| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹23.5 L (13.5%)Admitted-Finance | ₹2.0 Cr+₹23.5 L (13.5%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹25.5 L (14.7%)Admitted-Finance | ₹2.0 Cr+₹25.5 L (14.7%) | L3 | Admitted-Finance |
| 4 | L4₹2.0 Cr+₹26.1 L (15.0%)Admitted-Finance | ₹2.0 Cr+₹26.1 L (15.0%) | L4 | Admitted-Finance |
| 5 | L5₹2.0 Cr+₹29.0 L (16.7%)Admitted-Finance | ₹2.0 Cr+₹29.0 L (16.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | tariq mohd mir L16 | M/S BUKHARI CONSTRUCTIONS L11 | M.N.Enterprises L7 | M.M.CONTRUCTIONS L6 | M/s Shalimar Constructions L9 | M/S MIR and CO L5 | KASHCON CONSTRUCTIONS L13 | M/s GHULAM MOHAMMAD RATHER AND CO L14 | M/S BASHIR AHMAD BANGROO L15 | M/S ALI MOHAMMAD PARRAY L10 | M/S BHAT CONSTRUCTIONS L4 | M/S GHULAM NABI PARAY L2 | Ghulam Mohammad Bhat L8 | GH AHMAD KHANDAY L3 | M/S AL KHADEEJ INFRA STRUCTURE L1 | M/S MEHRAJUDIN DAR L12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in bulk excavation by mechanical means (Hydraulic Excavator ) over area (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan ) incl. disposal of excavated earth lead upto 50 meters and left up to 1.5m as directed by Engineer Incharge ( All kind of soil ) | 5,000 | cum | 200 ₹10,00,000 | 300 ₹15,00,000 | 100 ₹5,00,000 | 150 ₹7,50,000 | 360 ₹18,00,000 | 70 ₹3,50,000 | 250 ₹12,50,000 | 100 ₹5,00,000 | 175 ₹8,75,000 | 150 ₹7,50,000 | 30 ₹1,50,000 Lowest | 100 ₹5,00,000 | 50 ₹2,50,000 | 100 ₹5,00,000 | 80 ₹4,00,000 | 150 ₹7,50,000 |
| 2.00 | Earth work in excavation by mechanical means in foundation trenchesetc (not exceeding 1.5 mtr in width) and for shafts wells, cesspits and the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottom lifts upto 1.5m including getting out excavated earth and disposal of surplus excavated earth as directed within 50 meter | 1,680 | cum | 311 ₹5,22,480 | 200 ₹3,36,000 | 100 ₹1,68,000 | 155 ₹2,60,400 | 15 ₹25,200 Lowest | 200 ₹3,36,000 | 100 ₹1,68,000 | 140 ₹2,35,200 | 175 ₹2,94,000 | 100 ₹1,68,000 | 100 ₹1,68,000 | 100 ₹1,68,000 | 50 ₹84,000 | 100 ₹1,68,000 | 80 ₹1,34,400 | 150 ₹2,52,000 |
| 3.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: incl. carriage complete. 1:4:8( 1 cement :4 coarsed sand : 8 graded stone aggregate 40 mm nominal size ) | 161 | cum | 3,400 ₹5,47,400 | 3,000 ₹4,83,000 | 3,000 ₹4,83,000 | 5,998 ₹9,65,678 | 2,600 ₹4,18,600 | 3,500 ₹5,63,500 | 3,500 ₹5,63,500 | 3,300 ₹5,31,300 | 3,800 ₹6,11,800 | 2,500 ₹4,02,500 | 2,900 ₹4,66,900 | 1,700 ₹2,73,700 Lowest | 3,250 ₹5,23,250 | 1,900 ₹3,05,900 | 3,000 ₹4,83,000 | 3,800 ₹6,11,800 |
| 4.00 | Reinforced Cement Concrete work in walls (any thickness ) incl. attached plaster, bultreses, plinth and string course, fillets, colums, pillars, piers, abutments, post and struts upto floor fine level including curing but excluding cost of form work, fixing & reinforcement 1:11/2 :3 (1 cement 11/2 coursed sand : 3 graded aggrigate 20 mm nominal size ) incl. carriage all complete | 1,064 | cum | 7,450 ₹79,26,800 | 7,000 ₹74,48,000 | 6,800 ₹72,35,200 | 6,404 ₹68,13,856 | 7,100 ₹75,54,400 | 7,800 ₹82,99,200 | 6,500 ₹69,16,000 | 7,300 ₹77,67,200 | 7,200 ₹76,60,800 | 7,100 ₹75,54,400 | 7,000 ₹74,48,000 | 6,800 ₹72,35,200 | 7,750 ₹82,46,000 | 6,800 ₹72,35,200 | 5,600 ₹59,58,400 Lowest | 6,900 ₹73,41,600 |
| 5.00 | Centring and shuttering including strutting, propping etc. and removal of form work for wall ( any thicknees) including attached plasters, bultreses, plinth and string courses etc. | 6,475 | sqm | 175 ₹11,33,125 | 175 ₹11,33,125 | 240 ₹15,54,000 | 247 ₹15,99,325 | 270 ₹17,48,250 | 200 ₹12,95,000 | 300 ₹19,42,500 | 190 ₹12,30,250 | 400 ₹25,90,000 | 400 ₹25,90,000 | 150 ₹9,71,250 | 300 ₹19,42,500 | 150 ₹9,71,250 | 195 ₹12,62,625 | 100 ₹6,47,500 Lowest | 250 ₹16,18,750 |
| 6.00 | Steel reinforcement for RCC works incl. straightening, cutting, binding & placing in position i/c cost of binding wire all complete above plinth level. Incl. carriage and complete job. | 1,47,000 | kg | 75.6 ₹1,11,13,200 | 70 ₹1,02,90,000 | 70 ₹1,02,90,000 | 65.5 ₹96,28,500 | 62 ₹91,14,000 Lowest | 64 ₹94,08,000 | 75 ₹1,10,25,000 | 81 ₹1,19,07,000 | 70 ₹1,02,90,000 | 63.5 ₹93,34,500 | 73 ₹1,07,31,000 | 65 ₹95,55,000 | 69.5 ₹1,02,16,500 | 71 ₹1,04,37,000 | 66.1 ₹97,16,700 | 73 ₹1,07,31,000 |
| 7.00 | Flling of avaliable excavated earth ( excluding rock ) in trenches, plinth, sides of foundation etc in layer not exceeding 20 cm in depth, consolidation each deposited layer by ramming and watering lead upto 50 m and lift up 1.5 m all complete job. | 1,190 | cum | 211 ₹2,51,090 | 100 ₹1,19,000 | 80 ₹95,200 | 240 ₹2,85,600 | 15 ₹17,850 Lowest | 30 ₹35,700 | 50 ₹59,500 | 50 ₹59,500 | 50 ₹59,500 | 100 ₹1,19,000 | 50 ₹59,500 | 50 ₹59,500 | 50 ₹59,500 | 25 ₹29,750 | 40 ₹47,600 | 150 ₹1,78,500 |
Tender Value
₹2.7 Cr
Closing Date
16 Mar 2021, 4:00 pmClosed
DGM Housing Board Unit-I Srinagar
Office of the Deputy General Manager Housing Board Unit-I, Barbar Shah, Srinagar
Construction of School of Architecture at Safapora Ganderbal (Phase Ist)
2021_HAUDD_118359_1
E-NIT No. 12 of 2020-21 Dated 25-02-2021
Open Tender
Civil Works
Item Rate
540 days
Safapora
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,500
Credited in A/c 0361040500004285 (JAKA0RAWWAL)
Exempted
8 Apr 2021
26 Feb 2021
17 Mar 2021
26 Feb 2021
16 Mar 2021
26 Feb 2021
Amount
Earth work in bulk excavation by mechanical means (Hydraulic Excavator ) over area (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan ) incl. disposal of excavated earth lead upto 50 meters and left up to 1.5m as directed by Engineer Incharge ( All kind of soil )
Earth work in excavation by mechanical means in foundation trenchesetc (not exceeding 1.5 mtr in width) and for shafts wells, cesspits and the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottom lifts upto 1.5m including getting out excavated earth and disposal of surplus excavated earth as directed within 50 meter
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: incl. carriage complete. 1:4:8( 1 cement :4 coarsed sand : 8 graded stone aggregate 40 mm nominal size )
Reinforced Cement Concrete work in walls (any thickness ) incl. attached plaster, bultreses, plinth and string course, fillets, colums, pillars, piers, abutments, post and struts upto floor fine level including curing but excluding cost of form work, fixing & reinforcement 1:11/2 :3 (1 cement 11/2 coursed sand : 3 graded aggrigate 20 mm nominal size ) incl. carriage all complete
Centring and shuttering including strutting, propping etc. and removal of form work for wall ( any thicknees) including attached plasters, bultreses, plinth and string courses etc.
Steel reinforcement for RCC works incl. straightening, cutting, binding & placing in position i/c cost of binding wire all complete above plinth level. Incl. carriage and complete job.
Flling of avaliable excavated earth ( excluding rock ) in trenches, plinth, sides of foundation etc in layer not exceeding 20 cm in depth, consolidation each deposited layer by ramming and watering lead upto 50 m and lift up 1.5 m all complete job.
M/S GHULAM NABI PARAY
GH AHMAD KHANDAY
M/S BHAT CONSTRUCTIONS
M/S MIR and CO
M.M.CONTRUCTIONS
M.N.Enterprises
Ghulam Mohammad Bhat
M/s Shalimar Constructions
M/S ALI MOHAMMAD PARRAY
M/S BUKHARI CONSTRUCTIONS
M/S MEHRAJUDIN DAR
KASHCON CONSTRUCTIONS
M/s GHULAM MOHAMMAD RATHER AND CO
M/S BASHIR AHMAD BANGROO
tariq mohd mir
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_227228.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .