM instructions. ASF Media combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:820Kg) (c) MBBR Fluidized media and Bacteria cutler level shall be maintained as recommended by OEM. If required additional media and Bacteria culture shall be added without any extra cost to the department. (d) Daily adding minimum quantity of following chemicals to STP:- (i) Bio-septic clean powder - 1 Kg / Day (ii) Sodium hypo Chloride consisting 14% chlorine content diluted ClNao - 10 Litre/Day (iii) Dap enzyme consisting 18:46:0, 18% Nitrogen and water super phosphates 46% by minimum weight - 1Kg/ Day
(e) Necessary log sheet shall be maintained by contractor duly signed by the contractor, JE and Engineer-in-Charge. (f) Necessary T&P, Hand gloves, Iron mesh jolley trap etc. shall be provided. (g) Daily consumption quantity of each item viz, Chemical Bio Culture Bacteria solution, Sodium Hypochloride etc shall be submitted. Also daily consumption of all chemicals shall be recorded in register and maintained at site.
Manning and operation, Routine maintenance of 01 (One) No of Sewage Treatment Plant of 80 KLD including all E/M inventory pertains to STP 80 KLD shall be carried out round the clock including all Sundays and public holidays by employing the man power and shift timings as mentioned below for operation of plant daily including supply of water treatment chemicals (i.e. Bio septic clean powder, sodium Hypochloride, Dap enzyme, Calcium Hypo Chloride and Bleaching powder etc.,), Activated carbon Filter media (ACF). Activated Sand filter media (ASF), MBBR fluidized bio-media, Bacteria culture and other consumables required for smooth running of STP Plant and provision of reliever for weekly off and carrying out daily, weekly, monthly, quarterly & half yearly maintenance etc., complete for the remaining period of First year and second year after defects liability period (i.e after 35 months of handing over of STP) all as specified and as directed.
(a) Man power to be employed per day:- (i) FGM(SK) Operator - 03 Persons One FGM(Operator) per shift of 8 hours each for 3 shifts (ii) Helper (Mate) - 01 Person in General shift (b) Shift Timings for FGM(SK) Operator:- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours (c) Shift Timing for Helper:- (i) General Shift - 0900 hours to 1730 hours including 30 minutes lunch break from 1300 hours 1330 hours
NOTE: The unit rate quoted shall be deemed to include the cost of following provisions:- (a) ACF media shall be replaced with new media as per OEM instructions. ACF combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:430 Kg) (b) Activated sand Filter media (ASF) shall be replaced with new media as per OEM instructions. ASF Media combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:820Kg) (c) MBBR Fluidized media and Bacteria cutler level shall be maintained as recommended by OEM. If required additional media and Bacteria culture shall be added without any extra cost to the department. (d) Daily adding minimum quantity of following chemicals to STP:- (i) Bio-septic clean powder - 1 Kg / Day (ii) Sodium hypo Chloride consisting 14% chlorine content diluted ClNao - 10 Litre/Day (iii) Dap enzyme consisting 18:46:0, 18% Nitrogen and water super phosphates 46% by minimum weight - 1Kg/ Day
(e) Necessary log sheet shall be maintained by contractor duly signed by the contractor, JE and Engineer-in-Charge. (f) Necessary T&P, Hand gloves, Iron mesh jolley trap etc. shall be provided. (g) Daily consumption quantity of each item viz, Chemical Bio Culture Bacteria solution, Sodium Hypochloride etc shall be submitted. Also daily consumption of all chemicals shall be recorded in register and maintained at site.
Manning and operation, Routine maintenance of 01 (One) No of Sewage Treatment Plant of 80 KLD including all E/M inventory pertains to STP 80 KLD shall be carried out round the clock including all Sundays and public holidays by employing the man power and shift timings as mentioned below for operation of plant daily including supply of water treatment chemicals (i.e. Bio septic clean powder, sodium Hypochloride, Dap enzyme, Calcium Hypo Chloride and Bleaching powder etc.,), Activated carbon Filter media (ACF). Activated Sand filter media (ASF), MBBR fluidized bio-media, Bacteria culture and other consumables required for smooth running of STP Plant and provision of reliever for weekly off and carrying out daily, weekly, monthly, quarterly & half yearly maintenance etc., complete for the remaining period of Second year and third year after defects liability period (i.e after 46 months of handing over of STP) all as specified and as directed.
(a) Man power to be employed per day:- (i) FGM(SK) Operator - 03 Persons One FGM(Operator) per shift of 8 hours each for 3 shifts (ii) Helper (Mate) - 01 Person in General shift (b) Shift Timings for FGM(SK) Operator:- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours (c) Shift Timing for Helper:- (i) General Shift - 0900 hours to 1730 hours including 30 minutes lunch break from 1300 hours 1330 hours
NOTE: The unit rate quoted shall be deemed to include the cost of following provisions:- (a) ACF media shall be replaced with new media as per OEM instructions. ACF combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:430 Kg) (b) Activated sand Filter media (ASF) shall be replaced with new media as per OEM instructions. ASF Media combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:820Kg) (c) MBBR Fluidized media and Bacteria cutler level shall be maintained as recommended by OEM. If required additional media and Bacteria culture shall be added without any extra cost to the department. (d) Daily adding minimum quantity of following chemicals to STP:- (i) Bio-septic clean powder - 1 Kg / Day (ii) Sodium hypo Chloride consisting 14% chlorine content diluted ClNao - 10 Litre/Day (iii) Dap enzyme consisting 18:46:0, 18% Nitrogen and water super phosphates 46% by minimum weight - 1Kg/ Day
(e) Necessary log sheet shall be maintained by contractor duly signed by the contractor, JE and Engineer-in-Charge. (f) Necessary T&P, Hand gloves, Iron mesh jolley trap etc. shall be provided. (g) Daily consumption quantity of each item viz, Chemical Bio Culture Bacteria solution, Sodium Hypochloride etc shall be submitted. Also daily consumption of all chemicals shall be recorded in register and maintained at site.
Manning and operation, Routine maintenance of 01 (One) No of Sewage Treatment Plant of 80 KLD including all E/M inventory pertains to STP 80 KLD shall be carried out round the clock including all Sundays and public holidays by employing the man power and shift timings as mentioned below for operation of plant daily including supply of water treatment chemicals (i.e. Bio septic clean powder, sodium Hypochloride, Dap enzyme, Calcium Hypo Chloride and Bleaching powder etc.,), Activated carbon Filter media (ACF). Activated Sand filter media (ASF), MBBR fluidized bio-media, Bacteria culture and other consumables required for smooth running of STP Plant and provision of reliever for weekly off and carrying out daily, weekly, monthly, quarterly & half yearly maintenance etc., complete for the remaining period of third year after defects liability period (i.e after 57 months of handing over of STP) all as specified and as directed.
(a) Man power to be employed per day:- (i) FGM(SK) Operator - 03 Persons One FGM(Operator) per shift of 8 hours each for 3 shifts (ii) Helper (Mate) - 01 Person in General shift (b) Shift Timings for FGM(SK) Operator:- (i) First Shift - 0600 hours to 1400 hours (ii) Second Shift - 1400 hours to 2200 hours (iii) Third Shift - 2200 hours to 0600 hours (c) Shift Timing for Helper:- (i) General Shift - 0900 hours to 1730 hours including 30 minutes lunch break from 1300 hours 1330 hours
NOTE: The unit rate quoted shall be deemed to include the cost of following provisions:- (a) ACF media shall be replaced with new media as per OEM instructions. ACF combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:120 Kg) (b) Activated sand Filter media (ASF) shall be replaced with new media as per OEM instructions. ASF Media combination Quality & quantity shall be as directed and recommended by OEM. (Approx Qty:223Kg) (c) MBBR Fluidized media and Bacteria cutler level shall be maintained as recommended by OEM. If required additional media and Bacteria culture shall be added without any extra cost to the department. (d) Daily adding minimum quantity of following chemicals to STP:- (i) Bio-septic clean powder - 1 Kg / Day (ii) Sodium hypo Chloride consisting 14% chlorine content diluted ClNao - 10 Litre/Day (iii) Dap enzyme consisting 18:46:0, 18% Nitrogen and water super phosphates 46% by minimum weight - 1Kg/ Day
(e) Necessary log sheet shall be maintained by contractor duly signed by the contractor, JE and Engineer-in-Charge. (f) Necessary T&P, Hand gloves, Iron mesh jolley trap etc. shall be provided. (g) Daily consumption quantity of each item viz, Chemical Bio Culture Bacteria solution, Sodium Hypochloride etc shall be submitted. Also daily consumption of all chemicals shall be recorded in register and maintained at site.
Sri Raghava Constructions Ltd
varsha construction
Sukhdevraj Sharma Engineers & Contractors Pvt Ltd
R. Wadhumal and Sons
SOOD ASSOCIATES PVT LTD
Phoenix Infra
GOPAL TEKNOCON PRIVATE LIMITED
N R Constructions
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid